Presentation is loading. Please wait.

Presentation is loading. Please wait.

ECODAM 03/02/201 OD Natural Environment On the St Nicholas’ storm: some results and comments J. Ozer, S. Legrand and V. Duliere ECODAM – 03/02/2014.

Similar presentations


Presentation on theme: "ECODAM 03/02/201 OD Natural Environment On the St Nicholas’ storm: some results and comments J. Ozer, S. Legrand and V. Duliere ECODAM – 03/02/2014."— Presentation transcript:

1 ECODAM 03/02/201 OD Natural Environment On the St Nicholas’ storm: some results and comments J. Ozer, S. Legrand and V. Duliere ECODAM – 03/02/2014

2 ECODAM 03/02/201 OD Natural Environment Structure Evaluation of the risk of flood in Belgium: who’s who The St Nicholas’ storm Operational modelling tool’s at OD Nature Analysis of HW forecast at Ostend Quality assessment of sea surface elevation in the North Sea Lessons and perspectives

3 ECODAM 03/02/201 OD Natural Environment Evaluating the risk of flood in Belgium: Who’s who

4 vv OD Nature v … … … Information flow for calm weather

5 OD Nature if 5,40m < forecast < 5,60m: Heightened vigilance MDK must inform these agencies of a high HW by phone or by SMS

6 OD Nature if 5,60m < forecast < 5,90m: Storm surge alert Telegraaf kantoor informs these agencies of a high HW by phone and by email

7 OD Nature if forecast > 5,90m: Dangerous storm surge alert Telegraaf kantoor informs these agencies of a high HW by phone and by email

8 ECODAM 03/02/201 OD Natural Environment The St Nicholas’ storm

9 ECODAM 03/02/201 OD Natural Environment The St Nicholas’ storm: December 5 th at 00:00 UTC Wind and atmospheric pressure Surge elevation (TW-TO)

10 ECODAM 03/02/201 OD Natural Environment The St Nicholas’ storm: December 5 th at 12:00 UTC Wind and atmospheric pressure Surge elevation (TW-TO) HW

11 ECODAM 03/02/201 OD Natural Environment The St Nicholas’ storm: December 6 th at 00:00 UTC Wind and atmospheric pressure Surge elevation (TW-TO) HW

12 ECODAM 03/02/201 OD Natural Environment CSM NOS BCZ 2D 5’x2.5’ (~6 km) Tide (η, U, V); P a ; W 10 3D 5’x2.5’ (~6 km); 20 layers Tide (η, U, V); P a ; W 10,T a, cloud coverage, rainfall, specific humidity 3D: ~750 m; 10 layers; OB from NOS, surf. as NOS OMNECS ADI Operational modelling tools at OD Nature: OPTOS MDK

13 ECODAM 03/02/201 OD Natural Environment Operational modelling tools: met forcing (Met. Office) OPTOSOPSYS 0.833°x0.556° 6 hours up to t 0 +72; 12 hours after 9 variables; 5 days 1.25° and 6 hours up to t 0 +36 2.50° and 12 hours up to t 0 +96 3 variables

14 ECODAM 03/02/201 OD Natural Environment Analysis of HW forecast at Ostend: Monday evening HW above alarm level (CSM and BCZ) Internal alert to model officers 1953

15 ECODAM 03/02/201 OD Natural Environment Analysis of HW forecast at Ostend: Tuesday 3 models above alarm First contacts with MDK and OMS MDK: 1 st “Gevaarlijk stormtij kust” message by SMS Add Optos_ADI

16 ECODAM 03/02/201 OD Natural Environment ADI GFS of NCEP (US) Grid: 0.25°x0.125°: 3 hourly, 5 days Download (~2 hrs) + pre-processing Analysis of HW forecast at Ostend: Tuesday Grid as for CSM and OMNECS OBC as for OMNECS Multi Model ensemble forecast; 4 runs/day

17 ECODAM 03/02/201 OD Natural Environment Analysis of HW forecast at Ostend: Wednesday 1 st results of ADI; for Wednesday runs, good agreement MDK: 1 st warning; 1 st alarm Release to the public: RMI (warning pictogram); press 21:30 MDK updates its official warning Some hardware problems (ftp; web site): SS informed

18 ECODAM 03/02/201 OD Natural Environment Analysis of HW forecast at Ostend: Thursday Morning runs: HW ↗ SS solves problems from San Diego OD Nature forecast in media 18:45: Please “speed up your forecast” Evening runs: small HW ↘ 19:30: OMS 6.30 +/- 0.20 m Exchange of mails with OMS up to … (quite late)

19 ECODAM 03/02/201 OD Natural Environment Analysis of HW forecast at Oostende: observations 6.33 6.25 6.19

20 ECODAM 03/02/201 OD Natural Environment Analysis of HW forecast at Ostend: Thursday “Whatever happens, we issued a forecast by all scientific and operational standards” (DD [OMS] 05/12 at 21:22).

21 ECODAM 03/02/201 OD Natural Environment Quality assessment of sea surface elevation

22 ECODAM 03/02/201 OD Natural Environment 1.Wick 2.Northshields 3.Sheerness 4.Ostend 5.Hoek van Holland 6.Den Helder 7.Borkum 8.Cuxhaven 9.Husum 10.Esbjerg NOOS exchange of forecast and observations

23 ECODAM 03/02/201 OD Natural Environment

24 ECODAM 03/02/201 OD Natural Environment B-NL coasts NL-DE-DK coastsUK coasts

25 ECODAM 03/02/201 OD Natural Environment Lessons and perspectives An excellent cooperation and data flow between OD Nature – OMS/RMI – MDK Quality of our forecast along UK coastline and in the southern bight of the North Sea  Quality of our forecast in the German Bight Problem with www and FTP servers

26 ECODAM 03/02/201 OD Natural Environment Lessons and perspectives Need to re-invest in storm surge forecasting:  Further calibration of optos models  Access to more meteorological forecast  Up to 4 forecast cycle / day; ensemble forecast Reinforce the link with RMI and MDK  Daniel Gellens is in favor of the creation of a RMI-OD Nature group for marine forecast  Debriefing with David Dehenauw on Wednesday Improve our visibility to the general public  Clarifying of our role in the issue of marine alerts

27 ECODAM 03/02/201 OD Natural Environment St Nicholas’ storm 5 th & 6 th Dec. 2013 W. Bruyns, tweet, 2013/12/05 9:05PM @ Port of Antwerp Dagebuell, Germany, © EPA/CARSTEN REHDER Eroded beaches between Ostend and Bredene, Belgium, © LaLibre


Download ppt "ECODAM 03/02/201 OD Natural Environment On the St Nicholas’ storm: some results and comments J. Ozer, S. Legrand and V. Duliere ECODAM – 03/02/2014."

Similar presentations


Ads by Google