THE ALEVO ECOSYSTEM ENERGY STORAGE SUPERCOMPUTING CYBER SECURITY ANALYTICS ECOSYSTEM ANALYTICS ENERGY STORAGE SUPERCOMPUTING CYBER SECURITY FREQUENCY REGULATION.

Similar presentations


Presentation on theme: "THE ALEVO ECOSYSTEM ENERGY STORAGE SUPERCOMPUTING CYBER SECURITY ANALYTICS ECOSYSTEM ANALYTICS ENERGY STORAGE SUPERCOMPUTING CYBER SECURITY FREQUENCY REGULATION."— Presentation transcript:

1 THE ALEVO ECOSYSTEM ENERGY STORAGE SUPERCOMPUTING CYBER SECURITY ANALYTICS ECOSYSTEM ANALYTICS ENERGY STORAGE SUPERCOMPUTING CYBER SECURITY FREQUENCY REGULATION ENERGY MANAGEMENT SYSTEM RENEWABLES INTEGRATION T&D DEFERRALS PEAK SHAVING SPINNING RESERVES VOLTAGE SUPPORT RAMPING SUPPORT REAL TIME DISPATCH OPTIMIZATION POWER MARKET MODELING AND ANALYSIS DISTRIBUTED STORAGE ASSESSMENTS MARINE TRUCK & BUS ENVIRONMENT

2 GridBanks are scalable energy reservoirs that store and deliver grid-scale electricity on demand. 1 MWh of energy / 2 MW power continuously Peak power capabilities of 4 MW No risk of fire or explosion High efficiency / Low internal resistance Low cooling needs / Air cooled The standard configuration is coupled to 2 MW inverter (inverter primary supplier is Parker Hannifin.) 50,000 Cycle Battery 2 MW / 1 MWh GRIDBANK – GRID SCALE ENERGY STORAGE STRICTLY CONFIDENTIAL

3 EnergyAncillarySub-HourlyCapacity Frequency Response/ Regulation Voltage Control Black StartEmissions Permitting & Siting Transient Stability T&D Utilization T&D Deferrals Other Sectors Reliability Public Policy Benefit STRICTLY CONFIDENTIAL GENERATION TRANSMISSION DEMAND / DG DISTRIBUTION

4 USA COMPETITIVE SERVICES COMPETITIVE SERVICES Order 755, “Frequency Regulation Compensation in the Organized Wholesale Power Market,” requires regional transmission organizations (RTOs) and independent system operators (ISOs) to adopt a two-part market-based compensation method for frequency regulation services A capacity payment reflecting opportunity costs A market-based performance payment (This payment rewards faster-ramping resources) Studies run by DNV KEMA illustrated that fast ramping resources have a 3X effectiveness in providing regulation services The graph to the right illustrates the ability of fast ramping resources (bottom right) to follow AGC (Automated Generator Control – 2s signal) while a slow ramping generator unit is unable to accurately follow the ramp signal (top right).

5 National Grid UK – Enhanced Frequency Response Inerta Fading on System Sub-Second Maximum deadband +0.1Hz full output in 1s from the detection of a frequency deviation. availability performance of greater than 95% minimum sustained delivery duration of 9 seconds

6 National Development Network Development Plan 2015 Emerging Technologies Information Paper AEMO’s initial modelling of the impact of battery storage, electric vehicles and fuel switching in the 20- year NEFR outlook period. Modelling battery storage: no mechanism for tracking the number of installations in Australia. AEMO has developed the first step of its economic model to estimate the uptake of battery storage systems by residential consumers

7 Randell Johnson, PhD, P.E. Chief Analyst, Alevo rj@alevo.com


Download ppt "THE ALEVO ECOSYSTEM ENERGY STORAGE SUPERCOMPUTING CYBER SECURITY ANALYTICS ECOSYSTEM ANALYTICS ENERGY STORAGE SUPERCOMPUTING CYBER SECURITY FREQUENCY REGULATION."