Gas Line Rover Noah Baker Douglas Maxey Ken Mentasti N. Alex Scott Matthew Stewart BP Gas Line Rover 1/ 27/ 04 British Petroleum Brandon McNerlin
2
Presentation Outline BP Gas Line Rover1/ 27/ 04 Labor and Responsibilities Schedule Risk and Contingency Plan Conclusion Project History Objectives Electrical Components Design Approach Implementation
3
Project History Project Background Design Specifications Navigational Capabilities Mechanical Integrity Electrical Subsystems User Interface BP Gas Line Rover1/ 27/ 04
4
Objectives Control System Power Distribution Video Feeds/Control User Interface Additional Items: Tether Reel Motor Laser Range Finder Manipulator Arm BP Gas Line Rover1/ 27/ 04
5
Current Electrical Components BP Gas Line Rover1/ 27/ 04 Power Supply/Converter Tether Reel Lighting System Front/Rear Camera System Drive/Steering Motor Control
6
Implementation - Power BP Gas Line Rover1/ 27/ 04
7
Implementation - Control BP Gas Line Rover1/ 27/ 04
8
Design Approach BP Gas Line Rover1/ 27/ 04 Review Requirements Reverse Engineering Design Modular Components Integrate Components
9
Schedule BP Gas Line Rover1/ 27/ 04
10
Labor and Responsibilities BP Gas Line Rover1/ 27/ 04 Noah – Power Distribution and Motor Control Doug – Power Distribution and Motor Control Ken – User Interface, Control System Alex – Control System, Video Matt – Processor
11
Risk and Contingency Plan BP Gas Line Rover1/ 27/ 04 Temperature Size and Weight Modular Integration Avoiding Obstructions System Failure Recovery
12
Safety and You BP Gas Line Rover1/ 27/ 04 Magnetic Wheels 80V Power Supply UL compliant Rotating Chain Drive Assembly Capacitor Discharge
13
Economic and Environmental Aspects BP Gas Line Rover1/ 27/ 04 Financial Support From BP Being Developed for Commercial Application Other Investigative Potentials Leave Only Wheel Tracks and Take Only Video
14
Manufacturability & Sustainability BP Gas Line Rover1/ 27/ 04 Prototype Testbed Mass Production Possible Most Components Modular Will Provide Multiple Non-Modular Components to BP
15
Conclusion BP Gas Line Rover1/ 27/ 04 Provide BP with an up close and personal approach to investigating pipe obstructions. Save time and money. Provide a platform for a future autonomous rover Questions? http://ieee.colorado.edu/capstone/capstone.htm