Presentation is loading. Please wait.

Presentation is loading. Please wait.

IETF79 Nov 2010 Routing metrics ID -11 draft-ietf-roll-routing-metrics-11 JP Mijeon Kris.

Similar presentations


Presentation on theme: "IETF79 Nov 2010 Routing metrics ID -11 draft-ietf-roll-routing-metrics-11 JP Mijeon Kris."— Presentation transcript:

1 IETF79 Nov 2010 Routing metrics ID -11 draft-ietf-roll-routing-metrics-11 JP Vasseurjpv@cisco.comjpv@cisco.com Mijeon Kimmjkim@kt.commjkim@kt.com Kris Pisterpister@eecs.berkeley.edupister@eecs.berkeley.edu Nicolas Déjeannicolas.dejean@coronis.comnicolas.dejean@coronis.com Dominique Bartheldominique.barthel@orange-ftgroup.comdominique.barthel@orange-ftgroup.com

2 What is it? Companion document to RPL core spec and to Objective Functions definition Defines the metrics and constraints –To be used to build RPL routing paths

3 Since Maastricht No request for compound metrics -09 published Sept 6th Last Called Sept 16th-30th Generated about 30 emails 6 tickets opened, #79-84 All tickets closed by Oct 19th -10 published Oct 20th -11 published Oct 25th -12 published Nov 8th Publication request done

4 Changes in -09 over -08 Eased ordering requirement (implicit precedence) –added explicit metrics precedence field Removed Global/Local bit Cases allowed in -08 –C=0, G=0local metric –C=0, G=1, R=1recorded metric –C=0, G=1, R=0, A=xxaggregated metric, 4 possible operators –C=1,O=0mandatory constraint –C=1,O=1optional constraint Removed mention of compound metrics

5 Ticket #79 Request to add Link Energy Metric Difficult to use in practice Polled mailing list Nobody but 1 wants it Not included in this revision –Can always be added later, values available

6 Ticket #80 Question on metrics and variety of links? RPL is an L3 protocol, meant to run over a variety of links. The proposed set of metrics are relevant for a variety of links.

7 Ticket #81 Question why metrics operator in A field of DIO and not in OF? Metrics and OF have been decoupled Processing of Dag Metric Containers as DIOs traverse nodes is defined in metrics document Decision to elect parent and compute rank is in OF document.

8 Ticket #82 Question on how does a node know its own Fanout Ratio? Real issue Fanout Ratio metric/constraint removed from draft

9 Ticket #83 Editorial comments Thanks, Phoebus! Taken into account

10 Ticket #84 Node energy (E-E field) is a ratio, not absolute value –How to differentiate "small" vs "large" node? Either use E field, which is absolute –Mains, scavenger, primary battery Or use other metric

11 Changes in -11 over -10 Lots of text clarification, trimming Changes in -12 over -11 More text clarification, trimming

12 Conclusions Already sophisticated mechanisms –Multiple metrics with precedence New metrics could be added as needed Work completed Next is IESG review


Download ppt "IETF79 Nov 2010 Routing metrics ID -11 draft-ietf-roll-routing-metrics-11 JP Mijeon Kris."

Similar presentations


Ads by Google