1 Industry Communications Event
UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015

2 AGENDA Welcoming Comments Ground Rules Brief Update Q & A
Closing Comments UNCLASSIFIED

3 Ground Rules Submit questions on provided note cards.
The panel of the informal forum will field and attempt to answer submitted questions. Area of focus is services contracting requirements in Enterprise Service Solutions Directorate. This is not designed to provide formal briefings on any acquisition. The Government will not prepare for distribution to attendees any notes or minutes of the event or any lists of attendees/registrants. The event will end at 15:00 or when questions end, whichever comes first. UNCLASSIFIED

4 Enterprise Service Solutions Directorate Director, Debra Scruggs
Division C IT Division Tammi Cochran Division Chief Program Strategies Division Vacant - TBD Division Chief Division A (AMRDEC – All Domains) Shirley Martin Division Chief Division B (Non-AMRDEC – All Domains) Pamela Milton Division Chief

5 EXPRESS Domain Protest Status
Programmatic CoFC protest filed on 25 March 2015 All newly issued BPAs were cancelled. Protest was dismissed on 18 August 2015 Corrective Action will be taken within 3 months A new RFQ will not be issued The current RFQ is not expected to be amended Only offerors who proposed previously will be considered UNCLASSIFIED

6 PROGRAMMATIC DOMAIN SBSA SUSPENSION
A letter was issued October 27, 2015 informing the Programmatic BPA Holders that small business set-asides are being temporarily suspended in the Programmatic Domain. The rationale for this suspension is that since the protest resulted in the termination of the new BPAs, only two small businesses were left in the eligible pool of contractors. While it is true that the “rule of two” applies for making a set-aside determination, FAR 8.4 requires that the ordering activity provide the RFQ to at least three schedule contractors. Therefore, until new small businesses BPAs are added to the Programmatic Domain small business set-asides are suspended. UNCLASSIFIED

7 What’s Going On? EXPRESS FOLLOW-ON/NEXT GENERATION – In acquisition planning phase. IPTs in process for program improvement in the areas of TORFQ process, Evaluation Criteria, and EXPRESS Handbook Realignment Pilot Process Suspended Subcontractors We discontinued tracking subcontractors at the BPA level Allowing flexibility to add/change subcontractors at the TO level UNCLASSIFIED

8 EXPRESSNET REPLACEMENT - EXPRESS Systems Model
UNCLASSIFIED EXPRESSNET REPLACEMENT - EXPRESS Systems Model Overall New Task Order Acquisition Process Customer Requirements Submission Requirements Review Workload Assignment Solicitation Q&A Responses / Quote Submission Evaluations Award Systems VCE AM – Milestone Tracking VCE PCF – Official Record ESSAP NTOR App Manual PADDS GSA eBuy Contractors will not interact with ESSAP Capability Available in November Contractors will have access to GSA eBuy

9 Recap Contractor’s don’t interface or access ESSAP
UNCLASSIFIED Recap Contractor’s don’t interface or access ESSAP TORFQ packages will be ed until GSA eBuy is activated TORFQ questions submitted via Quotes will be submitted through either or hand delivered Administration documentation will be ed to KO, CS, and/or COR for appropriate filing After TO Award, historical data will be posted to the EXPRESS Public Site Sanitized ESSAP data will be posted on the EXPRESS Public Site for industry awareness on a quarterly basis Beginning late November, GSA eBuy will be used to issue RFI’s and RFQ’s to EXPRESS BPA holders and to receive quotes from prospective vendors Short-Term Hand delivery Long-Term GSA eBuy

10 Professional Services Schedule (PSS) Migration
For the most part, GSA has completed the migration of schedules There are a few migrations outstanding for companies with unique situations. EXPRESS BPA Holders: BPA Migration Completed for 4 BPA holders BPA Migrations in Process for 4 BPA holders GSA Migrations are pending for 2 BPA holders Awaiting Submission of 1 BPA holder’s BPA Migration Package Target Date for Completion of In Process Migrations is 16 NOV 2015 UNCLASSIFIED

11 Open Season & Self Assessments
FedBizOps Notice was posted 13 October 2015 Packages are due 17 November 2015 at 2:00 PM CST Reminder: Subcontractors are no longer being tracked Please leave your old schedules on the matrix for tracking Self Assessments Performance Review Reports are due 15 November ( ) Times for Face-to-Face Meetings are currently being scheduled Please review the itinerary for details on the meeting NEWSBLAST will be issued containing additional details UNCLASSIFIED

