POWER GRID CORPORATION OF INDIA LTD.
SRLDC, BANGALORE An Overview of SOUTHERN REGION GRID OPERATION Shri L.K.Kanungo DGM(O)
2
LINKS INTRODUCTION IEGCPARAMATERS ABT SR GRID SR GRID MAP
INTER-REGIONAL LINKS HIGHLIGHTS SR INSTALLED CAPACITY STATEWISE BREAKUP OF I/C GROWTH OF I/C & PEAK DEMAND IMPORT THROUGH HVDC INTER-REGIONAL IMPORTS FREQ SPECTRUM U/F RELAY VOLTAGE SPECTRUM TYPICAL CITY LOADS 3D FREQUENCY DEC-02 EXPECTED T/L EXPECTED GENERATION 3D DEMAND DEC-02 INTER-STATE TIE LINES SHARE ALLOCATION TALCHER CGS GEN COST INTER-REGIONAL IMPORTS 5 Yrs PROBLEMS SOLUTIONS RESERVOIR POSITION ANDHRA PRADESH KARNATAKA KERALA TAMIL NADU Hierarchy of ULDC Communication Channel Control Centres ULDC PROJECT
3
ANDHRA PRADESH QUICK FACTS GRID HIGHLIGHTS INSTALLED CAPACITY
CONSUMER PROFILE PROBLEMS GZK EVACUATION VTS & LANCO EVACUATION KTS EVACUATION TWIN CITY RING MAIN HYDRO THERMAL N’SAGAR & SRISAILAM RESERVOIR JALAPUT RESERVOIR EXPECTED GEN. ADDITIONS EXPECTED TRANS. ADDITIONS COST OF GENERATORS NATURAL ADVANTAGES POWER REFORMS 3D DEMAND DEC-02 REACTIVE POWER MANAGEMENT
4
KARNATAKA EVOLUTION PSP 1975 PSP 1985 PSP 1995 QUICK FACTS
GRID HIGHLIGHTS INSTALLED CAPACITY CONSUMER PROFILE PROBLEMS RTPS EVACUATION KAPS & NJPH EVACUATION NELAMANGALA FINAL NELAMANGALA PRESENT SHARAVATHY FINAL SHARAVATHY RIVERS AND RESERVOIRS 220KV T/L EXPECTED EXPECTED GEN. ADDITIONS 400KV T/L 3D DEMAND DEC-02 VARIABLE COSTS SHORT CKT LEVEL
5
KERALA QUICK FACTS GRID HIGHLIGHTS INSTALLED CAPACITY CONSUMER PROFILE
PROBLEMS WIND MILL POTENTIAL GENERATION SCHEME GROWTH OF PER CAPITA INCOME INFLOWS OF IDDUKI & KAKKI BREAKUP OF ENERGY CONSUMED GROWTH OF I/C Vs DEMAND GROWTH OF GEN & CONSUMPTION POWER MAP EXPECTED GEN. ADDITIONS 3D DEMAND DEC-02 VARIABLE COSTS
6
TAMIL NADU QUICK FACTS GRID HIGHLIGHTS INSTALLED CAPACITY
CONSUMER PROFILE PROBLEMS PROXIMICITY OF GENERATING STN. LOAD CENTRES TYPICAL LOADS IN MAIN CITIES LIST OF HYDRO STATIONS PUMP STORAGE WIND ENERGY CHENNAI SUPPLY TOTAL INFLOWS EXPECTED GEN. ADDITIONS EXPECTED TRANS. ADDITIONS 3D DEMAND DEC-02 VARIABLE COSTS
7
SOUTHERN REGIONAL GRID
▀ Comprises four States and Union Territory of Pondicherry ANDHRA PRADESH KARNATAKA KERALA TAMIL NADU Union Territory of Pondicherry ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,100 MW (200x x3) Neyveli Lignite Corporation Ltd. - II : 1,470 MW (210 x 7) Neyveli TPS I (Expansion) : MW (210 X 1) Madras Atomic Power Station : MW (170 x 2) Kaiga Generating Station : MW (220 x 2)
8
400 KV LINE PRESENTLY OPERATED AT 220 KV
SR GRID MAP TALCHER BHADRAVATI JEYPORE 178x2 2x221 SIMHADRI NTPC 8x4 RSTPP 1 GAZUWAKA(AP) 187 189 301x2 P 15x2 195 267x2 VISAKHAPATNAM (POWERGRID) HYDERABAD KHAMMAM P P 317 115 P 197x2 MMDP 155 P 146x2 VIJAYAWADA RAICHUR 258 221x2 P NAGARJUNASAGAR Nagjhari 172 279 308 MUNIRABAD SSLMM KODASAALY P 277 KURNOOL KAIGA N SIRSI 52x2 120 P GOOTY 60 CUDDAPAH DAVANAGERE P 300 NELLORE 400 KV LINE PRESENTLY OPERATED AT 220 KV 173 KADRA 302 HIRIYUR 330 242 NELAMANGALA 28 BANGALORE 98 ALMATHI HOODY P KOLAR MADRAS P HOSUR MAPS 182 181 63 175 SALEM PONDICHERY P 179 NEYVELI 54 151 164x2 UDUMALPET 130x2 P TRICHY TRICHUR P P 127 130x2 P MADURAI PALLOM KAYANKULAM 2x78 EDAMON THIRUVANATHAPURAM
9
INTER REGIONAL LINKS A.P KAR T.N MAH KER ORISSA M.P GOA PONDICHERRY
CHANDRAPUR TALCHAR ORISSA JEYPORE MAH M.P BALIMELA RAMAGUNDAM BARSUR GAZUWAKA U.SILERU KOLHAPUR A.P L.SILERU BELGAUM AMBEWADI T GOA KAIGA KAR HVDC BI POLE HVDC B2B STATION KOLAR MAPS NEYVELI CENTRAL GEN.STATION PONDICHERRY 220 kV LINE T.N 400 kV LINE KER 110 kV HVDC LINE POWERGRID SRLDC
10
INTER REGIONAL IMPORTS (MU)
11
MILE STONES NTPC U # 1 200MW 27-10-1983 NLC II U # 3 210MW 29-03-1986
MAPS U # MW KGS U # MW
12
INSTALLED CAPACITY OF SOUTHERN REGION AS ON 01-01-2003
IN MW 27848MW
13
INSTALLED CAPACITY OF SR IN MW
AS ON 1ST JAN 03 STATE/CGS HYDRO THERMAL GAS WIND IPP NUCLEAR TOTAL ANDHRA PRADESH 3345 3943 273 2 1199 8762 KARNATAKA 3097 1598 5 341 5041 KERALA 1795 235 350 171 2553 TAMIL NADU 1993 3570 225 19 1125 6932 NTPC 2100 NLC TS II 1470 NLC TPS I (Exp) 210 MAPS 340 KAIGA 440 10230 13126 848 28 2836 780 27848 IN % 37% 47% 3% 0.1% 10%
14
