Presentation is loading. Please wait.

Presentation is loading. Please wait.

Integrated project management optimization Orsolya Dobán.

Similar presentations


Presentation on theme: "Integrated project management optimization Orsolya Dobán."— Presentation transcript:

1 Integrated project management optimization Orsolya Dobán

2 Integrated project management optimization Overview New trends in the software development Cost estimation methods –general concept –open questions –possible solutions Optimization Integrated environment

3 Integrated project management optimization New trends in the SW development complexity team work competition on the market –reliability –time limit cost estimation optimization requirements analysis design Implementation testing

4 Integrated project management optimization Model based cost prediction Already finished projects Product Envi- ronment Techno- logy Human capacity Extrapolation Main formula

5 Integrated project management optimization Model based cost prediction Parameters influencing the effort: product platform person project - size - complexity - reliability -progr. language exp. - main storage - execution time - capability - experiment - schedule - SW tools - communication

6 Integrated project management optimization Possible errors in estimation Oversimplified models subjective parametrization insufficient number of representativeness new model - testing - new technology - obsolete model eg. component integration

7 Integrated project management optimization Requirements analysis Open question: –determination of the product parameters size complexity Solution: –automated derivation from the formal model –use case diagram from knowledge base Requirements analysis

8 Integrated project management optimization Design Possible solution versions –formal description automated cost estimation –refined models –refined predictions component integration Requirements analysis Design

9 Integrated project management optimization Change management post-changes –additional effort - additional cost „change propagation” fault propagation Change management Req. anal. Design Implem. Test

10 Integrated project management optimization Optimalization Object: –optimal cost possible solutions (architecture) human resources infrastructure –optimal development time COTS komponents own development –parallel –serial independent from the cost estimator

11 Integrated project management optimization Integrated environment


Download ppt "Integrated project management optimization Orsolya Dobán."

Similar presentations


Ads by Google