12 AMRDEC SED Acquisitions
UNCLASSIFIED

13 AMRDEC SED Actions Current SCRS Task Order 0037
Limited Sources Justification was staffed and approved for an extension thru February 20, 2017 SCRS project will phase out with expiration of task order SED Redefined Requirements Three requirements defined along functional lines have been established Virtual Systems Strategic Systems Battlefield Systems UNCLASSIFIED

14 SCRS RE-COMPETE TIMELINE
Awaiting final decisions from Senior Leadership regarding the best procurement approach All three requirements are currently in the Acquisition Planning phase OASIS is still the contract vehicle of choice UNCLASSIFIED

15 AMRDEC SED Virtual, Battlefield, & Strategic Acquisitions
NAICS Code Determination for All Three (3) actions: NAICS – Engineering Services Comprises establishments primarily engaged in applying physical laws and principles of engineering in the design, development, and utilization of machines, materials, instruments, structures, processes, and systems. The assignments undertaken by these establishments may involve any of the following activities: provision of advice, preparation of feasibility studies, preparation of preliminary and final plans and designs, provision of technical services during the construction or installation phase, inspection and evaluation of engineering projects, and related services We will utilize Exception A “Engineering for Military and Aerospace Equipment and Military Weapons” UNCLASSIFIED

16 AMRDEC SED Virtual, Battlefield, & Strategic Acquisitions (cont)
“ANTICIPATED APPROACH” Use of GSA OASIS Contract Vehicle (Pool 3) All Three (3) acquisitions to be competed as unrestricted based upon market research responses UNCLASSIFIED

17 AMRDEC SED Virtual, Battlefield, & Strategic Acquisitions (cont)
The Government anticipates staggered approach There will be opportunity for site visits and briefings by SED Government will publish draft PWS for each action The Government discourages exclusive agreements that will inhibit competition – will likely be included as part of evaluation criteria. UNCLASSIFIED

18 ESS DIVISION A – AMRDEC (ALL DOMAINS)
PROJECTIONS AND STATUS OF RE- COMPETES ESS DIVISION A – AMRDEC (ALL DOMAINS) DIVISION CHIEF – Shirley Martin

19 CCAM-ESA SSEB – KO Detra Battle-Blue
Action Strategy TORFQ: 2015T-3 Engineering and Evaluation Support Services (EESS) formerly BASES Base plus Options (5yrs) Time & Material/Labor Hour (T&M/LH) Small Business Set aside Status Projected Milestones Ready to issue TORFQ Planned Working on D&F for T&M/LH for approval by HCA for a 5 year procurement, customer wants a 5 year Task Order Major events SRB Brief 7/22/15 Grant Clearance approved 8/20/15 Customer informed to start preparing an LSJ for ceiling increase/task order extension 9/10/15 EDA 4th Quarter FY16

20 CCAM-ESA SSEB – KO Detra Battle-Blue
Action Strategy TORFQ: 2014T-21 System and Software Security Engineering (S3E) Base plus Options (5 yrs) Time & Material/Labor Hour (T&M/LH) Small Business Set aside Status Projected Milestones Ready to issue TORFQ Planned Working on D&F for T&M/LH for approval by HCA for a 5 year procurement. Major events SRB Brief 8/26/15 Grant Clearance approved 9/2/15 TORFQ release o/r/a – Feb 2016 Customer informed to start preparing an LSJ for ceiling increase/task order extension 9/10/15 EDA 3rd Quarter FY16

21 CCAM-ESA SSEB – KO Detra Battle-Blue
Action Strategy TORFQ: 2014T-24 Lower Tier IV & V Base plus Options (5 yrs) Time & Material/Labor Hour (T&M/LH) Small Business Set aside Status Projected Milestones In process of re-scheduling SRB Briefing Planned Working on D&F for T&M/LH for approval by HCA for a 5 year procurement. Major events SRB Brief scheduled – week of 16 Nov Customer informed to start preparing an LSJ for ceiling increase/task order extension 9/10/15 TORFQ release o/r/a – Feb 2016 EDA 3rd Quarter FY16

