Download presentation
Presentation is loading. Please wait.
Published bySusan Gordon Modified over 9 years ago
1
TAS workshop 30-31/3/2004 Aspects of recoil-ion - correlations in atomic traps A reminder why (V-A, ?S + ?T) Energy scales basic setup RIMS Precision what to watch out for (LBL). + versus - RIMS issues Preliminary setup
2
TAS workshop 30-31/3/2004 Motivation Standard Model decay duddud duuduu :pnpn:pnpn :pnpp:pnpp neutrino electron W±W± V - A (V + S) – (A + T) If not SM Measure - correlations
3
TAS workshop 30-31/3/2004 Correlations in -decay R and D test both TRV D most potential R scalar and tensor (EDM, a) Learn the trade with “a”: ignore spin degrees of freedom
4
V 0 (keV) Principle idea MOT + RIMS MeV detector MCP -V 0 +V 0 0 SM Not SM TOF E // very efficient X,Y E for charged recoils start stop
5
TAS workshop 30-31/3/2004 Learn from other experiments TRIUMF: 38 K m (0 + 0 + ) a F =0.992(8)(5) promised:?(3)(3) LBL: 21 Na (3 + /2 3 + /2) a= 0.524±0.005 syst systematic error: 1.RIMS related 41% 2.Unwanted decays (off walls etc.) 26% 3.Beta detection 24% “work on RIMS”
6
TAS workshop 30-31/3/2004 + versus - + decay recoil neutral (80%) 21 Na (11p + 10n) 21 Ne (10p + 11n) + + 80% 19% 3% 0.3% - decay recoil 1 + : 80% no good case (?) 25 Na (11p + 14n) 25 Mg (12p + 13n) + - Neutrals not efficient MCP inefficient and tricky + momentum q-dist 2 background (511 keV)
7
TAS workshop 30-31/3/2004 RIMS scaled to -decay Atomic physics –recoil eV-meV fields V/cm -decay –recoil 0.1 keV fields kV/cm – -energy >> keV MeV MCP -V+V0 start stop TOF E // TOF + r E TOF Origin Affects “a” strongly z r -V recoil da
8
TAS workshop 30-31/3/2004 Time scales and accuracy Resolution 1ns 2a = 10 cm qV 5 kV 1 eV Range > 400 ns (q=1) Dynamic range > 4 s r < 4 cm Time focus d=2a Position focus? Pileup? ……….??
9
Two realizations Setup at TRIUMF (Behr et al.) for 38m K (t 1/2 =0.93 s; 0 + 0 + ) 21 Na production Cooling stage Trapping & detection Freedman/Vetter setup LBL 21 Na
10
TAS workshop 30-31/3/2004 Conclusions Would have preferred - emitter (background) RIMS is the trickiest part Need TOF+2D readout MCP (+ multi hit) Want 2D + energy of Simulations needed (position and time focus) Separate production from trapping (background) Start working …..
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.