STATEWISE BRAKUP OF INSTALLED CAPACITY IN SR AS ON 01.01.2003
IN MW 27848MW
15
SOUTHERN REGIONAL GRID HIGHLIGHTS
Installed Capacity - 27,540MW Average Daily Consumption MU Average Grid Frequency HZ Peak Demand Met - 20,063 MW Demand Deficit % Energy Deficit %
16
HYDERABAD-SECUNDERABAD
TYPICAL LOADS OF MAJOR CITIES (MW) CITY LOAD BANGALORE MW HYDERABAD-SECUNDERABAD CHENNAI MW THIRUVANANTHAPURAM 225 MW
17
Growth of Installed Capacity & Peak Demand Met
Average Rate of Growth of Installed Capacity (MW): % Average Rate of Growth of Peak Demand met (MW): %
18
IMPORT THROUGH HVDC 846 Crores 578 Crores 564 Crores 430 Crores
19
INTER-REGIONAL EXCHANGES:
FROM ER 2513 3666 FROM WR 527 788 FROM MSEB 108 FROM GRIDCO (Orissa) 750 634 FROM CSEB 16 TOTAL 3898 5104 IN MUs
20
FREQUENCY SPECTRUM FOR 2001- 02
LAST FOUR YEARS
21
Frequency Profile: Last 4 years
22
AUTOMATIC UNDER FREQUENCY LOAD SHEDDING SCHEME
As per 129th SRE Board meeting, under frequency relays are to be set to operate in 3 stages at 48.0Hz, 47.8Hz & 47.7Hz instantaneous. Present Status of relief through U/F relays: S. No State 47.8Hz Inst. 47.7Hz Inst. 47.6Hz Inst. 47.5Hz Inst. 1 AP 305 375 830 - 2 KAR 697 930 3 KER 112 Offpeak-peak 39-63 4 TN 1272 TOTAL 2386
23
VOLTAGE SPECTRUM FOR
24
PROBLEMS LOW GRID FREQUENCY LOW VOLTAGES HEAVY MVAR DRAWALS
CAPACITOR INSTALLATION-BACKLOG MEAGRE RELIEF FROM AUFR’S RELUCTANCE - MANUAL LOAD SHEDDING TRANSMISSION CONSTRAINTS EVACUATION PROBLEMS TRUNK LINES LOADING LITTLE OR NO REDUNDANCY PROTECTION CO-ORDINATION GRID DEFENCELESS VULNERABLE
25
SOLUTION CONJUNCTION MAINTAIN FREQ BETWEEN 49-50.5 HZ
ACCELERATE SHUNT CAPACITOR INSTALLATION REINSTATE 2 STAGE UFR’S PROTECTION CO-ORDINATION AUGMENTATION OF TRANSMISSION SCIENTIFIC SETTLEMENT SYSTEM-ABT FREE GOVERNOR MODE SELF HEALING MECHANISM CONJUNCTION
26
Hierarchy of The ULDC Scheme in Southern Region
RLDC,Bangalore SCC, Pondy CPCC Hyderabad Kalamassery Chennai Bangalore Andhra Kerala Tamilnadu Karnataka Hyderabad Kalam’erry Chennai Bangalore Cuddapah Kannur Erode Davangere Warangal Trivandrum Madurai Hubli Vijayawada
27
Communication Channel for Information flow
RLDC Wide Band Commn (MW / FO) SLDC SLDC Wide Band Commn Sub-LDC Sub-LDC Wide Band / PLCC Commn RTU RTU RTU
28
Karnataka Andhra Pradesh UT of Pondy Kerala Tamilnadu
Information Flow to Control Centres Ramagundam Karnataka Warangal Satellite Ghanapur HYDERABAD Vijayawada Andhra Pradesh Hubli Davangeree MW Link Chinkampalli Bangalore FO Link State owned Link CHENNAI Sub-LDC SLDC Pondy Kannur-B Erode RLDC UT of Pondy Kerala KALAMASSERY Tamilnadu Madurai Vydyuthi Bhavanam
29
POWERGRID-ULDC PROJECT
SOUTHERN REGION OVERALL TELECOM BACKBONE NETWORK RAMAGUNDAM PEDAPALLI DURSHED JAMMIKUNTA GAJUWAKA WARANGAL VIZAG SWS SHAPURNAGAR BOMMUR GHANAPUR HYDERABAD VTPS KAKINADA CH.GUTTA BHIMADOLE HYDERABAD 400 N’SAGAR PH VIJAYAWADA TALLAPALLI SRISAILAM PH KURNOOL SRISAILAM LBPH APTRANSCO RTUs 82(NEW) SOMAYAJULAPALLI HUBLI GOOTY N MUDDANOOR RTPP DAVANAGERE CHINAKAMPALLY ANANTHAPUR BANGALORE CHENNAI PONDY RTUs 5 (NEW) 10 (EXST) KPTCL RTUs 22 (NEW) 21 (EXST) SOMANAHALLI KUMBALGODI SRIPERUMBUDUR SP.KOVIL P VILLIANUR KANNUR-B PONDY CENTRAL SECTOR RTUs 27(NEW) SALEM400 SALEM230 NEYVELI PANRUTI RSCC (1) CPCC (1) SLDC (4) SUB-LDC / SCC (14) FIBRE OPTIC LINK 110/132kv FIBRE OPTIC LINK (220kv) FIBRE OPTIC LINK (400kv) FIBRE OPTIC LINK (SEB) MICROWAVE LINK (39 links) SATELLITE LINK (KEB) RTU LOCATIONS (201) ERODE CHIDAMBARAM KOZHIKODE INGUR PONGALORE MYLADUTURAI UDUMALPET TRICHY TRICHUR NORTH KOVILVENNI THIRUVARUR ADANIKOTTAI TANJORE KALAMASSERY THIRUMAYAM PUDUKOTTAI CHALAKUDI MADURAI400 KARAIKUDI KSEB RTU’S 30(NEW) PALLOM MADURAI SIVAGANGA TNEB RTUs 40 (NEW) 35 (EXST) KAYANKULAM VIAKKAM KUNDARA PARIPALLI TRIVANDRUM NORTH VYDYUTHI BHAVANAM
30
REACTIVE POWER MANAGEMENT
TAP POSITION OF 400KV ICTs AT GAZUWAKA, VIJAYAWADA, KHAMMAM & HYDERABAD CHANGED. MVAR INJECTION(220KV TO 400KV) THROUGH ICT AT GAZUWAKA BUS REVERSED. MVAR EXPORT(400KV TO 220KV) THROUGH ICT AT VIJAYAWADA, KHAMMAM & HYDERABAD INCREASED. APTRANSCO REPORTED IMPROVEMENT IN 220KV VOLTAGE PROFILE & REDUCTION IN LOSS BY 1%(APPROX.)
