Download presentation
Presentation is loading. Please wait.
Published byMilton Gilmore Modified over 9 years ago
1
Check the sizes of all four supports..They keep varying in diameter as well as the height
2
Only one support. That too off- centered.
3
The pillar in perspective. See the next column having two supports.
4
If the previous support was for banking, then this pillar should not have two supports of different heights.
5
The Concrete blocks are not of the same width through the stretch. The single support column under a thinner slab.
6
The pillars differ in sizes from one to the next. This perspective is of the bridge running at the same level (supposed to be) but the pillar sizes differ.
7
Again Single support. Weight distribution is questionable.
8
Banking is wrong! Exact opposite. Yellow is just to indicate the correct tilt/banking. This is the section that’s next to the one that collapsed. (this pic was taken before it was erected – see iron columns)
9
Same section.. Just closer
11
Exactly how it was about two months back!
14
ITS NOT A DISASTER. -- IT’S A BLUNDER CAUSED BY SEVERAL CONTRACTERS, ENGINEERS, BUILDERS, LABOURERS AND NEVER THE LESS… A CONTRACT AGENCY. THE GOVERNMENT OFFICIAL WHO SANCTIONED THEM THE CONTRACT – THE GOVT OFFICIAL WHO EXAMINED THE PROGRESS OF THE FLYOVER REGULARLY. IT MAY BE HUMANE TO ERR. BUT IT IS INHUMAN TO IGNORE THEM REMEMBER FRIENDS – ILLEGAL EXCHANGE OF ONE RUPEE CAN COST TOO MANY LIVES – SAVE INDIA – ITS OURS.