Download presentation
Presentation is loading. Please wait.
Published byErick Barrie Black Modified over 9 years ago
1
Connecticut-Delaware-District of Columbia-Maine Maryland-Massachusetts-New Hampshire-Vermont New Jersey-New York-Pennsylvania-Rhode Island Region 1
2
Jim Fallon, CT Steve Pepin, MA Glenn Roberts, NH Mike Bonini, PA “Don’t let the door hit you on the way out.”
3
Connecticut ◦ Bradley J. Overturf, Transportation Supervising Planner ◦ Michael Connors, Transportation Assistant Planning Director Maryland ◦ Ms. Hua Xiang, Assistant Research Division Chief Massachusetts ◦ Steve Woelfel, Director of Strategic Planning New Hampshire ◦ Beth Klemann, Assistant Research Engineer Pennsylvania ◦ Andrea Bahoric, Planning Division Manager New Members
4
Connecticut Department of Transportation ◦ Completed centralization of all Research/Implementation functions into Policy and Planning ◦ Closed out 13 research studies ◦ Funded three (3) new studies New Jersey Department of Transportation ◦ Updating Process/Procedures post 2CFR 200 ◦ Completed 17 research studies ◦ Conducted 16 th Annual Research Showcase ◦ Participated in FHWA process review ◦ Developing pre-award and post-award Risk Assessment forms ◦ Preparing to complete LTAP request for proposal
5
District Department of Transportation ◦ Two (2) new staff members ◦ Two (2) dedicated funds for research implementation ◦ New contract with our university partner ◦ Completed 5 research projects ◦ Lead on a large on-the-ground parking pilot project in the city center ◦ Assisted with Agency Initiatives: Age-Friendly DC Stewardship and Oversight Agreement Every Day Counts
6
Maine Department of Transportation ◦ Doubled their staff ◦ Recipient of FHWA award programs Maryland State Highway Administration ◦ Completed their first competitive request for proposals process New Hampshire Department of Transportation ◦ Completed 7 of the 2013 selected research studies ◦ Recipient of FHWA award programs
7
Massachusetts Department of Transportation ◦ Successful delivery of two (2) Technology and Information Transfer Conferences Moving Together 2014 2015 Innovation Conference ◦ Facilitated key milestone deliveries for the two (2) RWIS technologies for testing and comparison ◦ Peer Exchange on November 2014 Key take away: Expedite the process from problem statement to project initiation, and to track project implementation
8
Pennsylvania Department of Transportation ◦ Conducted a PA Council of Transportation Universities meeting ◦ Received the Governor’s Office of Innovation award for “Innovation of the Year” ◦ Integrated the Municipal Research and Outreach section ◦ Completed a successful FHWA program review Rhode Island ◦ Identified and funded nine (9) new research studies ◦ Recipient of FHWA award programs
9
Round 4 ◦ Connecticut - Tools for Assessing Wider Economic Benefits of Transportation (C11) – Lead Adopter ◦ Maryland – Reliability Data and Analysis Tools (L02/L05/L07/L08/C11) – Proof of Concept Partnership to Develop an Integrated, Advanced Travel Demand Model and a Fine-Grained, Time Sensitive Network (C10) – Proof of Concept ◦ New York – Concept to Countermeasure – Research to Deployment Using the SHRP2 Safety Databases – Proof of Concept
10
Round 4 Continued ◦ New Hampshire – Project Management Strategies for Complex Projects (R10) — User Incentive ◦ New Jersey – Technologies to Enhance Quality Control on Asphalt Pavements (R06C) — Lead Adopter (infrared) The Effect of Smart Growth Policies on Travel Demand /SmartGAP (C16 ) – User Incentive ◦ Maine - Technologies to Enhance Quality Control on Asphalt Pavements (R06C) — Proof of Concept (ground penetrating radar) — Lead Adopter (infrared)
11
Round 4 Continued ◦ Pennsylvania – Tools to Improve PCC Pavement Smoothness During Construction (R06E) — Lead Adopter Nondestructive Testing for Concrete Bridge Decks (R06A) — Lead Adopter Nondestructive Testing for Tunnel Linings (R06G) — Proof of Concept Service Life Design for Bridges (R19A) — Lead Adopter Managing Risk in Rapid Renewal Projects (R09) — User Incentive
12
Round 5 Delaware o Railroad – DOT Mitigation Strategies (R16) – Lead Adopter District of Columbia ◦ 3D Utility Location Data Repository (R01A) - Proof of Concept ◦ Railroad – DOT Mitigation Strategies (R16) – User Incentive Massachusetts ◦ Planning Process Bundle (C02/C08/C09/C12/C15) – Lead Adopter
13
Round 5 New York o Railroad – DOT Mitigation Strategies (R16) – Lead Adopter Pennsylvania ◦ Performance Specification for Rapid Renewal (R07) – Lead Adopter ◦ Planning Process Bundle (C02/C08/C09/C12/C15) – Lead Adopter
14
Maine Department of Transportation ◦ Sarah Mildred Long Bridge Replacement Project - $1,000,000 New Hampshire ◦ Bridge Monitoring Technology at Portsmouth Memorial Bridge - $355,000 ◦ Pavement Preservation Project - $895,892 Rhode Island ◦ Innovative Arch Construction Project - $480,000
15
Pennsylvania ◦ Adaptive Traffic Signal Control - $720,000 Rhode Island ◦ Innovative Arch Construction Project - $480,000 Vermont ◦ Advanced Traffic Monitoring - $981,780 ◦ Tri-State Advanced Transportation Management and Traveler Information System - $1,000,000
16
District DOT ◦ Apply for AID grant and use our STIC funding ◦ Continue to advance our strategic plan implementation: data initiatives, outreach, coordination, program management ◦ Broader involvement of intellectual capital of University consortium ◦ Process improvement for enhancing quality of research products ◦ Focus on implementation ◦ Role in study on multimodal congestion measurement & mitigation
17
New York DOT ◦ Peer Exchange (September 23 – 24) ◦ Topic: Creating an Effective SPR Research Program ◦ Expectations: Concise summary of best practices and approaches, identification of gaps, and suggestions for future training Pennsylvania DOT ◦ Implementation of high priority STIC innovations and research focused on the strategic agenda ◦ Re-engineering the Research Program Management System for tracking the Research Program ◦ Exploring idea of peer exchange
18
Massachusetts DOT ◦ Continue focus on closing projects ◦ Use methodologies and procedures to monitor project implementation ◦ Improve interaction between the project champion and the research project ◦ Include a research training curriculum to further educate Department and municipal personnel on the results of the research projects New Hampshire DOT ◦ Updating the RD&T 2 Primer ◦ Aggressive campaign for Research Problem Statements Department wide ◦ Mapping implemented research projects statewide
20
See You in Providence, Rhode Island
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.