Download presentation
Presentation is loading. Please wait.
Published byWinifred Casey Modified over 9 years ago
1
Timeline and process for the revision of the SEEA Fourth Meeting of the UN Committee of Experts on Environmental-Economic Accounting New York, 24-26 June 2009 United Nations Statistics Division
2
Background Project Management Framework submitted to the UNSC February 2012 – submission of Volume 1 and relevant parts of Vol. 3 to the UNSC February 2013 Vol. 2 and remaining parts of Vol. 3
3
Timeline Timeline is tightTimeline is tight 3 months to draft each chapter and revision of previous chapters3 months to draft each chapter and revision of previous chapters
4
Process ProcessProcess Editor drafts chapterEditor drafts chapter Technical group reviews and commentsTechnical group reviews and comments Revised chapter is submitted for global consultationRevised chapter is submitted for global consultation Chapter is revised againChapter is revised again
5
Technical Group ISWGNA reviewed all chapters before global consultation and assisted the editorISWGNA reviewed all chapters before global consultation and assisted the editor Should a technical group with similar task be established? If yes, 4 options:Should a technical group with similar task be established? If yes, 4 options: Option (a) – London GroupOption (a) – London Group Option (b) – Sub-group of the London GroupOption (b) – Sub-group of the London Group Option (c) – Inter-agency groupOption (c) – Inter-agency group Option (d) – Technical tier of the BureauOption (d) – Technical tier of the Bureau
6
Pro and cons of options OptionProCons London Group Expertise Too large Difficult to get commitment Difficult to manage Subgroup LG Expertise Difficult to get commitment Difficult to manage Inter-agency group Agencies are on board Some agencies have not yet been engaged Bureau – technical tier Direct relation to the Bureau Expertise Need to be given time to review
7
Questions to the UNCEEA Does the UNCEEA agree with the proposed time table? Does the UNCEEA agree with the proposed process for drafting the SEEA? Does the UNCEEA agree with the establishment of a technical group to assist the editor and review draft chapters? If yes, which option: (a) (a)London Group on Environmental Accounting (b) (b)Subgroup of London Group (c) (c)Inter-agency Group (d) (d)Technical tier bureau?
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.