Presentation is loading. Please wait.

Presentation is loading. Please wait.

WP5D Meeting Results 2008-10 Seoul. 2 IMT-Advanced Summary  IMT.EVAL Completed  Describes the methodology for evaluating IMT Advanced  Contained in.

Similar presentations


Presentation on theme: "WP5D Meeting Results 2008-10 Seoul. 2 IMT-Advanced Summary  IMT.EVAL Completed  Describes the methodology for evaluating IMT Advanced  Contained in."— Presentation transcript:

1 WP5D Meeting Results 2008-10 Seoul

2 2 IMT-Advanced Summary  IMT.EVAL Completed  Describes the methodology for evaluating IMT Advanced  Contained in document IMT.EVAL  Technology Description Template Completed  Describes the characteristics of the candidate Radio Interface Technology (RIT) or Set of RIT (SRIT)  Information to be provided by the candidate RIT or SRIT for each test environment  Link Budget template attached to the TDT  All documents now complete within WP5D for IMT Advanced  Documents available on the IMT Advanced web site  http://www.itu.int/ITU-R/index.asp?category=study-groups&rlink=rsg5-imt-advanced&lang=en  IMT Advanced schedule remains the same

3 3 IMT.REST “ Requirements, Evaluation criteria, and Submission Templates ”  Contains Requirements for Services, Spectrum and Technical performance  Contains Evaluation Criteria and Methodology  Contains submission guidelines and Templates  Each candidate technology must fill out a Description Template  Each candidate technology must fill out a Compliance Template for Services, Spectrum and Technical Performance

4 4 Schedule for IMT-Advanced

5 5 M.1457 Revision 9  All 6 IMT-2000 technology Radio Interfaces submitted their intention to update to Revision 9  Both IMT-2000 CDMA MC and OFDMA TDD WMAN submitted updates that included an FDD and TDD component  Submitted as updates to existing radio interface and not as new radio interfaces  France and Germany still in opposition to having a TDD and FDD component in the same radio interface  No decision as yet in WP5D whether a TDD and FDD update will be allowed for CDMA-MC and OFDMA TDD WMAN  Precedence in that TDMA SC currently contains both an FDD and TDD component  Next WP5D meeting (Feb 2009) is the official deadline for submitting final material for Rev 9  Deadline could possibly be extended because SG5 does not meet until Nov 2009  If no agreement at the next meeting whether the two radio interfaces can be submitted as updates, then there will be uncertainty as to the status of Revision 9  Rev 9 may not be approved in WP5D  Rev 9 could be approved minus the two radio interfaces but this could create issues in SG5  May be best for CDMA-MC and OFDMA TDD WMAN to continue with their FDD and TDD updates

6 6 M.1580/1581 – Emission Requirements for IMT-2000  It was agreed that M.1580and M.1581 would be finalized at the next WP5D meeting in February 2009  Contributions for updates to M.1580/1 were received from 3GPP, 3GPP2 and WF  Updates were included into the working document  ACLR Information to be included for all technologies  For consistency ACLR information will be requested for all IMT-2000 technologies  Liaison will be sent to external organizations requesting ACLR information  Both intra-system and, where available, inter-system ACLR values requested  Request for user definition of ACLR as well as assumptions used in deriving these values  Information to be provided by the next meeting of WP5D in February 2009  Test Tolerances for all M.1580 & M.1581 parameters  Test Tolerances requested for all parameters included in M.1580 and M.1581

7 7 PARAMETERS OF IMT RADIO INTERFACE TECHNOLOGIES FOLLOWING WRC-07  3GPP2, 3GPP and WiMAX Forum submitted inputs based on the request from WP5D for Radio Interface parameters  WP5D has compiled this information and re-sent it to the external organizations requesting confirmation  3GPP2 needs to confirm the information and send a reply to WP5D

8 8 Actions for 3GPP2 at Hawaii Meeting  M.1457 Update  Final material to WP5D for update of M.1457-9 – Action: ITU Ad-Hoc  Reminder memo to OPs on M.1457-9  Update Roadmap  M.1580/1581  Include ACLR information for M.1580 and M.1581 – Action: WG3  Include user definition of ACLR as well as assumptions used in deriving these values  Include Test Tolerances for any parameters provided in M.1580/1  Radio Interface Parameters  Confirm that Radio Interface Parameters compiled by WP5D are correct – Action: WG3


Download ppt "WP5D Meeting Results 2008-10 Seoul. 2 IMT-Advanced Summary  IMT.EVAL Completed  Describes the methodology for evaluating IMT Advanced  Contained in."

Similar presentations


Ads by Google