31
REACTIVE POWER MANAGEMENT
Date TAP POSITION CHANGED Stations 11-July 12-July 26-July 29-July Gazuwaka 9 to 12 12 to 14 Vijayawada 11 to 14 14 to 16 Khammam 8 to 11 Ghanapur 5,4,3 to 7,6,5 7,6,5 to 9,8,7 DATE Gazuwaka Vijayawada Khammam Ghanapur Mvarh Mvar 08-Jul-02 -87.60 -3.65 520.70 21.70 24.40 1.02 20.60 0.86 09-Jul-02 -43.57 98.25 295.40 12.31 -49.60 -2.07 10-Jul-02 -37.09 67.39 18.70 0.78 7.30 0.30 11-Jul-02 150.50 6.27 69.95 20.50 0.85 8.00 0.33 12-Jul-02 693.00 28.88 42.00 0.00 71.80 2.99 13-Jul-02 544.30 22.68 112.49 11.10 0.46 310.00 12.92 14-Jul-02 22.90 0.95 76.75 23.30 0.97 427.80 17.83 TOTAL -25.53 488.51 393.40 16.39 795.90 33.16
32
VARIABLE COST OF SOME POWER STATION OF CENTRAL SECTOR
POWER STATION/UNIT VARIABLE COST (Ps) KAIGA GEN. STATION 310 (Total Cost) NEYVELI-II STG-II 176 NEYVELI-II STG 1 122 RAMAGUNDAM T.P.S 91 M.A.P.S KALPAKAM 57
33
CENTRAL SECTOR GENERATION EXPECTED
IN MW 02-03 03-04 04-05 05-06 RAMAGUNDAM STAGE III 500 NEYVELI TS-I EXT. 210 TOTAL THERMAL 420
34
POWERGRID TRANSMISSION LINES EXPECTED
IN CKM 400KV KOLAR-HOSUR D/C 273 400KV SALEM-UDUMALPET 136 400KV VIJAYWADA-NELLORE-SP'BUDUR D/C 1068 400KV MADURAI TRIVANDRUM 346
35
RESERVOIR POSITION LEVEL IN MTS LEVEL 31 DEC 01 31 DEC 02 DIFF IN MTS % DIFF JALAPUT 836.84 819.91 -17 -2 LINGANMAKKI 543.26 543.93 1 SUPA 534.52 530.24 -4 -1 IDUKKI 724.7 709.79 -15 KAKKI 972.38 957.16 -25 -3 NILGIRIS TOTAL ENERGY 31 DEC 01 31 DEC 02 DIFF IN MU % DIFF 467 53 -414 -89 1761 1877 116 6 1051 844 -207 -20 1532 626 -906 -59 619 306 -313 -50 595 600 5 1 6025 4306 -1719 -29
36
SHARE ALLOCATION BEFORE TALCHER(2000MW)
IN MW STATE NTPC PEAK NTPC OFFPEAK NLY-II/I NLY-II/II MAPS KAPS ER TOTAL PEAK TOTAL OFFPEAK AP 668 683 105 191 31 160 1155 1170 KAR 420 412 145 195 25 131 156 1071 1063 KER 307 72 102 21 57 74 634 TN 532 526 185 277 258 239 100 1592 1586 PONDY 73 24 5 13 10 197 GOA SHARE ALLOCATION AFTER TALCHER(2000MW) IN MW STATE NTPC PEAK NTPC OFFPEAK NLY-II/I NLY-II/II MAPS KAPS ER Talcher-Kolar TOTAL PEAK TOTAL OFFPEAK AP 668 683 105 191 31 160 499 1654 1669 KAR 420 412 145 195 25 131 156 466 1537 1529 KER 307 72 102 21 57 74 330 964 TN 532 526 185 277 258 239 100 636 2228 2222 PONDY 73 24 5 13 10 69 266 GOA
37
220KV INTER STATE TIE-LINES IN SERVICE
Tandur (AP) – Sadem (Kar) - Radial load on AP. Gooty (AP) – Alipur (Kar) - Radial load on AP. Chittoor (AP) – Tiruvalam (TN) - Radial load on AP. Sulurpet (AP) – Gummidipundi (TN)- Radial load on AP. Theni (TN) – Muzhiyar (Ker) - Radial load on Ker. ADVANTAGES: REDUCTION IN CONGESTION IN 400KV LINES IMPROVEMENT IN VOLTAGE PROFILE REDUCTION IN LOSSES REDUCTION IN ANGULAR DIFFERENCE BETTER STABILITY
38
KARNATAKA
39
South India Sharavathi Kuttiadi
40
THE FIRST POWER STATION IN SOUTH ASIA- SIVANSAMUDRA 1902
41
EVOLUTION: DID YOU KNOW?
