Public Works Department Hot In Place Bituminous Pavement Recycling August, 2011.

Similar presentations


Presentation on theme: "Public Works Department Hot In Place Bituminous Pavement Recycling August, 2011."— Presentation transcript:

1 Public Works Department Hot In Place Bituminous Pavement Recycling August, 2011

2 HISTORY n We Maintain 2729 Miles of Roadways n Roadways added annually 20-25 Miles n Roadways using Hot In Place Recycling 20-45 Miles Annually

3 Hot In Place Recycling Process n Heating of existing asphalt n Scarifying the heated pavement to 1” depth n Add recycling agent to restore viscosity n Laying of recycled asphalt n Apply additional 1.5” depth of asphalt

4 Hot In Place Recycling Video

5 Hot In Place Recycling Process Advantages: n Expedited process n Ideal for busy roads n Less disturbance to daily traffic n 15% to 20% less expensive than mill and overlay method n Provides equal or better pavement structural stability

6 Roads To Be Completed Under This Contract Total: 20 Miles

7 Contract IFB # Y11-1039-J2 n Past contract expired on October 25, 2010. n Contract was issued on October 7, 2010. Two bids were received. n In December 28, 2010, contract was cancelled due to protest n Contract was re-issued on March 24, 2011 with modifications n Six addendums were issued

8 Contract IFB # Y11-1039-J2 n Two bids were received: Cutler Paving HIP Paving LLC - Unresponsive No bid bond submitted n Purchasing queried potential bidders who failed to bid, received following responses: Not in Hot In Place Recycling business Competes with core paving operation Unwilling to be prime for sub-contractors Unable to acquire bond

9 n Pavement of these roads are deteriorating and require immediate repairs n Further delay would compromise pavement structural stability n This contract provides cost savings to the County n We have tried our best to make this contract fair and competitive Contract IFB # Y11-1039-J2 Need

10 Action Requested nApproval to award Invitation for Bids Y11-1039-J2, Term Contract for Hot In Place Asphalt Recycling, to the low responsive and responsible bidder, Cutler Repaving, Inc. The estimated contract amount is $3,590,200 for a 1- year term.

11 Public Works Department Hot In Place Bituminous Pavement Recycling August, 2011