Project Monitoring & Evaluation Cell CSIR: CIMFR Barwa Road, Dhanbad 2014-15 CIMFR Performance (In terms of ECF)

Similar presentations


Presentation on theme: "Project Monitoring & Evaluation Cell CSIR: CIMFR Barwa Road, Dhanbad 2014-15 CIMFR Performance (In terms of ECF)"— Presentation transcript:

1 Project Monitoring & Evaluation Cell CSIR: CIMFR Barwa Road, Dhanbad 2014-15 CIMFR Performance (In terms of ECF)

2 Status of ECF generated in last 10 years (CIMFR,Dhanbad)

3 External Cash Flow: 2014-15 (Project Category-wise) CSIR-CIMFR,Dhanbad

4 Status of ECF Generated through GAP Projects of CSIR-CIMFR(total) (year:2014-15)

5 Total Project Taken Up:2014-15

6 Department of High ECF generation through Consultancy Projects during 2014-15

7 Highest ECF Generated by Five Departments (Barwa Campus) 2014-15(Rs. in Lakh)

8 Status of ECF Generated through GAP Projects of CIMFR(Barwa Campus) (Year:2014-15)

9 External Cash Flow During 2014-15 (Project Category-wise) Digwadih Campus,CSIR-CIMFR.Dhanbad

10 Department of High ECF generation through Consultancy Projects during 2014-15

11 ParticularCONSULTANCYSPONSORGAPCOLLSIROYALTYTESTINGTotal ADVANCED MINING TECHNOLOGY1628893 BLASTING DIVISION29383854.3120066655000000 36390519.31 BORD & PILLER MINING15099389.59990340 16089729.59 COAL MINING DEPARTMENT586663710578541000000 7924491 DIGWADIH CAMPUS8223814549940276117793717 44998077294970215 ELECTRICAL LAB429822 102000 531822 EMG132407631650001402380 38427 15331571 EXPLOSIVE & EXPLOSION15947165168540 1348320 17464025 EXPLOSIVE DEVELOPMENT26628284467001196800 4306328 FLAME PROOF LAB8502171.88 918933 3667077146091875.88 GEO-MECHANICAL LAB13899308 88585 18624014174133 GEO-MECHANICS4752701 INSTRUMENTATION2089515000015596000 11326215968213 LONGWALL MINING3160520 MATERIALTESTING226605 33708 26538032914116 METALLURGY15442 298133313575 METHANE EMISSION & DEGASIFICATION40601351011244300000 8461259 MINE FIRE4430042 200000 4630042 MINE STOWING FILLING10685570 MINE SUBSIDENCE3731684.13 MINE SYSTEMS ENGINEERING7415123 MINE VENTILATION10901919261800 51180 9652311311422 MINERS SAFETY EQUIPMENTS434364190001 245191869556 NAGPUR UNIT21728392.221023600 3042148842700 26636840.22 RESPIRATORY PROTECTION LABORATORY314608196183000000 663452 6294664627144 ROORKEE11622838 SLOPE STABILITY14312020910848 226911 15449779 STANDARD, TECHNOLOGY MANAGEMENT (ISO) 461389 SUPPORT DEVELOPMENT & TESTING 9500000 337080 178813511625215 THICK SEAM MINING17642320 Grand Total304542211.1588173671577888974590468330297646138987679601617182909.1