172 1 1902: ASIA’S FIRST HYDRO GENERATING STATION AT SHIVANSAMUDRA-42 MW A 78.5 KV D/C LINE WAS ALSO LAID BETWEEN SIVANSAMUDRA AND MYSORE. A FREQUENCY CONVERTER AT MYSORE DELIVERED 50 HZ! SIVANSAMUDRA WAS CONNECTED TO KGF BY A 78.5 KV D/C LINE. POWER WAS DELIVERED AT 25 HZ!!! MYSORE KGF SIVA
42
EVOLUTION: YEAR-1975 KOLHAPUR SHARAVATHY-1964-1035 MW
MUNIRABAD MW TB DAM MW BHADRA MW SIVA MW SHIMSHA MW MGHE MW BELGAUM HUBLI SHARAVATHY SHIMOGA BANGALORE MANGALORE MYSORE
43
EVOLUTION -YEAR:1985 PEAK DEMAND MET: 1769 MW CONSUMPTION : 9546 MU
ABOUT 26 MU/DAY HYDRO GENERATION: 8415 MU RTPS UNIT 1 SYNCH’D ON 29/3/1985 INSTALLED CAPACITY: HYDRO: MW THERMAL MW TOTAL MW GRIDMAP 1985
44
NTPC SHARE WAS TAKEN RADIALLY FROM SEP 1984 ONWARDS
EVOLUTION -YEAR:1985 KARNATAKA IN PARALLEL WITH MAHARASHTRA- BLGM-KOLHAPUR D/C LINE- SINCE AUG 1984 KARNATAKA IMPORTED 723 MU FROM MSEB PEAK FLOW ON THIS LINE 360 MW NTPC SHARE WAS TAKEN RADIALLY FROM SEP 1984 ONWARDS GOOTY-MUNIRABAD:120 MW-271 MU HYDERABAD-SHAHBAD:120 MW-236 MU GRIDMAP 1985
45
INTEGRATED OPERATION IN SOUTHERN REGION INSTALLED CAPACITY KARNATAKA:
EVOLUTION -YEAR:1995 INTEGRATED OPERATION IN SOUTHERN REGION INSTALLED CAPACITY KARNATAKA: HYDRO MW THERMAL MW DIESEL MW TOTAL MW PEAK DEMAND MET 3224 MW CONSUMPTION MU ABOUT 54 MU EVERY DAY GRIDMAP 1995
46
KARNATAKA: QUICK FACTS
TOTAL AREA SQ KMS NUMBER OF CONSUMERS 105 LAKHS CONNECTED LOAD MW 400 KV TL CKM 220 KV TL CKM 110 KV TL CKM 66 KV TL CKM 33 KV TL CKM TOTAL LENGTH OF HT LINES KMS
47
KARNATAKA GRID HIGHLIGHTS
Installed Capacity(MW) 4302 4813 Peak Demand Met(MW) 4510 4656 Peak Demand Requirement(MW) 5027 5814 % Demand Deficit 10% 20% Total Energy Consumed(MU) 27447 28596 Energy Requirement(MU) 30950 32254 % Energy Deficit 11% Average Daily Consumption 75 78
48
INSTALLED CAPACITY OF KARNATAKA AS ON 01-01-2003
IN MW 5041MW
49
IN MW IN PERCENTAGE HYDRO 3097 61% THERMAL 1598 32% WIND 5 0.1% IPP
INSTALLED CAPACITY OF KARNATAKA: IN MW IN PERCENTAGE HYDRO 3097 61% THERMAL 1598 32% WIND 5 0.1% IPP 341 7% TOTAL 5041 AS ON 1st JAN 03
50
CONSUMER PROFILE IN KARNATAKA
51
PROBLEMS FACED IN OPERATION
GENERATION DEPENDENT ON MONSOON LOAD CENTRE IN SOUTH-GENERATION IN NORTH AND NORTH WEST KMS AWAY RTPS EVACUATION- O/L OF RTPS-LINGASUGUR LINES KAPS EVACUATION –O/L OF KODASALLI-NJPH LINES– SLOW SWING NJPH EVACUATION- O/L OF NJPH-HUBLI LOADING OF GUTTUR-HIRIYUR-GB’NUR-DBPURA-HOODY SHOW ME SHOW ME SHOW ME GRIDMAP 220
52
PROBLEMS FACED IN OPERATION
LOW VOLTAGES IN SOUTHERN PART OF THE STATE – INSUFFICIENT SHUNT COMPENSATION – OVERLOADED LINES OVERLOADING OF SOMANAHALLI ICT’S: MAX MW POSSIBLE AT 330KV = 770MW ENHANCING TRANSFER CAPABILITY OF SIRSI-GUTTUR- FEW SPANS - TO BE CONVERTED TO TWIN MOOSE. IMPORT FROM KOLHAPUR - DIFFICULTY GRIDMAP 220
53
Nagjhari, Kodasalli, Kaiga & Kadra
96 % OF I/C IS IN THE CIRCLES SHOWN 1260MW Raichur ~ ~ Nagjhari, Kodasalli, Kaiga & Kadra LOAD 1250MW ~ ~ ~ 1,565MW 1,330MW ~ Sharavathy, LDPH & MGHE ~ ~ 230MW Varahi ~ LOAD 500 MW LOW VOLTAGE ZONE 235MW Tanirbavi ~ LOAD 2250 MW
54
SHORT CKT LEVELS PEAK(MVA) OFFPEAK (MVA) 6376 5562 6418 5542 5537 4822
STATION PEAK(MVA) OFFPEAK (MVA) SOMANAHALLI400 6376 5562 HOODY 400 6418 5542 NLMNGLA 400 5537 4822 GUTTUR 400 4955 4403 MUNIRABAD 400 4262 3882 RTPS 400 6435 5911 HUBLI 220 3090 MANGALORE 220 631 MYSORE 220 1268
55
EVACUATION OF RTPS HUMNABAD BB WADI SHAHBAD TANDUR(AP) SEDAM ML PURA
RTPS 630 MW RTPS 630 MW HUBLI LINGASUGUR GADAG RAICHUR KUSHTAGI MUNIRABAD LINGAPUR JINDAL 120 MW ITTAGI GUTTUR
56
KAPS AND NJPH EVACUATION
