Download presentation
1
Unit 2, Day 5 Slingshot Design
2
Agenda Homework Slingshot Design
Slingshot Building (if you are approved!)
3
Homework DUE MONDAY: SLC Online Action Plan
If not finished on Monday, MANDATORY reflection hour at 1:00PM Monday until finished. (Parents will have to wait) DUE TODAY/MONDAY/TUESDAY: Slingshot Designs Slingshot designs must be approved to start building
4
Slingshot Designs Materials will be passed around; take a look
You are NOT allowed to begin building until EVERY group member’s designs are approved! If absent Mon/Tue, you are NOT excused from this work. You hold up your entire group if you do not turn it in. Take a picture of it and text/ it to me BEFORE class. Failure to turn it in on Mon/Tue = ZERO
5
Slingshot Designs Each group member must use the ENTIRE BOX to draw a design of your slingshot from a DIFFERENT angle: Top view, Front view, Side view
6
Slingshot Designs You may ONLY build the slingshot from these available materials: Four feet of surgical tubing Two yards of duct tape Half of a Wiffle ball Two 6-inch dowel rods
7
Slingshot Designs You must also indicate how you plan to DECORATE the slingshot: Draw any patterns you will use Label the colors you want to have
8
Homework DUE MONDAY: SLC Online Action Plan
If not finished on Monday, MANDATORY reflection hour at 1:00PM Monday until finished. (Parents will have to wait) DUE TODAY/MONDAY/TUESDAY: Slingshot Designs Slingshot designs must be approved to start building
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.