Download presentation
Presentation is loading. Please wait.
Published byHelen Jenkins Modified over 9 years ago
1
AIM Timelines, Tools, and Support
2
AIM Roles and Responsibilities Policy, Program, and WO Budget—Gordon Toevs Implementation—National Operations Center (Emily Kachergis, terrestrial lead and Scott Miller, aquatics lead) Training, Study Design—ARS Jornada, USU/NAMC (Jason Karl and Sarah McCord, Scott Miller) State Program, Budget, Coordination—State AIM Leads Office Project Coordination and Budget—Project Leads
3
AIM Project Contacts Planning and Funding Design Baili Foster bfoster@blm.gov 303-236-7342 Project Evaluation Analysis and Reporting Emily Kachergis ekachergis@blm.gov 303-236-0071 Data Collection and QA QC and Ingestion Sarah Burnett sburnett@blm.gov 303-236-2716
4
AIM Project Design Worksheet and Process Model
5
BLM National Operations Center Enterprise database Monitoring Manual and Technical References Data capture and storage with DIMA/SARAH and TerrADat/AquADat Master sample AIM landscape toolbox website Webinars and calls QA/QC protocols and documentation Benchmark (threshold) determination tools – O/E type models for aquatics Geocortex reporting tools R-Shiny tool statistical analysis And more underway!!! AIM Tools Available
7
Quality Assurance (done throughout the year at all levels) Level 2: State QC Field Crew QA Level 1: Crew Lead/Field Office/District Office QC DIMA/SARAH finalization QC and dataset merge Training / calibration Calibration Pre-season DIMA/SARAH preparation Level 3: National Operations Center QC Mid-season check-in 2 Share previous year’s data with FOs QC and SQL ingestion (data is “locked”) Jan FebMarchApril MayJuneJulyAug SeptOctNovDec FebMarchApril MayJuneJulyAug SeptOctNovDec Jan Periodic DIMA/SARAH checks 1 Mid-season check-in 2 Calibration *Determine exact timing by subtracting crew training time from desired monitoring start date 1 Periodic DIMA checks should be done every few weeks once data collection has started (more frequent at the start of data collection to catch errors). 2 Mid-season check-ins should be done about 4 weeks after data collection has started.
8
FebMarchApril JuneJulyAug SeptOctNovDec Jan NOC State Office Field Office Field Crew Sample Design Plots Strata Study area Project design worksheet Field Data DIMA/SARAH Photos Sample Design DB Field season summary TerrADat/AquADat/ HAF Early DIMA/SARAH TrainingData Collection & QAQC Office Plot Evaluation QC Data Use Data Calibration data May
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.