TATA 81 MW CHIKKODI GOA BELGAUM XELDAM A-WADI M.L.PURA NARENDRA PONDA KODASALLI 120 MW NJPH 855 MW GADAG HUBLI TO LINGAPUR KADRA-150MW TO SHARAVATHY DAVANGERE HAVERI SIRSI: BUS1 KAIGA 440 MW SIRSI: BUS2
57
EARLIER CONFIGURATION
GUTTUR SHIMOGA B2 B1 B4 A’HALLI KB CROSS HOODY A’PALYA HOODY 220 KV HEBBAL PEENYA
58
PRESENT CONFIGURATION AT NELAMANGALA
GUTTUR SHIMOGA B4 B1 B2 B3 NELAMANGALA HOODY ANCHEPALYA HOODY 220 KV HEBBAL PEENYA
59
PRESENT CONFIGURATION AT NELAMANGALA
RELIEF OF MW ON HOODY ICT VOLTAGE AT HOODY IMPROVED: 7-9 KV VOLTAGE AT S’HALLI IMPROVED: 5-7 KV LOADING OF S’HALLI-SB’PURA AND S’HALLI-ITPL 220KV LINES RELIEVED. ONE MORE STEP TOWARDS ACHIEVING A 400 KV RING MAIN AROUND BANGALORE
60
FINAL CONFIGURATION AT NELAMANGALA
GUTTUR SHIMOGA NELAMANGALA HOODY ANCHEPALYA HOODY 220 KV TO HOODY HEBBAL PEENYA
61
PRESENT CONFIGURATION AT SHARAVATHY
SHARAVATHY:1035 MW HUBLI S5 S1 JUMPER REMOVED TALAGUPPA STRP:240 ,MW S2 S3 S4 400 KV LINES OPERATED PRESENTLY AT 220 KV JUMPER REMOVED SHIMOGA TO DAVANAGERE TO NELAMANGALA- OPEN AT NELAMANGALA.TERMINATION WORKS PENDING
62
FINAL CONFIGURATION AT SHARAVATHY
SHARAVATHY:1035 MW HUBLI S5 TALAGUPPA:2*315 MVA STRP:240 ,MW S1 S2 S3 S4 SHIMOGA TO DAVANAGERE TO NELAMANGALA
63
SUPA,NJPH , KODASALLI,KADRA,
RIVERS AND RESERVOIRS GEN STN RESERVOIR FRL IN MU RIVER SHARAVATHY AND LDPH LINGANAMAKKI 4660 SHARAVATHY SUPA,NJPH , KODASALLI,KADRA, SUPA 2990 KALINADI BHADRA T.B.DAM, MUNIRABAD T.B DAM THUNGABHADRA VARAHI, MANI DAM PH MANI DAM 881 VARAHI
64
VARIABLE COST OF SOME POWER STATION OF KARNATAKA
POWER STATION/UNIT VARIABLE COST (Ps) TANIR BHAVI 293 RAICHUR.T.PS.-IV 270 RAICHUR.T.PS.-V 260 RAICHUR.T.PS.-VI JINDAL(IPP) * YELEHANKA DEISEL 205 RAICHUR.T.PS.-III 165 TATA DIESEL 160 RAICHUR.T.PS.-I 144 RAICHUR.T.PS.-II
65
EXPECTED GENERATION ADDITIONS
KARNATAKA (IN MW) 03-04 04-05 ALMATTI-HYDRO 290 VIJAYANAGAR - THERMAL 500 TOTAL
66
220 KV TRANSMISSION LINES EXPECTED
SHIMOGA – VARAHI DC - DEC 2002. AMBEWADI – NARENDRA DC – DEC 2002 S’HALLI-MALUR-KOLAR-CHINTAMANI DC – DEC 2002 NARENDRA - HAVERI DC – DEC 2003 NELAMANGALA – DB PURA – DEC 2003 KOLAR – GOWRIBIDANUR DC – OCT 2004 400 KV TALAGUPPA – NELAMANGALA DC
67
400KV TRANSMISSION LINES PLANNED
400 KV NELAMANGALA-MYSORE 400 KV MYSORE-KOZHIKODE 400 KV KAIGA-NARENDRA 400 KV NARENDRA-GUTTUR 400 KV GUTTUR-HASSAN-MYSORE 400 KV MANGALORE-HASSAN-NELAMANGALA
68
TRANSMISSION LINES WISH LIST
400 KV HYD-RTPS-KURNOOL-GTY-BLR 400 KV NELAMANGALA-MYSORE 400 KV MYSORE-KOZHIKODE 400 KV KAIGA-NARENDRA-GUTTUR 400 KV GUTTUR-HASSAN-MYSORE 400 KV MANGALORE-HASSAN-NELAMANGALA ADDL 220KV TO TK HALLI
69
ANDHRA PRADESH: QUICK FACTS
TOTAL AREA SQ KMS PER CAPITA CONSUMPTION 510 KWH 400 KV TL CKM 220 KV TL CKM 110 KV TL CKM 33 KV TL CKM 11 KV TL CKM LT LINES CKM 400/220 KV TR MVA 220/132KV TR MVA
70
ANDHRA PRADESH GRID HIGHLIGHTS
Installed Capacity (MW) 6846 7860 Peak Demand Met(MW) 7143 7029 Peak Demand Requirement(MW) 8108 8391 % Demand Deficit 12% 16% Total Energy Consumed(MU) 46533 46410 Energy Requirement(MU) 51865 52009 % Energy Deficit 10% 11% Average Daily Consumption 127
71
INSTALLED CAPACITY OF ANDHRA PRADESH AS ON 01-01-2003
IN MW 8762MW
72
IN MW IN PERCENTAGE HYDRO 3345 38% THERMAL 3943 45% GAS 273 3% WIND 2
INSTALLED CAPACITY OF ANDHRA PRADESH: IN MW IN PERCENTAGE HYDRO 3345 38% THERMAL 3943 45% GAS 273 3% WIND 2 0.02% IPP 1199 14% TOTAL 8762 AS ON 1st JAN 03
73
CONSUMER PROFILE IN ANDHRA PRADESH
74
PROBLEMS FACED IN OPERATION
