Presentation is loading. Please wait.

Presentation is loading. Please wait.

Frimley Lodge Park Towpath Works Undertaken by the Surrey and Hampshire Canal Society Feb – Nov 2012.

Similar presentations


Presentation on theme: "Frimley Lodge Park Towpath Works Undertaken by the Surrey and Hampshire Canal Society Feb – Nov 2012."— Presentation transcript:

1 Frimley Lodge Park Towpath Works Undertaken by the Surrey and Hampshire Canal Society Feb – Nov 2012

2 Location of works Canal Centre Model Railway Club Frimley Lodge Park New 40m landing stage Bank protection and paving of towpath Existing landing stage refurbished 100m GUILDFORD ROAD One of the most popular sections of the Canal with the general public

3 Work undertaken Installation of fabric on posts (“soft”) bank protection, and widening of the towpath

4 Work undertaken Construction of new sheet- piled landing stage near Guildford Road bridge

5 Work undertaken Refurbishment of existing landing stage (near model railway club), including installation of bollards

6 Work undertaken Paving of entire length (about 400m) with hard-wearing roadstone

7 Work undertaken Donation and installation of hard-wood seat near the new landing stage

8 £25K funded from Steljes environmental fine (administered by SHBC) Costs

9 330 man days by the Canal Society, equivalent to £27K value in kind, plus around £1K in cash donation

10 However, please note… A long section of towpath down to the Canal Centre still needs repair…


Download ppt "Frimley Lodge Park Towpath Works Undertaken by the Surrey and Hampshire Canal Society Feb – Nov 2012."

Similar presentations


Ads by Google