Presentation is loading. Please wait.

Presentation is loading. Please wait.

Process Mass Intensity (PMI) Calculation

Similar presentations


Presentation on theme: "Process Mass Intensity (PMI) Calculation"— Presentation transcript:

1 Process Mass Intensity (PMI) Calculation
Includes all materials used in synthesis (i.e Reagents, solvents water, etc)

2 2-Benzenesulfonyl Pyridine Synthesis
Original Procedure: 2 equivalents thiophenol- refuxing temps; Hazards Assoc with MMPP addition (5 min refluxing DMF); Large quantities of waste generated from MMPP, oxidation can stall at sulfoxide. PMI = 75 kg/kg product Fully Developed: Tandem SNAr / oxidation Sequence to produce 2-phenyl sulfonyl pyridines* Atom economy: Use of 2-chloro pyridine Green Chemical Oxidation: “swimming pool chlorine” replaces MMPP PMI = 25/kg/kg product Cost Savings / New Process = $100 / Kg * Trankle, W. G. and Kopach, M. E. Org. Process Res. Dev , 5, 913.

3 LILLY ELN Green Sheet


Download ppt "Process Mass Intensity (PMI) Calculation"

Similar presentations


Ads by Google