Download presentation
Presentation is loading. Please wait.
Published byLindsey Fowler Modified over 9 years ago
1
1LHC COOP, 01.-02.12.1999Uwe EPTING, CERN, ST/MO LHC - Technical Infrastructure Monitoring Uwe EPTING CERN, ST/MO
2
2LHC COOP, 01.-02.12.1999Uwe EPTING, CERN, ST/MO Today’s Services Electricity HT, MT, BT, Energy Consumption, ENS Water Pumping Stations, Raw, Prim, Chilled, Demi,... Thermal Air-conditioning, Ventilation, Heating Vacuum Pumps, Pressures Safety Fire, Gas, Emergency Stop,... Hardware Front ends, Servers Control Network Cryogenics Pumps, Temperatures TCR 24h/day 365days/year Supervision Breakdown and stand-by services Troubleshooting coordination
3
3LHC COOP, 01.-02.12.1999Uwe EPTING, CERN, ST/MO Some Numbers TODAY: – ~ 100.000 signals ~ 50.000 alarms ~ 50.000 others – ~ 440 Equipment types (Classes) – ~ 800 Mimic diagrams –Interaction with 8 Divisions, 22 groups more than 70 responsibles
4
4LHC COOP, 01.-02.12.1999Uwe EPTING, CERN, ST/MO Schedule TDS InstallationTIM Specification Publish/Subscribe Mechanism Message Oriented Data Transmission Event Driven Data Reference Database TDS Operation Integration of New Alarms Removal of Old Equipment Definition of Equipment Drivers LEP operation Upgrade LHC operation User Requirements System Requirements Interface Definition Network Specifications HCI Conventions Alarm Integration Procedure 1995199920002005 Year ST/EL - ENS (12/1999) ST/CV - Wizcon ( 06/2000) Safety Alarms (CSAM)... Data Exchange Services Object Oriented Data TIM Integration Maintenance Contract for Software Support TIM Operation
5
5LHC COOP, 01.-02.12.1999Uwe EPTING, CERN, ST/MO Architecture TDRefDB reference database Excel Sheet Alarm Integration Procedure Accelerator/ Experiments SCADA PLCs MMD Multipurpose Monitoring Device PLCI/O DigitalI/O Analog EC Equipment Controller EC Equipment Controller EC Equipment Controller TDS Technical Data Server TCR SCR PCR XCR ANS Alarm Notification Server ELS Event Logging System CAS CERN Alarm System
6
6LHC COOP, 01.-02.12.1999Uwe EPTING, CERN, ST/MO Interfaces I/O - PLC - Fieldbus TCP/IP integration of PLCs and SCADA Middleware Operator Console CDIB CERN Data Interchange Bus Remote Access Raw Data WWW
7
7LHC COOP, 01.-02.12.1999Uwe EPTING, CERN, ST/MO Tag oriented vs. Device Oriented –TODAY: “device oriented tagnaming” –example: Naming Device Attributes Device Type Device Name +------------------------ System |+----------------------- Subsystem ||+---------------------- Equipment Class ||| +----------------- Localization ||| | +-------------- Code ||| | | +------------ Name ||| | | | +--- Type ||| | | | | +- Attributes ||| | | | | | fwre01_ba6ci600regul_tmtr +------+-----------+----- Class Member Attribute
8
8LHC COOP, 01.-02.12.1999Uwe EPTING, CERN, ST/MO Networking TODAY: –Physical networks pass mostly via PCR –Domain Name Servers are located in PCR –Maintenance done by SL/CO but they rely on Division IT ATTENTION: –Avoid Dependencies –Christmas Shutdown + Maintenance –Coordination Problems between responsible services
9
9LHC COOP, 01.-02.12.1999Uwe EPTING, CERN, ST/MO Hardware and OS TODAY: –All control software is HP-UX based –already first Linux Installation (JavaGUILS) –industrial PLCs (Siemens and Schneider) at equipment level BUT: –PCs and Windows NT tomorrow?
10
10LHC COOP, 01.-02.12.1999Uwe EPTING, CERN, ST/MO Software TODAY: –MMI with DataViews –Transmission with SmartSockets 5 (Middleware) on publish/subscribe basis –Data acquisition with industrial PLCs and standard software (ISEC - Industrial System Equipment Controller) –DataLogging with ELS (Event Logging System) in Oracle, JavaGUILS as user interface TREND: –SCADA Systems vs. Component Ware
11
11LHC COOP, 01.-02.12.1999Uwe EPTING, CERN, ST/MO Data Exchange Timing/Synchronization –Correlation of data –Granularity of time: Seconds.. Milliseconds? “Middleware” –SL/CO middleware project Working Groups: –CIWG - LHC Communication Infrastructure WG –LDIWG - LHC Systems Data Interchange WG –TimWG - Timing Working Group
12
12LHC COOP, 01.-02.12.1999Uwe EPTING, CERN, ST/MO Conclusion AIM: –provide a high quality monitoring of the services Requirements: –Define the role of the TCR for the LHC era –Which services should we provide? –Unique Alarm Display (today: CAS) –Coherent Mimic Diagrams –Clear Procedures for Operators –Unique Data Logging –Link to Maintenance Management Systems –Integration into Operator’s Console
13
13LHC COOP, 01.-02.12.1999Uwe EPTING, CERN, ST/MO Questions? More info: –http://nicewww.cern.ch/~stmoin/projects/tim/tim.htm
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.