All Exp Mtg July 7, 2008 NuMI-MINOS Status Report – Laura Loiacono FAR DETECTOR: FD live time was 95.7% for cosmics last week (ROP7 problems reported at.

Similar presentations


Presentation on theme: "All Exp Mtg July 7, 2008 NuMI-MINOS Status Report – Laura Loiacono FAR DETECTOR: FD live time was 95.7% for cosmics last week (ROP7 problems reported at."— Presentation transcript:

1 All Exp Mtg July 7, 2008 NuMI-MINOS Status Report – Laura Loiacono FAR DETECTOR: FD live time was 95.7% for cosmics last week (ROP7 problems reported at last week's meeting spilled downtime into this week's report). Dynode threshold calibration also contributed to downtime. All rack filter maintenance completed. NEAR DETECTOR: PMT replaced, light leak tracked down and taped up. PMT expert is here this week to help track down the last subtle issues before beam arrives. NuMI Horn 1 Replacement Status: Horn 1 is all hooked up and ready to run. Last week Thursday, performed the horn alignment beam scan.

2 All Exp Mtg July 7, 2008 NuMI-MINOS Status Report – Laura Loiacono Sweep proton beam across horns. Measure position of proton beam with beam position monitors and secondary emission monitors upstream of the target. Use measurements to extrapolate the beam position at the location of the horns. Target Horn 1 Baffle BPM x BPM y Profile BPM x BPM y Profile 334.2 334.4 334.9 346.6 346.9 347.4 356.1 357.0 357.7 359.8 Horn 2 366.4 369.4 Hadron Monitor 1077 Toroid Crosshair Drift space Target and Baffle out

3 All Exp Mtg July 7, 2008 NuMI-MINOS Status Report – Laura Loiacono 3 Sweap primary proton beam across alignment bars  Target must be out  One on the downstream end of Horn 1  One on each end of Horn 2 Also steer beam into horn 1 aperature Two ion chambers measure particle spray  One downstream of each horn

4 All Exp Mtg July 7, 2008 NuMI-MINOS Status Report – Laura Loiacono 4 1 mm thickness 2.5 mm separation 3.5 mm Nub Horn 1 Neck 18 mm Horn 2 Horn 1 Horizontal Position of Proton Beam (mm) X-Center (mm)X-Angle (mrad) Horn 1-0.79 +/- 0.3-0.2 +/- 0.2 Horn 2-1.74 +/- 1.0-0.3 +/- 0.4 Y-Center (mm)Y-Angle (mrad) Horn 10.62 +/- 0.30.23 +/- 0.2 Horn 2-0.19 +/- 1.0-0.09 +/- 0.4 Preliminary Proton beam intercepting the Alignment bar Proton beam intercepting horn aperature

5 All Exp Mtg July 7, 2008 NuMI-MINOS Status Report – Laura Loiacono Schedule for this Week: Monday: Target module back into chase, hook up z-drive motor cable, hook up water to target, helium lines and electrical, reinstall upstream shielding. Tuesday: Target module top fiducial survey using laser tracker (am). Advance target into horn LE10 position remotely via ACNET while monitoring position with crane camera. Wednesday: Install Target T-Blocks and survey plugs. Install R-block installation. Complete air seal/vapor barrier on shielding plug. Start Target Hall clean up. Thursday: general removal of all equipment, remove workcell hydraulics and secure workcell. Leak check for air leaks on target chase. Search & Secure and run Beam by early evening and align target with proton beam.