MEP (Martian Environmental Pod) 3/15/2004 Aerospace Engineering Department University of Colorado-Boulder Interim Review #2
2
Request for Action RFAAuthorSolution Cannot weld aluminum shaft to petals PaloKey the aluminum shaft and aluminum sleeve No welding near acrylic parts
3
x 10 Electronics Package Platform Mounting Box Greenhouse Thermal Petals
4
Design Changes Greenhouse/Pressure System –Molding tool design Thermal Shield/Structure –Keyed aluminum shaft and aluminum sleeve –New assembly order Electronics/Software –Trimpot
5
Molding Tool New design allows for the use of a furnace instead of internal heater Shelled out to reduce heating time Rolling method is done by hand on top of grooved plate
6
Keyed Shaft and Sleeve Keyed aluminum shaft to eliminate the need for welding Key –0.1’’ x 0.2’’ x 0.3’’ Aluminum shaft –Depth: 0.1’’ Aluminum sleeve –Depth: 0.2’’
7
New Assembly Order
8
Greenhouse/Pressure System Molding tool is complete Tested for functionality: –Control valve –Regulator and CO 2 tank
9
Thermal Shield/Structure Completed petals 1 - 5 using new epoxy Machined parts for petals 6 - 10 Machined electronics box parts
10
Electronic Setup
11
Software Setup
13
Electronics Testing Verified functional operation of: –Pressure transducer –Thermistor –Determined conversion coefficient –LabView
14
Current Issues Laser cutter availability/reliability –Solution: sand edges for even mating surface Outdoor testing -Solution: car inverter for power supply and data acquisition system
15
To Be Completed: Greenhouse/Pressure System Molding plate (3/19/04) Shape Kapton for deployable greenhouse (3/31/04) Construct greenhouse around acrylic rings (4/2/04)
16
To Be Completed: Thermal Shield/Structure Finish constructing thermal shield (3/19/04) Machine and construct base structure (3/28/04) Machine aluminum shaft and sleeve (3/31/04)
17
To Be Completed: Electronics Integration of Trimpot (3/28/04) Finish Circuit (4/2/04) –Copper Custom Plate
18
Integration Fasten greenhouse to mounting box (3/28 – 3/31) Assemble final structure (3/28 – 4/2) Integrate pressure and power sources with electronics package (3/28 – 4/2)
19
Schedule Progress
20
DateCompanyPartsPhone NumberAmount 12/15/2003Kinko'scopies $207.94 12/15/2003Kinko'scopies $19.20 12/17/2003Colorado Plastic Products Inc.acrylic, epoxy303-443-9271$10.67 1/15/2004R.S. Hughes Company Inc.epoxy303-371-9440$33.30 1/20/2004Omega Engineering Inc.thermistor, pressure transducer203-359-1660$114.35 1/21/2004Maxon Precision Motors Inc.motors, gearboxes650-697-9614$348.27 1/22/2004R.S. Hughes Company Inc.epoxy gun, mixing nozzles303-371-9440$62.93 1/27/2004American DurafilmKapton508-429-8000$163.08 1/28/2004McGunkin Hardware Inc.clamps, aluminum rods, key303-443-1822$62.47 1/28/2004Colorado Plastic Products Inc.acrylic303-443-9271$10.32 1/28/2004R.S. Hughes Company Inc.mixing nozzles303-371-9440$47.90 1/28/2004The Lee Companycontrol valve860-399-6281$0.00 1/30/2004Radio Shackelectronics $30.84 1/31/2004Radio Shackelectronics $54.54 1/31/2004Fistell'srelay switch $30.40 2/9/2004Colorado Plastic Products Inc.acrylic303-443-9271$42.00 2/12/2004The Beverage Factorycarbon dioxide tank $109.90 2/25/2004McGunkin Hardware Inc.clamps, gas line $117.56 3/1/2004Colorado Plastic Products Inc.acrylic $20.50 3/10/2004Hobbytown USA Inc.CA glue $46.37 Total:$1,532.54
21
Questions?