Download presentation
Presentation is loading. Please wait.
Published byBruno Hill Modified over 9 years ago
1
Impact of the California High Speed Rail System Lee Ann Eager, Chief Operating Officer Economic Development Corporation serving Fresno County
2
Current Status 800 mile track (San Diego to San Francisco) Up to 220 mph Expected ridership (2025): Los Angeles to San Francisco: 120,000 People Daily $5.5 Billion Total Construction Start Date: September 2012 Ride Start date: 2017
3
Local Benefits Cheaper, faster and more convenient travel connected to local public transportation Revitalized communities and economic development around new transportation terminals
4
Improved movement of people, goods and services Faster travel on the ground between major metropolitan areas Congestion relief on freeways and at airports Right now, congestion costs approximately $20 billion per year in wasted fuel and lost time Overall Benefits
5
The potential for 450,000 permanent new jobs statewide created over the next 25 years Economic Benefits
6
As many as 100,000 construction-related jobs each year that the system is being built Which means… 600,000 construction related jobs over the life of the project
7
Types of Jobs Created PRECONSTRUCTION JOBS ▫Right of Way Engineering ▫Cleaning & Grubbing ▫Surveying ▫Construction Management ▫Inspection ▫Demolition ▫Hazmat Removal ▫Utility Relocation
8
CORE SYSTEM JOBS Train sets Train Control – Signaling Communications Central Control Center – Operations & power supply Electrification / Traction Power – Traction power supply stations – Switching/paralleling stations – Overhead contact systems (OCS) Track, ties/ballast, fastening system Maintenance equipment for trains & systems Types of Jobs Created
9
MAINTENANCE JOBS Train servicing & inspection Train maintenance Fixed core system & infrastructure inspection & maintenance OPERATION JOBS Service planning & fare setting Operations planning, scheduling, fares Train driving & dispatching On-board passenger services Ticketing & revenue accounting Station services & security Types of Jobs Created
10
Projected Impact: Local Example Los Angeles, California $360 million per year of new spending in LA downtown area $234 million: Southern CA visitors $126 million: long distance visitors
12
Actual Impact: International Example Shinkansen, Japan In the 10 years after HSR, cities had: Population growth rates 22% higher Industrial, retail, wholesale sector and construction 16-34% higher Significant hotel growth Land prices in commercial areas 67% higher
13
High speed trains will boost CA’s economy: 450,000 permanent jobs 600,000 construction jobs over the course of the project Improving the movement of people, goods and services Reducing travel times and road congestion Summary
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.