1 Status update presentation #1 for the Cayucos Sustainable Water Project Status update presentation #1 for the Cayucos Sustainable Water Project November 19, 2015

2 Presentation –Phase 1 Overview –Cayucos Sanitary District Wastewater Characterization –Treatment & Regulatory Overview –Funding & Financing Evaluation –Next Steps Slide 2

3 Slide 3

4 Scope – Determine historical and projected flows and constituent loadings for the District’s wastewater Purpose – Select design flowrates and mass loadings Evaluate flow equalization opportunities Determine size of unit processes Key – A Fresh Approach Update Wastewater Characterization Introduction Wastewater Characterization

5 Characterization Approach Wastewater Characterization

6 0.525 mgd 0.325 mgd 0.232 mgd 1.17 mgd Historic Flows Wastewater Characterization

7 Wastewater Characterization Water Quality Analysis

8 Flow Monitoring and Water Quality Sampling Program – Strengthen results of preliminary wastewater characterization – Preliminary data updated after each phase Phase 1: November 2015 – March 2016 Phase 2: April 2016 – June 2016 Phase 3: July 2016 – August 2016 Flow Monitoring – Continuous instantaneous flow monitoring – Flow meters located at manholes upstream of Lift Station 2 and Lift Station 5 Water Quality Sampling – Composite sampling upstream of Lift Station 5 – Minimum of one (1) 7-day sampling event per month – TSS, BOD, COD, Nitrogen, TDS Sampling Plan Wastewater Characterization

9 Characterization Next Steps Wastewater Characterization

10 Treatment and Regulatory Overview — Recycled water beneficial use alternatives — Treatment process overview — Regulatory and permitting requirements — Public outreach and stakeholder support Treatment and Regulatory Overview

11 Recycled Water Beneficial Use Alternatives Treatment and Regulatory Overview

12 Primary Treatment —Includes headworks for large material and grit removal —Followed by primary clarification or settling Treatment and Regulatory Overview

13 Secondary Treatment Treatment and Regulatory Overview

14 Tertiary Treatment Treatment and Regulatory Overview

15 Full Advanced Treatment Treatment and Regulatory Overview

16

17 Potential Outfall Discharge Requirements –California Ocean Plan identifies for brine discharge receiving water limit of 2 ppt above natural background (no greater than 100 meters from discharge point) –Recycled water system brine concentrations are significantly lower than the salinity of seawater and thus should easily comply with this requirement Anticipated NDPES Discharge Requirements 1 ParameterBODTSS Average Monthly (mg/L)30 Average Weekly (mg/L)45 30-Day Average Percent Removal (%) >85% Treatment and Regulatory Overview 1 Morro Bay Cayucos Facilities Master Plan Amendment 2 (MWH 2010), Clean Water Act (133.102)

18 Public Outreach for Beneficial Reuse Community Participation Community Participation Independent Advisory Panel Press and Media Support Newsletters and Factsheets Social Media and Events Public Comment Public Comment Stakeholder Support Treatment and Regulatory Overview

19 Funding & Financing Strategy Identify Available Funding Opportunities Screen for Programs Relevant to Project Prepare Capture Plan Submit Funding Application —Water Recycling Funding Program (WRFP) —Clean Water State Revolving Fund (CWSRF) Grants and Financing —U.S. Bureau of Reclamation WaterSMART Water and Energy Efficiency Grant —U.S. Bureau of Reclamation Title XVI Water Reclamation and Reuse Program —Integrated Regional Water Management (IRWM) Grants —Prop 1 —Water Recycling Funding Program (WRFP) —Clean Water State Revolving Fund (CWSRF) Grants and Financing —U.S. Bureau of Reclamation WaterSMART Water and Energy Efficiency Grant —U.S. Bureau of Reclamation Title XVI Water Reclamation and Reuse Program —Integrated Regional Water Management (IRWM) Grants —Prop 1 Track additional financing and funding opportunities continuously Funding & Financing

20 Funding and Financing Opportunities Funding OpportunityGrant/ Loan Funding AvailabilitySchedule/ Deadlines WRFP Construction Funding Program Grant and low-interest Financing Available grant funds limited to the lesser of 35% of eligible construction costs or $5 million. 20 year financing term at interest rate set to half of the most recent General Obligation (GO) bond rate. Continuous Application Process Clean Water State Revolving Fund (CWSRF) Low-interest financing No funding limit. 20 year financing term at interest rate set to half of the most recent GO bond rate. Continuous Application Process USBR WaterSMART Water and Energy Efficiency Grant Grant Funding Group I: Up to $300,000 (project completed within 2 years) Funding Group II: Up to $1,000,000 (project completed within 3 years) No more than $500,000 in Federal funds provided to one applicant in a given Federal fiscal year. FY 2016 Applications due January 20, 2016 USBR Title XVI Feasibility Studies Grant Funding Group I: Up to $150,000 Funding Group II: Up to $450,000 Maximum Federal cost share of 50% FY 2016 Applications due December 10, 2016 USBR Title XVI Construction and Implementation Lesser of 25% of project costs or $4 million Integrated Regional Water Management Plan Grant Dependent on amount of Prop 84 money available for funding area ($4.94 million remaining for the Central Coast Funding Area). Applications typically due in summer. Funding & Financing *Prop 1 funds anticipated to be available through CWSRF and WRFP programs

21 Sample Capture Plan Funding & Financing

22 Sample Capture Plan Funding & Financing

23 Next Steps

24 Comparative Analysis – Engineering, Environmental and Permitting evaluation of conceptual WRRF locations and beneficial use alternatives

25 Upcoming Presentation December 3 rd BOD Presentation – Water Resource Recovery Facility (WRRF) Siting Evaluation Site Evaluation – Archeological – Biological – Geologic Collection System Re-configuration Alternatives

26 Questions?

27 Wastewater Treatment and Reuse Process Flow Treatment and Regulatory Overview