REPUBLIC OF MACEDONIA STATUS REPORT ON MEETING THE COMMITMENTS OF THE ATHENS MOU SEEERF IV PERMANENT HIGH LEVEL GROUP MEETING Athens, Greece September.

Similar presentations


Presentation on theme: "REPUBLIC OF MACEDONIA STATUS REPORT ON MEETING THE COMMITMENTS OF THE ATHENS MOU SEEERF IV PERMANENT HIGH LEVEL GROUP MEETING Athens, Greece September."— Presentation transcript:

1 REPUBLIC OF MACEDONIA STATUS REPORT ON MEETING THE COMMITMENTS OF THE ATHENS MOU SEEERF IV PERMANENT HIGH LEVEL GROUP MEETING Athens, Greece September 9, 2003

2 Institutions for energy policy, regulation and system operation National Energy Authority  Operates as a department within the Ministry of Economy; Reforms:  State Energy Agency in course of establishment (January 2004) - responsible for professional technical support on data management, strategy analysis, policy and project assessment and implementation coordination  Formal determination of the State Energy Authority within the new Energy Law and Amendments on the Law on State Administration

3 Energy Regulatory Commission  Established in June 2003 (Energy Law)  5 Commissioners nominated by the Parliament Assembly in July 2003 Engagements:  Establishment of tariff systems and prices  Authorization procedures (licenses for generation, distribution, supply and eventually other services within the energy industry)  Development / verification of Grid Codes and Market Codes  Dispute settlement and customer protection Institutions for energy policy, regulation and system operation

4 Energy Regulatory Commission Developments:  Logistics consolidation and staffing;  An EAR technical support project is under way aimed for providing technology transfer, training and drafting of basic acts, rules and templates.  Independent financing (2004, 2005). Institutions for energy policy, regulation and system operation

5 TSO/MO/DSO  Initial market structure (model) foresees a separated (independent) state-owned Transmission Service Provider (TSO/MO).  Initially DSO stays (regulated) within an integrated distribution and supply function. Next step is separation of independent DSO(s). Terms:  The market infrastructure shall be extracted from the existing integrated utility (ESM) among the first step within the ongoing process of ESM transformation. TSO/MO should be operative in the first half of 2004. Institutions for energy policy, regulation and system operation

6 National & Regional market Unbundling of Account, Independent Audit and Corruption Abatement  Depending on the ESM Restructuring Model and implementation plan the appropriate financial unbundling should be implemented in the first half of 2004.  Audits reform to be introduced regarding International Accounting Standard methodology implementation – according to the Plan.  Independent Corruption Abatement Commission operates within the state administration. Additional measures and criteria will stem from the judicial system reforms.

7 National & Regional market Unbundled Transmission Tariffs  ESM accounting unbundling model (Generation, Distribution, Transmission). Transmission provider to be financed independently. Tariff Reform  Tariff methodology study is under way (until November 2003). The tariff model basically proposes a rate-of-return approach along with a long-term marginal cost revenue allocation. This should enable the Regulator to implement unbundled tariff system for each function.  Terms – planned for the first half of 2004.

8 National & Regional market Action plan  Task Force set up within Ministry of economy to develop an Action Plan for establishment of internal liberalized electricity market – benchmarking reports.  Main sources for terms and criteria: Athens MoU, EU Electricity Directive, current Studies on the internal market model, tariff methodology and affordability, and ESM restructuring  First priorities – Regulatory Commission, Independent TSO, Legislation and Regulations to be redefined or developed, Tariff System. Next/other steps to be analyzed and planned for one year periods.  First draft – implementation – main concerns and risks.

9 National & Regional market Thank you for your attention