EVACUATION PROBLEM FOR NORTH EASTERN COASTAL PARTS EVACUATION PROBLEMS AT VTS HIGH AGRICULTURAL LOADS CAUSE SEASONAL VOLTAGE PROBLEM CUDAPPAH AREA FACES LOW VOLTAGE IF RYTPS UNITS NOT AVAILABLE HUGE LOAD RELIEF DURING CHANGE OVER- TRUNK LINE LOADINGS RESERVOIRS WITH INSUFFICIENT STORAGE CAPACITY SCHEDULING IPP’S DURING LEAN DEMAND GENERATORS NOT ON FREE GOVERNER SHOW ME SHOW ME GRIDMAP
75
EVACUATION AT GZK TO JEYPORE GAZUWAKA 400 KV GAZUWAKA 220 KV VSP 70MW
JEGURUPADU 216MW TO .L.SILERU GAZUWAKA 220 KV SPECTRUM 208MW BOMMUR VGTS-II 172MW NIDADAVOLU BHIMADOLU VGTS-I 100MW VTS TO JEYPORE NUNNA VSP 70MW GAZUWAKA 400 KV KAKINADA VTS 1260MW BSES 140MW LANCO 350 MW PEDAPURAM GUDIVADA BHIMAVARAM VEMAGIRI
76
VTS AND LANCO EVACUATION
NUNNA 400KV TALAPALLI 400 KV NUNNA VTSG TALAPALLI GUNADALA FROM BHIMADOLU 80 180 x 2 60 160 x 2 80 x 2 130 x 2 TADIKONDA 150 FROM VGTS-II CHILLAKALLU TO MALKARAM VIA NKTPALLI 90 TO MALKARAM 140 x 2 PODILI ONGOLE 10 x 2 VTS=1260 MW STATION DIAGRAM KONDAPALLI LANCO=350MW
77
EVACUATION OF KTS NUNNA NUNNA 400 KV KTS 1170MW SH’ NAGAR
STATION DIAGRAM MIRYALGUDA N’SAGAR S.R.PATNAM TO L.SILERU KHAMMAM 400 KV KHAMMAM TO HARD WATER PLANT VIA MANUGURU
78
‘TWIN CITY’ RING MAIN SHAPOORNAGAR TANDUR NKT PALLI GACHIBOWLI
MALKARAM SHAPOORNAGAR MOULALI TANDUR NKT PALLI GACHIBOWLI CHILLAKALLU YEDDUMAILARAM GHANAPUR TO MMDPALLI CHANDRAYANGUTTA TO SRISAILAM MAMMIDAPALLI MAMMIDAPALLI- 400KV
80
SIMHADRI(1000 MW)
81
SHOW ME THE MAP N’SAGAR TURBINR TYPE:FRANCIS HEAD : 93 MTS
STORAGE FRL 180MTS STORAGE MDDL 149 MTS SHOW ME THE MAP SRISAILAM TURBINE TYPE: FRANCIS HEAD : MTS STORAGE FRL 271MTS STORAGE MDDL 243 MTS
85
JALAPUT TYPE: STORAGE FRL 838MTS- 534 MU STORAGE MDDL 809 MTS
86
NATURAL ADVANTAGES GATE WAY OF SOUTH MOST CONNECTED STATE
HIGHLY NETWORKED BETTER SHORT CIRCUIT LEVEL AND STABILITY ALLOWED TO DRAW MVAR AT RAMAGUNDAM BEING AT THE MOUTH HAS ADVANTAGE AVAILING MORE ASSISTANCE FROM NEIGHBOURING REGION
87
BACK
88
<2MU 2-4MU 4-6MU >6MU
89
VARIABLE COST OF SOME POWER STATION IN ANDHRA PRADESH
POWER STATION/UNIT VARIABLE COST (Ps) NELLORE 234 RAYALASEEMA 125 KOTHAGUDEM-A 123 KOTHAGUDEM-B KOTHAGUDEM-C KOTHAGUDEM-D VIJAYAWADA 103 RAMAGUNDAM-B 102 SIMHADRI 100 KONDAPALLI 92 VIJJESWARAM 87 86 JEGURUPADU 83 SPECTRUM
90
EXPECTED TRANSMISSION ADDITIONS
IN CKM 220KV JEGRUPADU-VEMAGIRI 20 220KV VEMAGIRI-BHIMAVARAM D/C 134 220KV BHIMAVARAM-GUDIWADA D/C 144 220KV GUDIWADW-NUNNA D/C 92 400KV RAMAGUNDAM (BPL)-DITCHIPALLY(SC) 150 400KV RAMAGUNDAM(BPL)-GAJWEL(SC) 170 400KV KRISHNAPATNAMTPS-KRISHNAPATNAM S/S(2XSC) LILO FROM 400KV GOOTY- TALAPALLY SC LINE TO KURNOOL S/S 40 400KV GAJWEL-HYDERBAD (SC) 60 400 KV KALPAKA-VEMAGIRI-NUNNA DC
91
TAMIL NADU: QUICK FACTS
TOTAL AREA SQ KMS NUMBER OF CONSUMERS 152 LAKHS CONNECTED LOAD MW 230 KV TL CKT KMS 110 KV TL CKT KMS 66 KV TL CKT KMS
92
TAMIL NADU GRID HIGHLIGHTS
Installed Capacity(MW) 6151 6587 Peak Demand Met(MW) 6290 6686 Peak Demand Requirement(MW) 6839 7758 % Demand Deficit 8% 14% Total Energy Consumed(MU) 41044 43180 Energy Requirement(MU) 45430 48044 % Energy Deficit 10% Average Daily Consumption 112 118
93
INSTALLED CAPACITY OF TAMIL NADU AS ON
IN MW 6932MW
94
IN MW IN PERCENTAGE HYDRO 1993 29% THERMAL 3570 52% GAS 225 3% WIND 19
INSTALLED CAPACITY OF TAMIL NADU: IN MW IN PERCENTAGE HYDRO 1993 29% THERMAL 3570 52% GAS 225 3% WIND 19 0.3% IPP 1125 16% TOTAL 6932 AS ON 1st JAN 03
95
CONSUMER PROFILE IN TAMIL NADU
96
PROBLEMS HYDRO GENERATION MONSOON DEPENDENT
HYDRO M/C s OF SMALL CAPACITY . ITS CONTRIBUTION IS LESS FOR ANY MAJOR LOAD VARIATIONS. PEAKING SHORTAGE CONSTRAINTS FOR AVAILING IMPORTS ANY MAJOR THERMAL UNIT TRIPPING, AGGRAVATES THE SITUATION FOLLOWED BY VOLTAGE PROBLEMS.
