1
A Best-in-Class Journey
Lab-Wide, ES&H and Quality Integrated Work Controls Don Wesenberg Sandia National Labs Integrated Safety Management Best Practices Workshop September 13, 2006
2
What Is IWP? It is a web-based software tool that ensures:
Hazards are identified and appropriate engineering controls are in place, The required administrative controls (both corporate and line) are followed, The people performing the work are trained to do so, A mechanism exists to formally authorize work, The process is scalable based on risk. Physically, it’s an electronic lab notebook that helps organize & incorporate ES&H into mission work.
3
SNL Sector Layout for the Integrated Work Plan (IWP)
Classification Generic IWP Linking Work Sectors w/Work Classification Heavy Labs Light Labs Field Test Nuclear R&D Construction & Maintenance Design/ Pre-Production
4
ILMS – ISMS (Current Relationship Chart)
Oracle/Financial ISMS/QA PS/HR Emergency Mgt. Environmental Mgt. (SWEIS) Authorization Basis CIS EIS Work Controls? Maint./Cal TEDS SA ILMS – Integrated Laboratory Mgt. System ISM – Integrated Safety Mgt. QA – Quality Assurance SA – Self-assessment EMS – Environmental Mgt. System BBS – Behavior Based Safety Ergo – Ergonomic Evals. SB – Safety Basis PHS/SB EMS ES&H Data Analysis- Tracking/Trending NEPA Line SA ES&H SA Pgm. BBS Existing Function Project in progress Pending Project Ergo Ext. Audits
5
ILMS – ISMS – IWP Relationship Chart
Oracle/Financial ISMS/QA PS/HR Emergency Mgt. Environmental Mgt. (SWEIS) Authorization Basis SA Integrated Work Plan (IWP) XMS/ Web Fileshare Oracle Proj. Mgt PHS/SB CIS/EIS SA (Activity Specific) NEPA TEDS HR Maint./Cal ILMS – Integrated Laboratory Mgt. System ISM – Integrated Safety Mgt. QA – Quality Assurance SA – Self-assessment EMS – Environmental Mgt. System BBS – Behavior Based Safety Ergo – Ergonomic Evals. SB – Safety Basis Line SA BBS ES&H Data Analysis- Tracking/Trending ES&H SA Pgm. Existing Function Project in progress Relationship TBD with WC Pending Project Ergo Ext. Audits
6
ILMS Applies to All Levels of the Organization
Lab Sandia Vision & Highest Goal, MYV, Strategic Plan & 10/5/1s, PEP, PMFs Assurance Issues Management CSat, PMFs Business plans, Strategic planning & 10/5/1s, PEP, LDRD, PMFs ERM Assurance Models & Plans, PMFs Project Plans Work Agreements PMFs SMU’s Policy risks, Program risks Assessments, Corrective Actions PMFs Business Rules, QAP & FOO, ISM & ISSM Lab performs work through SMUs Product/ Service Delivery Divisions Org. Risks PHS/HAD QFDB SMU Mgt System Individuals SMUs perform work through Divisions Divisions perform work through individuals Work processes & stds Training/TEDS QAP/FOO Authorization Basis
7
Deployment of Programs
ILMS ISMS IWP Bench ILMS Divisions ISMS Programs IWP Deployment of Programs to the Bench Divisions perform work through individuals Bench Real Work Individuals
8
IWP Integrates all Elements of ISMS
Plan Work Improve Process Evaluate Hazards Perform Work Implement Controls
9
Integrated Work Flow Process (IWP)
Follows Integrated Safety Management System Plan Work Analyze Hazards Implement Controls Perform Work Improve Process PHS Controls Customer Requirements PHS Selection Work Completed Document & Archive Work Admin Controls: Training TWDs Conduct Work TWDs Activity- Specific Haz? Open IWP N Existing Feedback & Improve. N END New Y Personnel Named & Training Checked Select Template Activity-Specific PHS Req’d Management Oversight Y Basic Information QHE Conducted Management Alerted NEPA Documented Conduct Management Operational Review Contact Information Project Information Authorize Work (TSR) Y Question Set & Permits N Re-evaluate Activities
10
A Best-in-Class Journey
Demonstration