22 CCAM-ESA SSEB – KO Judson Alexander
Action Strategy TORFQ: 2014T-14 Engineering Support for AMRDEC AED NSRW Base plus Options (5 yrs) Time & Material/Labor Hour (T&M/LH) Full & Open Status Projected Milestones Ready to issue TORFQ Planned Working on D&F for T&M/LH for approval by HCA for a 5 year procurement. Must be signed prior to TORFQ release. Customer considering going with a 3 year effort. Major events 11/23/15 Receive legal review of D&F for 5 year T&M effort TORFQ released 1/16

23 CCAM-ESA SSEB – KO Judson Alexander
Action Strategy TORFQ: 2014T-17 Engineering Support for AMRDEC AED MED Base plus Options (5 yrs) Time & Material/Labor Hour (T&M/LH) Small Business Set aside Status Projected Milestones Working on D&F for T&M/LH for approval by HCA for a 5 year procurement Customer is considering a 3 year effort Major events PEER Review comments reconciled 5/12/15 SRB – with COCO 11/15 TORFQ to be released after D&F is signed by HCA

24 CCAM-ESA SSEB – KO Judson Alexander
Action Strategy TORFQ: 2015T-2 System Engineering Support for AMRDEC AED Special Operations Aircraft Division Base plus Options (5 yrs) Time & Material/Labor Hour (T&M/LH) Small Business Set aside Status Projected Milestones Ready to issue TORFQ Planned Working on D&F for T&M/LH for approval by HCA for a 5 year procurement. Customer is considering a 3 year effort. Major events Market Research Report 5/14/15 DD Form 2579 signed by SBA 5/14/15 Still awaiting funding for Base effort 10/6/15 TORFQ cannot be released until the 5 year D&F for T&M is signed by HCA.

25 CCAM-ESS-A SSEB – KO Patricia Vail
Action Strategy TORFQ: 2015T-45 Systems Simulation and Development Directorate (SSDD) Models and Simulation Program Support Base and five options (5 yrs) Contract type: T&M Small Business Set Aside Status Projected Milestones D&F for Time and Materials is being staffed. Award cannot be made until D&F approved by the HCA. 12/09/15 – CRB Award cannot be made until D&F is approved by the HCA. This is currently projected to be January-February 2016.

26 CCAM-ESS-A SSEB – KO Patricia Vail
Action Strategy TORFQ: 2015B-15 System Simulation & Development Directorate (SSDD) Business and Operations Support Base and five options (5 yrs) Contract type: T&M Small Business Set Aside Status Projected Milestones Currently in the evaluation phase. Draft D&F for Time and Materials has been received and is being reviewed by Contracts. After any revisions, it will be staffed for approval by the HCA. 11/18/15 – evaluations complete Award cannot be made until D&F is approved by the HCA. Approval of the D&F is currently projected to be February-March 2016.

27 CCAM-ESS-A SSEB – KO Patricia Vail
Action Strategy TORFQ: 2015T-53 Engineering Support for the Systems Simulation and Development Directorate (SSDD) Live Technologies Branch Base and three options (3 yrs) Contract type: T&M Full and Open Status Projected Milestones TORFQ was released on 13 October The closing date for receipt of proposals is 13 November 2015. The acquisition was revised to three years from five years due to the time required for HCA approval. The D&F for Time and Materials task order is being staffed for PARC approval. 12/30/15 – All Evaluations complete 1/15/16 – CRB Award is projected 4 February 2016.

28 CCAM-ESA SSEB – KO Joe Pollard
Action Strategy TORFQ: 2015T-8 Technical Loop Support for the Engineering Directorate Base and five options (5 yrs) Contract type: Time and Materials/ Labor Hours Full and Open Status Projected Milestones In evaluation process D&F for T&M is being developed and staffed 10/15 – Evaluation process 12/15 – CRB 01/16 – Anticipated signature of D&F from HCA 02/16 – Anticipated award (dependent on HCA approval of D&F as award cannot be made until D&F is signed.

29 CCAM-ESA SSEB – KO Joe Pollard
Action Strategy TORFQ: 2015L-2 Logistics Assistance in Value Engineering (VE) Life Cycle Cost Reduction (LCCR) Tasks for AMCOM Aviation & Missile System Components Base and five options (5 yrs) Contract type: Time and Materials/ Labor Hours Full and Open Status Projected Milestones In evaluation process D&F for T&M is being developed and staffed 10/15 – Evaluation process 12/15 – CRB 01/16 – Anticipated signature of D&F from HCA 02/16 – Anticipated award (dependent on HCA approval of D&F as award cannot be made until D&F is signed.

