Beamline Readiness Review - Hutch Beamline 12.3.2 Microdiffraction March 28, 2006
2
Floor Plan, Sector 12 25L760C
3
Sector 12 superbend beamlines 12.2.2, 12.3.1 & 12.3.2
4
Hutch Assembly Details
5
Hutch construction drawing from vendor
6
Wall panel construction 2mm sheet lead 1” thick - 4# mineral wool insulation 14 gauge steel Prior to assembly, interior materials have combined thickness of 52.8mm
7
After assembly, the interior components have been compressed to 47.6mm from 52.8mm Wall panel construction
8
Wall panel connection detail
9
Typical Wall Panel with Pb sheet installed
10
Panel with second layer of insulation installed
11
Front wall prior to second layer of insulation Window
12
2 nd front wall panel with opening for 12.3.2 beampipe
13
Typical wall corner with Pb bent along vertical edge
14
Different corner with 2 nd layer of insulation
15
H- channel with Pb captured Pb
16
Pb visible in all of these H-channel units
17
bottom side
18
Pb Framed opening detail – labyrinths, beampipe opening
20
Labyrinth Pb detail prior to insulation Pb in track prior to steel cap
21
Labyrinth detail
22
Labyrinths after Pb shielding applied
23
Labyrinth with detail of how Pb is doubled over
24
Overview of back wall construction
25
1” overlap from Backwall to flashing Roof to back wall connection detail
26
Back wall Pb overlap detail
27
Fastening tabs to secure to structural brace Pb overlap Back wall right side
28
Back wall detail Lead laminated to steel Steel
29
Back wall detail 2 Lead overlap for next panel
30
Roof – Wall panel connection