Download presentation
Presentation is loading. Please wait.
Published bySheila Richards Modified over 9 years ago
1
December 22, 2015 EL-TEC Mulej, d.o.o.1 Local, efficient, clean Damjan Mulej Heating without global warming, Euroheat &Power Conference, Brussels, 5 June 2008
2
December 22, 2015 EL-TEC Mulej, d.o.o.2 Content 1.Presentation of the El-tec Mulej company 2.Energy management and our activities 3.Project samples 4.Conclusions
3
December 22, 2015 EL-TEC Mulej, d.o.o.3 We contribute to lowering energy consumption and help to preserve the environment. Mission and slogan energy of the green future
4
December 22, 2015 EL-TEC Mulej, d.o.o.4 To become the leading provider of integrated solutions in the South-East Europe in the fields of: district heating systems; water supply systems; efficient lighting; energy management. Our vision
5
December 22, 2015 EL-TEC Mulej, d.o.o.5 Business information: Revenues: € 7 million Employees: 43 Four daughter companies: in SLO: Protena in Serbia: El-tec Mulej Niš in Croatia: Energoglobal in BiH: El-tec Mulej BH Places of operation Places of business operation Slovenia, Serbia, Bosnia and Herzegovina, Croatia,
6
December 22, 2015 EL-TEC Mulej, d.o.o.6 Energy management objectives EM stands for a continuous optimization of energy and water consumption, which can be achieved by: Optimal planning and choice of energy equipment Professional installation Maintenance Control and supervision of results EM objectives: Reducing costs / reducing energy (water) consumption Reducing the harmful effects to the environment
7
PROJECT OF ENERGY PERFORMANCE CONTRACTING
8
December 22, 2015 EL-TEC Mulej, d.o.o.8 Project MO Kranj Municipality of Kranj, 53,000 inhabitants ; Public tender in 2001 for a group of 14 buildings; Help of state institutions (tender, agreement…); The contract was signed in October 2001
9
December 22, 2015 EL-TEC Mulej, d.o.o.9 Basic agreement MAIN SERVICE OF THE CONTRACTOR – guaranteed savings Reference period: 1 Januar 1999 to 31 December 1999 Date of implementing the main service: 1 September 2002 Termination of agreement: 31 August 2017 Financing from the contractor: repayments dependant on the achieved savings The measures in the first year only on nine objects
10
December 22, 2015 EL-TEC Mulej, d.o.o.10 Basic measures Replacing worn-out heating equipment (boilers, pumps,…); Isolation on installations; Modernization or implementation of regulation for internal central heating installations; Hydraulic balancing; Implementing remote control; Modernizing lighting.
11
December 22, 2015 EL-TEC Mulej, d.o.o.11 Basic agreement Energy consumption cost basis: Heating: € 319,745 Electricity: € 187,032 TOTAL € 506,777 Ensured savings: Heating: € 48,393 Electricity: € 9,120 TOTAL: € 57,513
12
December 22, 2015 EL-TEC Mulej, d.o.o.12 Savings from 15% to 50%; The biggest savings were achieved in the 2006/2007 period, when the value of the DD achieved only 72% of reference value; Features of past financial periods
13
December 22, 2015 EL-TEC Mulej, d.o.o.13 Results
14
OLYMPIC SWIMMING POOL
15
Olympic swimming pool
16
Total investment 780.000 € Costs for energy – baseline 260.700 € Guaranteed savings 102.970 € Contract period 10 years
17
INDUSTRY LIGHTING - STEEL INDUSTRY ACRONI
19
Industry ligtning 4 objects Total investment 2.420.000 € Reductions 52% on conected power 54% on electricity consumption Contract period 5 years
20
Industry ligtning BeforeNow Electricity consumption 16.977 MWh/year7.756 MWh/year Conected power2069 kW975 kW
21
December 22, 2015 EL-TEC Mulej, d.o.o.21 Conclusions Good practice examples are a good encouragement for others and also for us (other projects); Act local, reduce global warming
22
December 22, 2015 EL-TEC Mulej, d.o.o.22EL-TEC Mulej, d.o.o.22 www.el-tec-mulej.com
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.