Task 5: High-Tc Superconducting Link Status Update Meeting Eucard - WP7 Collaboration Meeting (video) A. Ballarino, G. Hurte, G. Willering (CERN) M. Tropeano, G. Grasso (Columbus) C. Beduz, Y. Yang (Univ. Southampton) A. Aubele, A. Hallbauer (Bruker HTS) CERN, 7 th October 2011
2
Status Report – Task 7.5 Announcement: welcome to Matteo Tropeano, from Columbus Superconductors, who joined the Task 7.5 in replacement of Simona Berta - who left the company in June 2011.He will be the Columbus representative in the Eucard Government Board Task 7.5 is advancing according to schedule A. Ballarino
3
Status report Task 7.5: Main Achievements Full validation of cable concept completed. Assembly and test at CERN of several 2 m long cables (MgB 2, YBCO and Bi-2223) at 4.2 K and at 77 K both in self-field and in external magnetic field Test station for measurement of cable in He gas in a variable temperature range completed and fully commissioned at Southampton University. Several 2 m long cables (MgB 2, YBCO and Bi-2223) made at CERN were successfully measured at SOTON up to 2200 A between 5 K and 60 K. First quench and stability measurements were performed Assembly at CERN of full-scale 5 m long prototype link made from MgB 2 tape A. Ballarino
4
+ - Status report Task 7.5 Adaptation of the test station at Southampton University for the test of the 5 m long prototype link – integration of the Nexans cryogenic envelope ordered by CERN and delivered to SOTON Completion of the design at CERN of a dedicated cabling machine to be used for the assembly of long lengths of cables. Manufacturing of components completed and first units assembled Construction at CERN of a test station for the test of the 20 m long link at currents of up to 20 kA and in variable temperature range – expected to be commissioned by end 2011 A. Ballarino
5
Coming soon…. Test at SOTON of full-scale 5 m long prototype link delivered by CERN (Nov 2011) Completion at CERN of cabling machine and first assembly of 20 m long prototype link (deliverable of Task 7.5) (Nov 2011) Delivery of 20 m long cryostat for the test of the prototype link (Nov 2011) A. Ballarino