30 CCAM-ESA SSEB – KO Joe Pollard
Action Strategy TORFQ: 2014T-20 Technical Support for Production/Productability and Systems Engineering Base and five options (5 yrs) Contract type: Time and Materials/ Labor Hours Set Aside for Small Business Concerns Status Projected Milestones In evaluation process D&F for T&M is being developed and staffed 10/15 – Evaluation process 12/15 – CRB 01/16 – Anticipated signature of D&F from HCA 02/16 – Anticipated award (dependent on HCA approval of D&F as award cannot be made until D&F is signed.

31 CCAM-ESA SSEB – KO Joe Pollard
Action Strategy TORFQ: 2015T-14 Energy Storage Device and Sensor Development and Electronic Systems Validation Support for WDI Directorate Base and five options (5 yrs) Contract type: Time and Materials/ Labor Hours Full and Open Status Projected Milestones In evaluation process D&F for T&M is being developed and staffed 9/15 – Evaluation process 12/15 – CRB 01/16 – Anticipated signature of D&F from HCA 02/16 – Anticipated award (dependent on HCA approval of D&F as award cannot be made until D&F is signed.

32 CCAM-ESA SSEB – KO Joe Pollard
Action Strategy TORFQ: 2015T-4 Sensors and Protective Technology Development for Protective Technologies Base and five options (5 yrs) Contract type: Time and Materials/ Labor Hours Set Aside for Small Business Concerns Status Projected Milestones In evaluation process D&F for T&M is being developed and staffed 10/15 – Evaluation process 12/15 – CRB 01/16 – Anticipated signature of D&F from HCA 02/16 – Anticipated award (dependent on HCA approval of D&F as award cannot be made until D&F is signed.

33 CCAM-ESA SSEB – KO Joe Pollard
Action Strategy TORFQ 2014T-15 Technical Assistance in Value Engineering (VE)/Life System Cost Reduction (LCCR) Base and five options (5 yrs) Contract type: Time and Materials/ Labor Hours Full and Open Status Projected Milestones In evaluation process D&F for T&M is being developed and staffed 9/15 – Evaluation process 12/15 – CRB 01/16 – Anticipated signature of D&F from HCA 02/16 – Anticipated award (dependent on HCA approval of D&F as award cannot be made until D&F is signed.

34 CCAM-ESA SSEB – KO Joe Pollard
Action Strategy TORFQ: 2014T-19 Technical Support for Technical Data Management Division Base and five options (5 yrs) Contract type: Time and Materials/ Labor Hours Full and Open Status Projected Milestones In evaluation process D&F for T&M is being developed and staffed 9/15 – Evaluation process 12/15 – CRB 01/16 – Anticipated signature of D&F from HCA 02/16 – Anticipated award (dependent on HCA approval of D&F as award cannot be made until D&F is signed.

35 CCAM-ESA SSEB – KO Joe Pollard
Action Strategy TORFQ: 2014T-18 Technical Assistance in Manufacturing Science and Technology (MST) Tasks for AMCOM Aviation & Missile System Components Base and five options (5 yrs) Contract type: Time and Materials/ Labor Hours Full and Open Status Projected Milestones In evaluation process D&F for T&M is being developed and staffed 10/15 – Evaluation process 12/15 – CRB 01/16 – Anticipated signature of D&F from HCA 02/16 – Anticipated award (dependent on HCA approval of D&F as award cannot be made until D&F is signed.

36 CCAM-ESA SSEB – KO Joe Pollard
Action Strategy TORFQ: 2015T-13 Technical Support in Manufacturing Science and Technology (MST) Obsolescence Tasks for AMCOM Aviation & Missile System Components Base and five options (5 yrs) Contract type: Time and Materials/ Labor Hours Full and Open Status Projected Milestones In evaluation process D&F for T&M is being developed and staffed 09/15 – Evaluation process 12/15 – CRB 01/16 – Anticipated signature of D&F from HCA 02/16 – Anticipated award (dependent on HCA approval of D&F as award cannot be made until D&F is signed.

