Presentation is loading. Please wait.

Presentation is loading. Please wait.

2011 MF LRG New Orleans, LA MAINTENANCE CENTER ALBANY MSgt Watkins INTRODUCTION.

Similar presentations


Presentation on theme: "2011 MF LRG New Orleans, LA MAINTENANCE CENTER ALBANY MSgt Watkins INTRODUCTION."— Presentation transcript:

1 2011 MF LRG New Orleans, LA MAINTENANCE CENTER ALBANY MSgt Watkins INTRODUCTION

2 2011 MF LRG New Orleans, LA Maintenance Center Albany MFCS Management Team  Program Management Branch Head: Harold Eidson  Project Section Supervisor: Blase Goodman  Project Lead: Jim Clanton  Planner/Estimator: Rob Tyler  Industrial Engineering Tech: Keith Hamsley  MFP Liaison: MSgt Watkins  Assistant MFP Liaison: SSgt Collins  Contractor Service Support: Kevin Adams MCA MFCS TEAM

3 2011 MF LRG New Orleans, LA Assets Completed FY11  Mobile Facilities:  (5) JU-01s  (8) JF-05s – Army Assets  (5) KA-31s  (1) AM-01  (1) CA-01  (1) CA-04  (1) SU-03  TQGs:  (28) Preserved in an ‘RFU’ status PRODUCTION

4 2011 MF LRG New Orleans, LA Assets in Process/Scheduled FY11:  Mobile Facilities:  (1) NB-03  (1) LA-01  (1) CS-02A  (1) CS-03B  (1) SU-01  (2) AM-04A  (1) AM-03B  (1) AT-12  (1) CR-03  (1) BR-04A  (1) BR-05B  (1) PM-01  (1) TR-01  (1) CY-01  (1) JU-01  (1) SM-04B  (2) JF-10A  (2) JF-11B SCHEDULE

5 2011 MF LRG New Orleans, LA Assets in Process/Scheduled FY11:  TQGs:  (51) Preservation for ‘RFU’ status  (3) Repair  Lift-Off Hinge:  (28) Cast hinges due in August  Send to Marine Container for CSC testing SCHEDULE

6 2011 MF LRG New Orleans, LA ROC LOC REMOVAL ROC LOC Removal/Storage Video

7 2011 MF LRG New Orleans, LA ROC LOC INSTALL ROC LOC Install Video

8 2011 MF LRG New Orleans, LA LIFT-OFF HINGE VIDEO

9 2011 MF LRG New Orleans, LA Issues/Concerns  Parts Issues  Obsolete parts  No longer required items in MF configurations  Fleet Returned MFs: SOMFs panels need to be securely fastened Naval Messages need to annotate what is missing from the inventory.  Fleet Assistance: For information For missing assets ISSUES/CONCERNS

10 2011 MF LRG New Orleans, LA Maintenance Center Albany MFCS Team POCs  Project Lead: Jim Clanton 229-639-7477  Planner/Estimator: Rob Tyler 229-639-6834  Industrial Engineering Tech: Keith Hamsley 229-639-7470  MFP Liaison: MSgt Watkins 229-639-9060 (DSN: 567)  Assistant MFP Liaison: SSgt Collins 229-639-7207 (DSN: 567)  Contactor Service Support: Kevin Adams 229-639-7061 (DSN: 567) MCA MFCS TEAM POCS

11 2011 MF LRG New Orleans, LA 11 ARE THERE ANY QUESTIONS? QUESTIONS


Download ppt "2011 MF LRG New Orleans, LA MAINTENANCE CENTER ALBANY MSgt Watkins INTRODUCTION."

Similar presentations


Ads by Google