97
PROXIMICITY OF GENERATING STATIONS
NORTH MADRAS TCPL ENNORE GMR VASAVI BASIN BRIDGE KALPAKKAM SAMALPATTY METTUR DAM MOYAR PYKARA METTUR TUNNEL NEYVELI-TS II NEYVELI-TS I KUNDAH COMPLEX KOVI KALLAPAL P P NALLUR SARKARPATHI ALIYAR KADAMPARAI SHOLAYAR PERIYAR SURULIYAR Thermal Hydro Nuclear IPP/GAS BALAJI SERVALAR TUTICORIN PAPANASAM KODAYAR
98
LOAD CENTRES IN TN MAIN AGRI AREA CITY LOADS
99
TYPICAL LOADS IN MAIN CITIES
CITY LOADS IN MW CHENNAI 1500 COIMBATORE 400 TRICHY 300 MADURAI SALEM 250
100
LIST OF HYDROSTATIONS STATION (NI) UNITS CAP (MW) YEAR OF COMMI
SIONING STATION (IRR) PYKARA 3X7+2X11+2X14 70 1932 METTUR DAM 4X10 40 1937 MOYAR 3X12 36 1952 METTUR TUNNEL 4X50 200 1966 KUNDAH I 3X20 60 1960 LOWER METTUR 8X15 120 1988 KUNDAH II 5X35 175 1961 PERIYAR 4X35 140 1958 KUNDAH III 3X60 180 1965 PAPANASAM 4X7 28 1944 KUNDAH IV 2X50 100 SERVALAR 1X20 20 1986 KUNDAH V 2X20 1964 SARKAR.PATHI 1X30 30 KUNDAH VI 1996 SHOLAYAR I 2X35 1971 SURULIYAR 1X35 35 1978 SHOLAYAR II 1X25 25 KADAMPARAI 4X100 400 1987 ALIYAR 1X60 1970 KODAYAR 1X60+1X40
101
KADAMPARAI PUMPED STORAGE HEP
NO OF UNITS : 2 (INITIALLY) TYPE OF PUMP-TURBINE REVERSIBLE FRANCIS(VETICAL SHAFT) OUTPUT OF GENERATOR MW AT 0.9 pf lag INPUT DURING PUMPING MW AT pf lead RATED SPEED – 500 rpm Contd
102
KADAMPARAI PUMPED STORAGE HEP
UPPER RESERVOIR (KADAMPARAI) FRL m MDDL m STORAGE –29.4 mcm (live) GEN – 3.7mcft/hr/m/c LOWER RESERVOIR (UPPER ALIYAR) FRL – m MDDL – m STORAGE –21.6 mcm (live) PUMPING mcft/hr/m/c
103
WIND ENERGY TOTAL INSTALLED CAPACITY IN THE COUNTRY- 1200 MW
IN TAMIL NADU-800MW REQUIREMENT – MINIMUM WIND VELOCITY-24 kms/hr DESIRABLE WIND VELOCITY-48 kms/hr LIMITATIONS - SEASONAL, DEPEND ON WIND VELOCITY - COSTLY - MVAR DEPENDENCY ON GRID
104
CHENNAI SUPPLY POWER AVAILABLE IN AND AROUND CHENNAI AT PEAK
ETPS – MW NMTPS – MW B.B MW GMR VASAVI MW TCPL MW TOTAL MW AVAILABLE GENERATION (APPROXI) MW TOTAL LOADS IN CHENNAI (APPROXI) – 1500 MW BALANCE MET THROUGH IMPORTS
105
TOTAL INFLOWS IN MU FOR TN
106
VARIABLE COST OF SOME POWER STATION IN TAMIL NADU
POWER STATION/UNIT VARIABLE COST (Ps) BASIN BRIDGE 489 P P NALLUR 282 SAMALPATTY 225 BALAJI POWER 214 VASAVI GAS (IPP) 212 ENNORE.T.P.S 203 KOVIL KALAPPAL 200 NEYVELI-I 169 TUTUCORIN.T.P.S 144 METTUR.T.P.S 142 NORTH MADRAS.T.P.S
107
EXPECTED GENERATION ADDITIONS
STATION CAPACITY (MW) EXPECTED YEAR HYDRO PYKAKARA ULTIMATE 3X50 SEP-03 GAS PEUUMKULAM 1X100 2003 NCTPS 2X525 10th PLAN TTPS 4th STAGE 1X525 11th PLAN SRIMUSHANAM 350
108
TRANSMISSION LINES EXPECTED
400 KV NCTPS TS II-SPDR LILO OF NELLUR-SPDR AT ALMATHY 230 KV LILO OF METTUR-HOSUR AT KARIMANGALAM LILO OF ETS-KORATTUR AT MANALI THENI-SEMPATTY THIRUVANAMALAI-VILLUPURAM
109
KERALA: QUICK FACTS TOTAL AREA 38,863 SQ KMS
NUMBER OF CONSUMERS 61 LAKHS CONNECTED LOAD 8150 MW 230 KV TL CKT KMS 110 KV TL CKT KMS 66 KV TL CKT KMS
110
KERALA GRID HIGHLIGHTS
Installed Capacity(MW) 2525 2553 Peak Demand Met(MW) 2340 2348 Peak Demand Requirement(MW) 2539 2571 % Demand Deficit 8% 9% Total Energy Consumed(MU) 12500 12640 Energy Requirement(MU) 14094 14165 % Energy Deficit 11% Average Daily Consumption 34 35
111
INSTALLED CAPACITY OF KERALA AS ON
IN MW 2553MW
112
IN MW IN PERCENTAGE HYDRO 1795 70% THERMAL 235 9% GAS 350 14% WIND 2
INSTALLED CAPACITY OF KERALA: IN MW IN PERCENTAGE HYDRO 1795 70% THERMAL 235 9% GAS 350 14% WIND 2 0.08% IPP 171 7% TOTAL 2553 AS ON 1st JAN 03
113
CONSUMER PROFILE IN KERALA
114
PROBLEMS HYDRO GENERATION MONSOON DEPENDENT PEAKING SHORTAGE
CONSTRAINTS FOR AVAILING IMPORTS LOW VOLTAGE PROBLEM IN NORTHERN KERALA
115
GENERATING SCHEME
121
VARIABLE COST OF SOME POWER STATION OF KERALA
POWER STATION/UNIT VARIABLE COST (Ps) KAYAMKULAM 220 BRAHMAPURAM DIESEL 225
122
Kuttiyadi Additional Ext.
