Moeller GmbH xEnergy - Page 1 Exercises
2
Moeller GmbH xEnergy - Page 2 Example 1:Create a distribution board with… Degree of protection:IP 31 Main busbar:no busbar Cable connection:from bottom Dimensions (WxHxD):800 x 2000 x 600 mm Plinth:no Internal partitions:Form 1 1 no. Section for frequency inverter. Width: 800 mm, with section high mounting plate.
3
Moeller GmbH xEnergy - Page 3 Example 2:Create a distribution board with… Degree of protection:IP 31 Netform:TN-S Cable connection:from bottom Dimensions (WxHxD):? x 2000 x 600 mm Plinth:no Internal partitions:Form 4 Switchgear: 1 no.ACB 3-pole, fixed mounted3200 A 1 no.MCCB, 3-pole, fixed mounted 800 A 1 no.MCCB, 3-pole, withdrawable1600 A 1 no. Section for frequency inverter. Width: 800 mm, with section high mounting plate.
4
Moeller GmbH xEnergy - Page 4 Example 2:possible front-view
5
Moeller GmbH xEnergy - Page 5 Example 2:part list with xEnergy standard line
6
Moeller GmbH xEnergy - Page 6 Example 2:Questions 1.„Our customer is not satisfied with the size of cable connection area for the 1600 A NZM4 breaker.“ - What can we do? - How many ordering types do we have to change? 2.„Our customer wants now 800 mm deep sections.“ - Is it possible? How? 3.„Now the NZM4 should be with remote operation.“ - Is it possible? How? 4.„The IZM should be withdrawable.“ - Is it possible? - How many ordering types do we have to change? Change section width to 600 mm. Only one: XSNW0643 - Yes with fixed mounted NZM4. No change. - Also yes with withdrawable NZM4, but not with standard line. Go to catalogue. Yes, but not with standard line. Go to catalogue. Yes. No changes.
7
Moeller GmbH xEnergy - Page 7 Example 3:Create a distribution board with… Degree of protection:IP 55 Netform:TN-S Cable connection:from bottom Dimensions (WxHxD):? x 2000 x 600 mm Plinth:100 mm Internal partitions:Form 4 Switchgear: 1 no.ACB 3-pole, withdrawable1600 A 12 nos.MCCB, 3-pole, fixed mountedup to 125 A 8 nos.MCCB, 3-pole, fixed mounted160 A 4 nos.MCCB, 3-pole, fixed mounted200 A 2 nos.MCCB, 3-pole, fixed mounted400 A 2 nos.MCB, 3P+N16 A
8
Moeller GmbH xEnergy - Page 8 Example 3:possible front-view
9
Moeller GmbH xEnergy - Page 9 Example 3:part list with xEnergy standard line
10
Moeller GmbH xEnergy - Page 10 Example 4:possible front-view