37 CCAM-ESA SSEB – KO Joe Pollard
Action Strategy TORFQ: 2015T-15 Technical Services for the Aviation and Missile Command Corrosion Program Office Base and five options (5 yrs) Contract type: Time and Materials/ Labor Hours Set aside: Unknown Status Projected Milestones MRA sent to the Specialist on 20 October Awaiting draft MRR to coincide with the results. No Original Milestones Set Major events 10/15 - MRA received 11/15 - Draft MRR needs to coincide with results. 12/15 – Anticipated TORFQ release to industry

38 CCAM-ESA SSEB – KO Joe Pollard
Action Strategy TORFQ: 2015T-16 Technical Services for the Aerospace Materials Function Nondestructive Testing Center of Excellence Aerospace Materials Function, WDI Directorate, AMRDEC Base and five options (5 yrs) Contract type: Time and Materials/ Labor Hours Full and Open Status Projected Milestones In evaluation process D&F for T&M is being developed and staffed 09/15 – Evaluation process 12/15 – CRB 01/16 – Anticipated signature of D&F from HCA 02/16 – Anticipated award (dependent on HCA approval of D&F as award cannot be made until D&F is signed.

39 CCAM-ESA SSEB – KO Joe Pollard
Action Strategy TORFQ: 2015T-17 Technical Assistance in Value Engineering (VE) Workshop and Training Tasks for AMCOM Aviation and Missile Systems Base and five options (5 yrs) Contract type: Time and Materials/ Labor Hours Set Aside for Small Business Concerns Status Projected Milestones No Original Milestones Set Major events 01/16 – Anticipated signature of D&F from HCA 02/16- Release of Final TORFQ for solicitation Final revisions needed before proceeding to the next phase D&F for T&M is being developed and staffed

40 CCAM-ESA SSEB – KO Joe Pollard
Action Strategy TORFQ: 2015P-05 U.S. Army Aviation And Missile Research, Development, And Engineering Center (AMRDEC) Programmatic Support Base and five options (5 yrs) Contract type: Time and Materials/ Labor Hours Set Aside: Unknown as RFI has not been created to determine the interest or capability Status Projected Milestones No Original Milestones Set Major events 11/15 – RFI release to industry 12/15 – CRB 03/16 – Anticipated signature of D&F from HCA 04/16- Release of Final TORFQ for solicitation. Waiting on CRP Creation of RFI needed D&F for T&M is being developed and staffed

41 CCAM-ESA SSEB - KO Ben Henson
Action Strategy Formerly SCRS divided into three new requirements: Battlefield Systems Support, Strategic Systems Support, Virtual Systems Support Proposed - F&O Proposed - GSA OASIS Status Projected Milestones Developing Acq Strategy for each reqmt SAW to be set up for each procurement LSJ will need to be done on existing contracts so that we have time to award these 3 separate contracts EDA 2nd Qty FY17

42 ESS Division B - Non-AMRDEC (All Domains) Projections and Milestones
Division Chief – Pamela Milton

43 Division B SSEB – KO Meredith Taylor
Action Strategy TORFQ: 2015B-1 (2015-Business & Analytical-16) Customer: PEO AVN CH-47 Description: B&A Support to the CH-47 Project Manager Specialist: Kimberly Coggin Contract type: Time & Material/Labor Hour Contract length: Base plus Options (5 yrs) Set-Aside: SB Status Projected Milestones Evaluation Phase Evaluations complete Oct 2015 Task Order Award Nov 2015

44 Division B SSEB – KO Ronald Haws
Action Strategy TORFQ: 2015L-1 (ESSAP 2015-Logistics-26) Customer: PEO AVN Blackhawk Description: Provides Logistics Support to PEO AVN Blackhawk Specialist: Timothy Fugghett Contract type: Time & Material/Labor Hour Contract length: Base plus Options (5 yrs) Set-Aside: SB Status Projected Milestones Evaluation Phase Evaluations complete Dec 2015 Task Order Award Mar 2016

45 Division B SSEB – KO Ronald Haws
Action Strategy TORFQ: 2015L-4 (ESSAP 2015-Logistics-29) Customer: IMMC Description: Logistics Services in support of Product Support Analysis/Performance Based Logistics Specialist: Angela Keaton-Simpson Contract type: Time & Material/Labor Hour Contract length: Base plus Options (5 yrs) Set-Aside: SB Status Projected Milestones Evaluation Phase Evaluations complete Nov 2015 Anticipated Task Order Award Dec 2015

