1 WATERPOWER LABORATORY
2
2 Built in 1916 Main areas of research and development: –Hydro Turbines Francis Pelton Pump-Turbines –Centrifugal Pumps –Pump and turbine control systems New areas of research and development: –Tidal energy –Wind energy –Wave energy
3
3
4
4
5
5
6
6
7
7
8
8
9
9 Maximum head:100 meter Open system head:1,6 meter Maximum flow:1,0 m 3 /s Maximum power:700 kW The system is designed to operate in both open and closed loop.
10
10 ¤976 power plants ¤Installed capacity: 28.365 MW ¤Production: 120 TWh Norwegian Hydropower Status per 1 st January 2006 SizeNumberTotal Power Annual production [MW][ - ][MW][GWh/år] Micro hydro0 – 0,1164629 Mini hydro0,1 - 119291375 Small hydro1 - 102931.0354.850 Large hydro10 -1002509.25641.419 Large hydro> 1007717.97773.455 Source: Fakta 2006, Energi og vannressurser i Norge, OED
11
11 Installation of a Francis model turbine in the Waterpower Lab.
12
12 Installation of a Francis model turbine in the Waterpower Lab.
13
13 Efficiency of the model turbine Where: h =Hydraulic efficiency[ - ] =Angular velocity[rad/s] T=Torque[Nm] p’= Differential pressure[Pa] Q= Flow rate[m 3 /s]
14
14 Power output 0,3 W