Download presentation
Presentation is loading. Please wait.
Published byRosalind McDaniel Modified over 9 years ago
1
Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by: Dr. C. Visvanathan Environmental Engineering Division Asian Institute of Technology Bangkok, Thailand Funded by: Carl Duisberg Gesellschaft (CDG) South East Asia Program Office Bangkok, Thailand Next
2
Visu PCW Training Crew Next
3
Visu CDG-SEAPO/EEP – AIT Training Workshop on IPPC 1- 4 May, 1995 Next
4
Visu Project Case Work Approach PCW Training Clips Integrated Waste Management A peek from the conference hall Trainers
5
Visu Multidisciplinary Participants 25 graduate students from various fields of study (AIT); –Environmental Engineering ( 5 students) –Energy Technology ( 5 students) –School of Management ( 5 students) –Industrial Engineering ( 5 students) –Human Settlement Division ( 5 students) Next
6
Visu Student Selection Criteria Different academic background (to represent an industry) Different Nationality Gender Balance Interview by the Funding Agency (CDG) Next
7
Visu Role of Trainer Serves more as; –Facilitator –Technical advisor –Catalyst of learning Rather than; –Lecturers –Story-tellers –Instructors Next
8
Visu Group 1Group 2Group 3Group 4 Presentations Brain Storming Trainer Evaluation & Consultancy Restructuring Q & A Trainer Evaluation & Consultancy Q & A Group 1Group 2Group 3Group 4 Baseline information Problem Statement Solution PCW Approach Back
9
Visu Integrated Waste Management Education Through Project Case Work Approach Rapid Industrialization Limited assimilative capacity of the receiving body Industrial Pollution Cradle–to–Grave Responsibility Introduction Next
10
Visu Integrated Approach Traditional Approach > EOP Waste Treatment Even, Pollution Prevention/ CP > No Total Elimination Integrated Approach: EOP + CP > Appropriate Solution In need of Integrated Approach Next
11
Visu Training of Integrated Approach Multidisciplinary approach Multidisciplinary inputs Real life situation/ should revolve near real life situation Working under pressure to solve a problem Working under a team: Handling Idea Generators/ Killer/ Implementers Next
12
Visu Case Study Management committee of Super Shine Thai Ltd. Faces an unrelenting threat from Pollution Control Department (PCD). Their industrial license will be cancelled within two months unless its wastewater meets Industrial Wastewater Discharge (IWD) discharge standards, i.e. ‘Electroplating shop has to be closed down within a period of two months’. Management committee in panic situation and calls for their senior staff consisting of; Chief Executive Officer, Plant Manager, Environmental Manager, Chief Engineer, Veteran Electroplater, Utility and Energy Manager –They were given three days to solve the problem: This is the background of the presented PCW training Next
13
Visu List of Games Plant layout Game –The group with the best layout in terms of improved production efficiency and reduced environmental impact will be the winner. Degreasing Solvent Selection Game –The group with the best washing efficiency and the best washing efficiency will be the winner. Rinsing Game –The group carrying out the best quality rinsing with the least cost will be the winner. Next
14
Visu Sample of PCW Training Schedule (Day 2) Morning: Video on Electroplating Process Assessing Plant information (Collect available data and inspect site, Establish Priorities and problem area) Group Work Material Balance and Identifying IPPC Options (Material balance methodology, Generate options, Screen options, Balancing Pollution Prevention and Pollution Control) Video: Competitive edge Group Work Afternoon: Interim Presentation by each group on Material Balance Exercise Pollution Control and Material Recovery Technologies Video: Money Down the Drain Group work + Software Demonstration: Waste Reduction Advisory System by USEPA Management Issues in IPPC- Time and Motion Studies, Line Balancing Techniques etc. Group Work Post Dinner Session: Pollution Prevention Game 2 – Oily Washers Game Menu
15
Visu Problem statement and baseline information Q & A session after presentation Demonstration of electroplating mechanism PCW Training Clips Teamwork ‘ Different Strategy’ Back to AIT Final Presentations Lighter moments Intermediate Presentations Midnight Strategic Planning Prize distribution Menu
16
Visu Demonstrating the Electroplating Process Various Processes Involved Environmental Hazards Waste Minimization Options Common Problems Involved Dr. C. Visvanathan PCW Clips
17
Visu Teamwork Highly Educative and Enjoyable Group 1 Group 2 Learning by Doing ‘Different Strategy’ Click & Watch Next
18
Visu Learning by Doing ‘Different Strategy’ Pressure of time Near to real life scenario Group 3 Group 4 Click & Watch PCW Clips
19
Visu Baseline information about: Present scenarios Pollutions Preventions Cleaner Production EOP waste treatment PCW Clips
20
Visu Training of trainers Dr. C. Visvanathan Environmental Engineering Division Asian Institute of Technology Bangkok, Thailand Prof. P. Modak Indian Institute of Technology Mumbai, India Lead Trainers: Watch Menu
21
Visu Q & A Session After Presentation PCW Clips
22
Visu Final Presentations Click & Watch Next
23
Visu PCW Clips Final Presentations Click & Watch
24
Visu Midnight Strategic Planning PCW Clips
25
Visu Trainer: Prof. P. Modak Back
26
Visu A Peek From Conference Hall Menu PCW Training wishes an Idyllic and Serene Environment
27
Visu Lighter Moments PCW Clips
28
Visu Intermediate Presentations Next Click & Watch
29
Visu Intermediate Presentations PCW Clips Click & Watch
30
Visu Prize Distribution PCW Clips
31
Visu Training of Trainers Back One Dimensional Learning Universities to Three Dimensional Learning of PCW
32
Visu Trainer: Dr. C. Visvanathan Back
33
Visu Photo Session PCW Clips
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.