Download presentation
Presentation is loading. Please wait.
Published byScott Chandler Modified over 9 years ago
1
A300225 Bring together all regional Trade Unions in China with IPDPoD - Information Portal Development Platform on Demand Bruce 2004 12 01 ticilo
2
A300225 Background ACFTU created first web-site in internet in 1998(static html) CMS for ACFTU was built in 2001 base-level trade union organizations wanna have their own web-site we try to find a way to use open source software which like zope(application server for building content management systems, portals) to build a new application system. base-level trade union can create their website without a lot of technology, without html skills, easily and quickly.
3
A300225 Structure
4
A300225 Target Groups Target Group : Trade Unions head office Provincial trade unions All the base-level trade union organizations Implementers: Information center of ACFTU Decision-makers: Administration Dept of ACFTU Financiers: Special budget of information center in 2005
5
A300225 Situation and Problems [Problem 1] no succeed experience to apply the same system in a whole country organization [Cause(s) of Problem 1] provincial trade unions and base-level trade union organization has no budget to apply the project. [Problem 2] lack of the information source [Cause(s) of Problem 2] information source in other dept. not in information center. The information center is just a technical support dept.
6
A300225 Long-term Objectives All the provincial trade union join the project and create their web site on this Platform All the information, documents, and other labour movement resource can be found in the system
7
A300225 Immediate Objectives ACFTU has more than 14 independent dynamic web site for different depts, including the main website – www.acftu.org, when the project finished. All these web site will be transferred to the new platform. Some provincial trade union’s web site will be transferred to the new platform. Some provincial trade union without web site will be trained to have a web site.
8
A300225 Activities 1. Analyse the requirement of project 2.Analyse the function of Content Management Framework (CMF) form Zope,decide to use CMF to building content management applications or to modify the code for matching the requirement of project. 2.Database design 3.web design and template design 4.program development(code) 5.test 6. probation 7.fix the bugs 8.training the user 9.buy a new IBM AS400 server to run new system
9
A300225 Inputs [Technical expertise] Software developer project manager DB designer Web designer [Equipment] IBM AS400 PCs printers [Premises] all regional trade unions [Funds] the apply budget in 2005 of this project is confirmed
10
A300225 Indicators of Achievement New CMS is fully functioning. Web sites in existence run normally on the new platform In the next year, at least 5 provincial trade unions create their portal web site use the platform.
11
A300225 Risk Analysis and Risk Management [Risk Factors] knowledge and of XML template, we has no experience on developing with XML speed of JAVA language, the execute speed limited by hardware, and perhaps to effect the efficiency of web creating. [Risk management plan] prepare to training the developer for XML developing update the server with memory and cpu
12
A300225 Preliminary Budget Proposal
13
A300225 THANK U ALL!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.