46 Division B SSEB KO – Ronald HAws
Action Strategy TORFQ: 2015L-5 (ESSAP Logistics-30) Customer: LOGSA Description: Process Integration Division – Maintenance, Force and Readiness Logistics Support Services Contract Specialist: Angela Keaton-Simpson Contract type: Time & Material/Labor Hour Contract length: Base plus Options (5 yrs) Set-Aside: SB Status Projected Milestones Evaluations complete Nov 2015 Anticipated Task Order Award Dec 2015 Evaluation Phase

47 Division B SSEB – KO Ronald Haws
Action Strategy TORFQ: 2015L-6 (ESSAP 2015-Logistics-14) Customer: ALC Description: Logistics Critical Safety Items/Life Tracking of the Army Maintenance Management Systems- AVN Contract Specialist: Melissa Jakes Contract type: Time & Material/Labor Hour Contract length: Base plus Options (5 yrs) Set-Aside: SB Status Projected Milestones Acquisition Planning Phase - Awaiting complete CRP D&F for T&M/LH for approval by HCA for a 5 year procurement is required. RFI Issued Sep 2015 Anticipated TORFQ Release Dec 2015

48 Division B SSEB – KO Meredith Taylor
Action Strategy TORFQ: 2015P-2 (2015-Programmatic-11) Customer: PEO AVN NS Description: Provides Programmatic Support to the Non-Standard Rotary Wing Aircraft PMO Contract Specialist: Kimberly Tipton Contract type: Time & Material/Labor Hour Contract length: Base plus Options (5 yrs) Set-Aside: SB Status Projected Milestones Evaluation Phase Evaluation complete Dec 2015 Anticipated Task Order Award Feb 2016

49 Division B SSEB – KO Meredith Taylor
Action Strategy TORFQ: 2015P-3 (ESSAP 2015-Programmatic-13) Customer: AMCOM G-3 Description: Programmatic Support for AMCOM G-3/Operations Contract Specialist: Kimberly Coggin Contract type: Time & Material/Labor Hour Contract length: Base plus options (5 yrs) Set-Aside: Full & Open Status Projected Milestones Acquisition Planning Phase – Awaiting complete CRP D&F for T&M/LH for approval by HCA for a 5 year procurement is required. Anticipated Issuance of RFI Nov 2015 Anticipated TORFQ Release Dec 2015

50 Division B SSEB – KO Meredith Taylor
Action Strategy TORFQ: 2015P-4 (ESSAP 2015-Programmatic-12) Customer: UH-60 PMO Description: Programmatic Support for the Utility Helicopter Project Manager’s Office Contract Specialist: Kristy Landers Contract type: Time & Material/Labor Hour Contract length: Base plus Options (5 yrs) Set-Aside: Full & Open Status Projected Milestones Acquisition Planning Phase – Awaiting complete CRP D&F for T&M/LH for approval by HCA for a 5 year procurement required. Anticipated Issuance of RFI Dec 2015 Anticipated release of TORFQ Jan 2016

51 Division B SSEB – KO Meredith Taylor
Action Strategy TORFQ: 2015P-6 (ESSAP 2015-Programmatic-66) Customer: SAMD Description: Programmatic Support for SAMD Contract Specialist: Michael Nickelson Contract type: Time & Material/Labor Hour Contract length: Base plus Options (5 yrs) Set-Aside: Full & Open Status Projected Milestones Acquisition Planning Phase – Awaiting complete CRP D&F for T&M/LH for approval by HCA for a 5 year procurement is required. Anticipated Issuance of RFI Nov 2015 Anticipated TORFQ Release Dec 2015

52 Division B SSEB – KO Meredith Taylor
Action Strategy TORFQ: TBD Customer: CMDS Description: Programmatic Support Services for the Cruise Missile Defense Systems (CMDS) Project Office Contract Specialist: Michael Nickelson Contract type: Time & Material/Labor Hour Contract length: TBD Set-Aside: Full & Open Status Projected Milestones Acquisition Planning Phase – Awaiting complete CRP D&F for T&M/LH for approval by HCA for a 5 year procurement is required. Anticipated Issuance of RFI Jan 2016 Anticipated TORFQ Release Mar 2016

