Project Status The project is progressing well with both grading aspects and building components. The mason has erected many walls to “scaffold high” and starting to take the walls in Gym/Cafeteria wing to bearing height. The steel frame in 2-3 wing is 98% complete and began on the K-1 wing on 10/4/10. Part of Gym/Cafeteria wing steel frame has been started. Slab On Grade in 4-5 wing has been poured and the mason has the interior walls up to scaffold height. The plumber has finished the underground rough-in in K-1 wing and 2-3 wing; the kitchen is the next area for installation. The electrician has continued with rough-in. Project is 26% completed.
3
Aerial Photo taken from Northern Elevation---Picture taken on 9/13/10 Gym Cafeteria 4-5 wing 2-3 wing K-1 wing
4
K-1 Wing Masonry in Fore Ground; 2-3 Wing Steel Frame on Right
5
Picture taken from Church Parking Lot viewing 2-3 wing Steel Frame
6
Slab on Grade poured in 4-5 wing. Steel for 2-3 wing.
7
Givens Street Extension Completed prior to Children returning to School on 8/25/10
8
Project in relation to the existing school; Picture taken from North Elevation