Download presentation
Presentation is loading. Please wait.
Published byDale Carter Modified over 9 years ago
1
Planetary Missions Division Dvk, 26 Jun 2002 Pointing scenario - presented at the SWT #10 Daily schedule Overall status/How to proceed Status of inputs Detlef Koschny and the Science Operations Team Research and Scientific Support Department ESA/ESTEC detlef.koschny@rssd.esa.int
2
Planetary Missions Division Dvk, 26 Jun 2002 Daily schedule Day 1 (Th, 24 Mar 2003): CONSERT checkout and interference analysis Day 2 (Fr, 25 Mar 2003): First pointing/slewing, switch on experiments, check experiments Day 3 (Mo, 28 Mar 2003): Point at star fields and bright stars, co-alignment and distortion Day 4 (Tu, 29 Mar 2003): Point at star fields and bright stars, co-alignment and distortion Day 5 (We, 30 Mar 2003): Straylight test, 180 deg sun angle to 90 deg sun angle Day 6 (Th, 31 Mar 2003): Straylight test, 90 deg sun angle to 45 deg sun angle Day 7 (Fr, 01 Apr 2003): RSI operations Day 8 (Mo, 04 Apr 2003): Straylight test, 45 deg sun angle to 20 deg sun angle Day 9 (Tu, 05 Apr 2003): Planets, Stars and molecular clouds Day 10 (We, 06 Apr 2003): Planets, Stars, and molecular clouds Day 11 (Th, 07 Apr 2003): Contingency Day 12 (Fr, 08 Apr 2003): Contingency
3
Planetary Missions Division Dvk, 26 Jun 2002 General status Technical note describing the scenario in Issue Draft h. Contains Geometry info in graphical form (tables available on http://astro.estec.esa.nl/livelink, Rosetta/Mission Scenario Design/Scenario library/Pointing). http://astro.estec.esa.nl/livelink Our understanding of your requests, based on SOWG input, emails, etc. Needs an estimated one more week to wrap up, convert to Master Science Plan From your side: Prepare TC sequences – we need to fill in the names of the TC sequences (In some cases, ESOC is preparing this)! How to proceed: Face to face discussions (this afternoon?) Monday I will send out the updated ITL with the Pointing Skeleton Email – phone discussion to finalize it Tuesday: Telecon RSOC-RMOC – discussion about pointing with Flight Dynamics Finalize by 10 July, we finish Master Science Plan and send to ESOC
4
Planetary Missions Division Dvk, 26 Jun 2002 Status of inputs ALICE: No formal input, only A’Hearn’s input from SOWG 1 year ago COSIMA: No requests CONSERT: Input on procedure level, incorporated in our skeleton – needs final comments from CONSERT GIADA: Inputs available, TC sequence names tbd MIDAS: Inputs from SOWG, iteration needed – provide TC sequences MIRO: Top-level input available from SOWG, Sam to check TN and Skeleton and send updated (“English prosa”) requests OSIRIS: Top-level input incorporated in our skeleton – Nick to fill in TC sequence names RPC: Inputs from SOWG, iteration needed RSI: Requirements understood, pointing requests to be formulated by SOT ROSINA: No requests VIRTIS: Inputs available, incorporated in our skeleton – needs brush-up from SOT and filling in of detailed TC sequences
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.