Download presentation
Presentation is loading. Please wait.
Published byBaldwin Wood Modified over 9 years ago
1
® Address Quality Strategy Update
2
Transformation Strategies Reduce Costs Increase Delivery Point Sequencing to 95% Improve Service Reduce UAA by 50% By 2010 our goal is to:
3
Address Quality Approach Education/Awareness ●PCC/NPF Incentives ●OneCode ACS Requirements ●CASS™/DPV™ Address Quality
4
Education/Awareness NPF / PCC / MTAC USPS Articles Trade Press Articles RIBBS CASS Web Site NCSC Sales / BSN / BME Address Quality
5
Initiatives to Reduce UAA Internet Change-of-Address MTAC Recommended Best Practices NCOA Link™ Match Rates New Temporary Change-of-Address Policy Address Element Correction I & II PARS ( Complete Fall 2007) Address Quality
6
Initiatives to Reduce UAA CASS with DPV – August 1 Move Update Requirement – Every 3 Months Implement Move Update Requirement for Standard Mail OneCodeACS for Use on Flats – available May 1 Address Quality
7
Future Initiatives to Reduce UAA WG 104 on Mail List Certification WG 113 Address/Barcode Requirements for FSS WG 116 Great addressing to increase value of mail Implement Mailer-specific UAA Measurement Address Quality
8
® CASS ™ CYCLE “L” UPDATE
9
® CASS ™ Cycle “L” CASS Cycle “L” required for automation discounts beginning August 1, 2007 LACS Link™ processing is a requirement under CASS Cycle “L” DPV ™ processing is a requirement under CASS Cycle “L”
10
® Performance: Full DPV (Hash Table) showed an increase in both CPU and wall clock processing Testing with flat file DPV proved to reduce that impact significantly DirectDPV has reduced both CPU and wall clock processing time
11
® Status: 30 manufactures have passed CASS ™ Cycle L Certification on multiple platforms 1 manufacture have failed certification on 2 platforms A list of CASS vendors is available at www.ribbs.usps.gov
12
® What’s Next? Move Update Federal Register Notice Expect to publish this week 30-day comment period Implementation date will be 18 months from date Federal Register Notice Published
13
® What’s Next? CASS Cycle M Require vendor to enable the interface to Suite Link product Make Suite Link available to customers upon request
14
® What’s Next? CASS Cycle N Suite Link required for automation rate mailings
15
® Questions?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.