53 Division B SSEB – KO Meredith Taylor
Action Strategy TORFQ: TBD Customer: LTPO Description: Programmatic Support for the Lower Tier Project Office Contract Specialist: Kimberly Coggin Contract type: Time & Material/Labor Hour Contract length: TBD Set-Aside: Full & Open Status Projected Milestones Acquisition Planning Phase – Initial Stages of CRP D&F for T&M/LH for approval by HCA for a 5 year procurement is required. Anticipated Issuance of RFI TBD Anticipated TORFQ Release TBD

54 Division B SSEB – KO Brenda Tate
Action Strategy TORFQ: 2015T-5 (2015-Technical-5) Customer: UHPO Description: Technical Support Services for UH PMO in support to the UH-60 Fleet Contract Specialist: Timothy Sibley Contract type: Time & Material/Labor Hour Contract length: Base plus Options (5 yrs) Set-Aside: SB Status Projected Milestones Acquisition Planning Phase – Requires SRB D&F for T&M/LH for approval by HCA for a 5 year procurement is required. RFI lssued Aug 2015 Anticipated SRB Dec 2015 Anticipated TORFQ Release Jan 2016

55 Division B SSEB – KO Ronald Haws
Action Strategy TORFQ: 2015T-6 (ESSAP 2015-Techncial-6) Customer: AMCOM G3 Description: Technical Support for ALC Sustainment Optimization and Analysis Contract Specialist: Melissa Jakes Contract type: Time & Material/Labor Hour Contract length: Base plus Options (5 yrs) Set-Aside: TBD Status Projected Milestones Acquisition Planning Phase – Awaiting complete CRP D&F for T&M/LH for approval by HCA for a 5 year procurement is required. Anticipated Issuance of RFI Dec 2015 Anticipated TORFQ Release Jan 2016

56 Division B SSEB – KO Valorie Ritchey
Action Strategy TORFQ: 2015T-7 (ESSAP 2015-Technical-50) Customer: PEO AVN Description: Technical Support for Program Management Office AGSE Contract Specialist: Joaquin Tucker Contract type: Time & Material/Labor Hour Contract length: Base plus Options (5 yrs) Set-Aside: SB Status Projected Milestones Evaluation Phase Evaluation complete Nov 2015 Anticipated Task Order Award Jan 2016

57 Division B SSEB – KO Brenda Tate
Action Strategy TORFQ: 2015T-9 (ESSAP 2015-Technical-8) Customer: PEO AVN Apache Description: Technical Support for the Apache Project Management Office Contract Specialist: Sharon Miller Contract type: Time & Material/Labor Hour Contract length: Base plus Option (5 yrs) Set-Aside: SB Status Projected Milestones Evaluation Phase Evaluation complete Jan 2016 Anticipated Task Order Award Feb 2016

58 Division B SSEB – KO Brenda Tate
Action Strategy TORFQ: 2015T-18 (ESSAP 2015-Technical-62) Customer: PEO MSL Description: General Engineering Support for PFRMS Contract Specialist: Valorie Ritchey Contract type: Time & Material/Labor Hour Contract length: Base plus Options (5 yrs) Set-Aside: SB Status Projected Milestones RFI Issued Nov 2015 Anticipated Date of SRB Dec 2015 Anticipated TORFQ Released Jan 2016 Acquisition Planning Phase – Requires SRB D&F for T&M/LH for approval by HCA for a 5 year procurement is required.

59 Division B SSEB – KO Brenda Tate
Action Strategy TORFQ: 2015T-19 (ESSAP 2015-Technical-61) Customer: PEO AVN Fixed Wing Description: Technical Support for Fixed Wing Project Management Office Contract Specialist: Sharon Miller Contract type: Time & Material/Labor Hour Contract length: Base plus Options (5 yrs) Set-Aside: SB Status Projected Milestones Evaluation Phase Anticipated Completion of Evaluations Jan 2016 Anticipated Task Order Award Mar 2016

