Download presentation
Presentation is loading. Please wait.
Published byGerald Roberts Modified over 9 years ago
1
DOCUMENT SUBMITTED TO: TSSC and TC The document to which this cover statement is attached is submitted to a Formulating Group or sub-element thereof of the Telecommunications Industry Association (TIA) in accordance with the provisions of Sections 6.4.1-6.4.6 inclusive of the TIA Engineering Manual dated March 2005, all of which provisions are hereby incorporated by reference. SOURCE:TIA CONTACT:Bob Jensen Fluke Networks 9015 Mountain Ridge Rd. Austin, TX 78759 Phone: 512-514-7760 Email: robert.jensen@flukenetworks.com TITLE:FO-4 Update PROJECT NUMBER (PN):None DISTRIBUTION:TSSC and TC INTENDED PURPOSE OF DOCUMENT: ___FOR INCORPORATION INTO TIA PUBLICATION ___FOR INFORMATION _X__OTHER (Please describe) _Action________________________________ ABSTRACT: PATENT DISCLOSURE [OPTIONAL] The Source may have patent(s) and/or published pending patent application(s) that may be essential to the practice of all or part of this Contribution as incorporated in a TIA Publication, and the Source is willing to comply with Paragraphs 1, 2(a), or 2(b) of ANNEX H of the TIA Engineering Manual dated March 2005 as to such patent(s) and/or published pending patent application(s). Telecommunications Industry Association (TIA) Conference Call July 25-26, 2007
2
Progress FO-4 continues to make effective and important contributions to optical fiber standards –Cables –Connectors –Systems FTTx –Test criteria Although progress continues, the Engineering Committee is impacted with negative growth
3
Motion Merge FO-4 with TR-42 to take effect in February 2008 at a joint FO-4/TR-42 meeting –FO-4 and TR-42 have successfully had joint meetings since February 2007 resulting in both committees working together –FO-4 has not been able to have an Engineering Chair nominated and willing to take the position since February 2006. Bob Jensen is interim chair
4
FO-4 brings optical fiber expertise to TR-42.8 and its other Subcommittees –Akin to TR-42.7 on copper systems expertise from component to systems to testing Lines of demarcation of long-lines and premises continue to gray Opens up market penetration to FO-4 members (allows focus to premises) Supporting Information
5
Needs Shift June meeting from first week to second week of the month FO-4 participation may only be necessary 2 times a year rather than 3 times a year (February and June)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.