Presentation is loading. Please wait.

Presentation is loading. Please wait.

Unit 2, Day 5 Slingshot Design.

Similar presentations


Presentation on theme: "Unit 2, Day 5 Slingshot Design."— Presentation transcript:

1 Unit 2, Day 5 Slingshot Design

2 Agenda Homework Slingshot Design
Slingshot Building (if you are approved!)

3 Homework DUE MONDAY: SLC Online Action Plan
If not finished on Monday, MANDATORY reflection hour at 1:00PM Monday until finished. (Parents will have to wait) DUE TODAY/MONDAY/TUESDAY: Slingshot Designs Slingshot designs must be approved to start building

4 Slingshot Designs Materials will be passed around; take a look
You are NOT allowed to begin building until EVERY group member’s designs are approved! If absent Mon/Tue, you are NOT excused from this work. You hold up your entire group if you do not turn it in. Take a picture of it and text/ it to me BEFORE class. Failure to turn it in on Mon/Tue = ZERO

5 Slingshot Designs Each group member must use the ENTIRE BOX to draw a design of your slingshot from a DIFFERENT angle: Top view, Front view, Side view

6 Slingshot Designs You may ONLY build the slingshot from these available materials: Four feet of surgical tubing Two yards of duct tape Half of a Wiffle ball Two 6-inch dowel rods

7 Slingshot Designs You must also indicate how you plan to DECORATE the slingshot: Draw any patterns you will use Label the colors you want to have

8 Homework DUE MONDAY: SLC Online Action Plan
If not finished on Monday, MANDATORY reflection hour at 1:00PM Monday until finished. (Parents will have to wait) DUE TODAY/MONDAY/TUESDAY: Slingshot Designs Slingshot designs must be approved to start building


Download ppt "Unit 2, Day 5 Slingshot Design."

Similar presentations


Ads by Google