60 ESS Division B – OASIS Requirements
UNCLASSIFIED

61 Division B SSEB – KO Sonya Anderson
Action Strategy Solicitation #: W31P4Q-15-T-1004 Customer: CRAM Description: OASIS Requirement providing Technical, Logistics and Program Management Support Services for CRAM System of Systems (SOS) Contract Specialist: Joaquin Tucker Contract type: Cost Plus Contract length: Base plus Option (5 yrs) Set-Aside: SB Pool 1 Status Projected Milestones Acquisition Planning Phase RFI Issued Aug 2015 Anticipated RFP Released Jan 2016 Anticipated Task Order Award Oct 2016

62 Division B SSEB – KO Brenda Tate
Action Strategy Solicitation #: TBD Customer: NSWRA Description: OASIS Requirement providing Technical Non-Standard Rotary Wind Aircraft Program Management Office Contract Specialist: Joaquin Tucker Contract type: TBD Contract length: TBD Set-Aside: TBD Status Projected Milestones Acquisition Planning Phase – Initial Stages of CRP . Anticipated Issuance of RFI Jan 2016 Anticipated RFP Released Feb 2016 Anticipated Date of Award Nov 2016

63 Division B SSEB – KO Valorie Ritchey
Action Strategy Solicitation #: TBD Customer: CMDS Project Office Description: OASIS Requirement providing Logistics Support Services for the Cruise Missile Defense Systems Contract Specialist: Melissa Jakes Contract type: TBD Contract length: TBD Set-Aside: TBD Status Projected Milestones Acquisition Planning Phase – Initial Stages of CRP . Anticipated Issuance of RFI Jan 2016 Anticipated RFP Released Feb 2016 Anticipated Task Order Award Oct 2016

64 DIVISION C – INFORMATION TECHNOLOGY –
PROJECTIONS AND MILESTONES DIVISION CHIEF – TAMMI COCHRAN

65 CCAM-ES-C LOAP II SSEB Action Strategy Status Projected Milestones
LOGSA Oil Analysis Program (LOAP II) Requirement Description: Laboratories that provide maintenance diagnostic programs to monitor lubricant conditions and detect impending component failures for locations throughout the world with CONUS and OCONUS regional locations. Contracting Officer – Brenda Tate Contract type – FFP Set aside – SB Status Projected Milestones Evaluations are complete. Source Selection documents are in process. EDA – 1st Quarter of FY16

66 CCAM-ES-C LITeS II Re-compete
Action Strategy LOGSA Information Technology Support II (LITeS II) Requirement Description: High quality, efficient and effective full range of Information Technology (IT) support and Data Center services. Contracting Officer – Nicholas Haas Contract Specialist – Cassandra Patton Planned Contract type – Hybrid of T&M/FFP/Cost Reimbursable Set aside – No Possible Contract Vehicles – GSA Alliant; CHESS; or Full and Open Competition Status Projected Milestones Current LITeS contract expires 30 November J&A in process to extend the current contract to 2nd or 3rd Quarter of FY17. Re-compete Planning stages – CRP is currently in development. Acquisition Plan/Acquisition Strategy have not been approved at this time. Event 1: ICE LITeS II – November/December 2015, date to be determined Draft Solicitation – 2nd Quarter of FY16 Final Solicitation – 3rd Quarter of FY16 EDA – 2nd or 3rd Quarter of FY17

67 CCAM-ES-C ITSS III Re-compete
Action Strategy AMCOM G6 Information Technology Support Services III (ITSS III) Requirement Description: A full range of IT support services that focus in the areas of IT Services, Enterprise Design/Integration/Consolidation, IT Education/Training, IT Program/Project Management, Systems Operations and Maintenance, Network Support and embedded Information Systems Security and Information Assurance. Contracting Officer – Laquetta Atkins Contract Specialist – Amelia Flournoy Planned Contract type – Hybrid of CPFF/Cost Reimbursable Set aside – No Possible Contract Vehicles – GSA Alliant; CHESS; or Full and Open Competition Status Projected Milestones Current ITSS II contract expires 31 December The contract was extended because the not-to-exceed ceiling had not been breached and was projected to allow performance to continue through 31 December 2016. Re-compete Planning stages – CRP is currently in development. Acquisition Plan/Acquisition Strategy have not been approved at this time. Event 1: ICE ITSS III – TBD Draft Solicitation – 2nd Quarter of FY16 Final Solicitation – 3rd Quarter of FY16 EDA – 1st Quarter of FY17


Download ppt "Industry Communications Event"