GENERATING SCHEMES UNDER CONSTRUCTION Sl No Name of stations Capacity in MW Targetted Year 1 Kuttiyadi Additional Ext. 100 Aug-05 2 Athirappally 163 2007 3 Malankara 10.5 Jul-02 4 Meen Vallom 2.4 Apr-03 5 Kuttiadi Tail Race 3.75 6 Chembukadavu Stage1 2.7 Jun-02 7 Chembukadavu Stage2 Dec-02 8 URUMI Stage1 9 URUMI Stage2 10 Bothathan kettu(P) 16 Apr-06 11 Ullangal(P) Jun-06 12 Karikkayam(p) 15 Mar-06 Thermal 13 DCP Kasarkode 105 Dec-03
123
POWERGRID IN SOUTHERN REGION
EXISTING TRANSMISSION FACILITY I) Transmission System 400 / 220 kV Transmission Line – 6,700 Circuit Kms. 400 kV S/S – 15 Nos. with 7350 MVA transformation capacity Load Despatch & Communication System Unified Load Despatch & Communication System in SR HVDC B/B Station 1000 MW Chandrapur (WR – SR Interconnection) 500 MW Gazuwaka (ER – SR Interconnection) Talcher-II – Kolar 2000 MW HVDC Bipole Link alongwith AC Line (Major Part commissioned) Longest HVDC Pole (about 1400 kms.) from Talcher to Kolar Completed cost – Rs. 700 crores less than the approved cost of Rs crores Commissioned 9 months ahead of schedule in September 2002. Second pole test charged on Besides Talcher-II power it would facilitate transfer of surplus power of Eastern Region to Southern Region
124
EVOLUTION OF POWER SYSTEM IN INDIA
PRE INDEPENDENCE - SMALL ISOLATED SYSTEM PRIOR TO 60s - GENEARTION/TRANSMISION BY SEBS DURING 60s - LIMITED INTERCONNECTION BETWEEN NEIGHBOURING STATES 70s - EMERGENCE OF CENTRAL SECTOR GENERATION ( NTPC/NHPC/NUCLEAR ETC.) PLANNING OF GENERATION/TRANSMISSION ON REGIONAL BASIS LATE 80s – INTEGRATED GRID OPERATION THRO’ 400kV SYSTEM LATE 90s - ASYNCHRONOUS INTER REGIONAL LINKS LONG DISTANCE HVDC LINKS / BtB STATIONS
125
POST INDEPENDENT INDIA
ELECTRICITY AN INDEX FOR DEVELOPMENT OF THE NATIONAL ECONOMY. INVOLVEMENT OF STATE GOVERNMENTS FOR DEVELOPMENT OF THE POWER SECTOR. CENTRALISED CONTROL FOR COORDINATION AND IMPLEMENTATION BY STATE OR REGIONAL BODIES
126
Power sector is governed by three principal Acts namely –
i) The Indian Electricity Act, 1910, deals with functioning and regulation of the private licensees ii) The Electricity (Supply) Act, 1948 deals with establishment and functioning of SEBs iii) The Electricity Regulatory Commissions Act, 1998. establishment of SERCs & CERC
127
INDIAN ELECTRICITY ACT 1910
(ACT 9 OF 1910) INTRODUCE THE CONCEPT OF LICENCES IMPOSE CERTAIN DUTIES AND LIABILITIES ON SUCH LICENSEES. INTRODUCE CERTAIN PENAL PROVISIONS
128
IMPORTANT PROVISIONS OF ELECTRICITY (SUPPLY) ACT 1948
FORMATION OF CEA FORMATION OF SEBs GREATER RESTRICTION AND CONTROL ON THE LICENSEES’ OPERATION LAYING DOWN PRINCIPLES OF TARIFF SPELLING OUT FINANCIAL PRINCIPLES AND THEIR APPLICATION BOTH FOR THE SEBs AND LICENSEE
129
AMENDMENT OF 1998 DEFINES CENTRAL TRANMISSION UITILITY
DEFINES CENTRAL TRANMISSION UITILITY INTER-STATE TRANSMISSION OF POWER STATE TRANSMISSION UTILITY TRANSMISSION LICENSEES.
130
ELECTRICITY ACT AMENDMENTS IN 1998 SALIENT FEATURES
TRANSMISSION RECOGNISED AS SEPARATE ACTIVITY AND CONCEPT OF TRANSMISSION LICENSEE REDUCED CONCEPT OF A CENTRAL TRANSMISSION UTILITY (CTU) AND STATE TRANSMISSION UTILITIES (STUs) RLDCs TO BE OPERATED BY POWERGRID UNLESS OTHERWISE SPECIFIED BY THE GOVERNMENT RLDCs DESIGNATED AS APEX BODIES TO ENSURE INTEGRATED OPERATION OF POWER SYSTEM IN EACH REGION RLDCs TO ENFORCE ABOVE DECISIONS OF REBs
131
ELECTRICITY REGULATORY COMMISSION ACT 1998
THIS ACT PROVIDES ESTABLISHMENT OF CENTRAL ELECTRICITY REGULATORY COMMISSION ESTABLISHMENT OF STATE ELECTRICITY REGULATORY COMMISSION , RATIONALIZATION OF ELECTRICITY TARIFF,
132
Regional Load Despatch Centres (RLDCs)
NEED FOR A CONTROL CENTRE (RLDC) IN EACH REGION FELT IN LATE SEVENTIES RLDCs UNDER CEA / REB.
133
The installed capacity
1362 MW in 1947 93249 MW in March 1999
134
Table 1: Growth of Indian Power Sector Parameter Present Status
Growth since independence (times) Installed Capacity (MW) 97,000 55 No. of Consumers (Million) 80 52 Agricultural Connections (Million) 13 580 T & D Network ('000 ckt. Km.) 600 175 Electrified Villages ('000) 500 165 Per Capita Consumption (kWh) 350 22 Note: Above numbers are indicative
135
Indian Power Scenario Current capacity - 115 GW
50 times increase in last 50 years since Independence
136
Forms of Power
137
Growth Plans Annual growth in last 4 years - 3000 MW
Optimistic scenario to 6000 MW per year in the next 4 to 5 years. Pessimistic Scenario MW p.a. 1/3 to ¼ of from IPPs. Rest from SEBs / NTPC / NHPC etc
138
Thank you
139
IEGC PARAMETERS 49.0 Hz - 50.5 Hz 400kV 360kV - 420kV
FREQUENCY 49.0 Hz Hz Voltage 400kV kV kV 220kV kV kV 132kV kV kV
140
ABT REVOLUSIONISE GRID OPERATIONS INDUCES GRID DISCIPLINE
ENCOURAGES MERIT ORDER IMPROVES SYSTEM PARAMETERS & GRID SECURITY TRADING OPTIMAL UTILISATION OF RESOURCES
141
ABT WR NR SR ER
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.