Download presentation
Presentation is loading. Please wait.
Published bySheryl Daniels Modified over 9 years ago
1
The ANTARES Neutrino Telescope and its Dark Matter Capabilities
Jürgen Hößl, Universität Erlangen, on behalf of the ANTARES Collaboration Edinburgh, September 2004
2
ANTARES NeutrinoTelescope
buoy 350 m 12 lines 25 storeys / line 3 PMTs / storey 40 km to shore 100 m Junction box muon 65 – 70 m
3
ANTARES Site Shore Station Institut Michel Pacha -2500m
Submarine Cable La Seyne sur Mer Institut Michel Pacha Shore Station
4
2/3 of time: Galactic Centre
Sky Coverage ANTARES 43o North 2/3 of time: Galactic Centre Dateien AMANDA South Pole Dateien 0.5 p sr instantaneous common view 1.5 p sr common view per day
5
Angular Resolution sq < 0.2o m n n m for high energies:
(Quality of water!)
6
ANTARES Collaboration
Erlangen NIKHEF Amsterdam ITEP Moscow Sheffield Leeds IFREMER, Brest DAPNIA, Saclay IReS, Strasbourg Mulhouse CPPM Marseille IFREMER,Toulon COM, Marseille OCA, Nice Genova Bologna Bari IFIC Valencia Pisa Roma Catania LNS
7
Scientific Programme Neutralino search
Annihilation at centre of Earth, Sun, Galaxy cc n .... Search for galactic/extragalactic n sources SN remnants, Galactic microquasars AGN, GRB, … + oceanography, biology, seismology
8
Cosmic Particle Accelerators
Gamma Ray Bursts Supernova Remnants Pulsars, Plerions Active Galactic Nuclei (Quasars, Blazars) Microquasars
9
Dark Matter Microwave background Gravitational lenses
Rotation of galaxies Gravitational lenses
10
Search for Neutralino Annihilation
Gravitational capture of c in Earth, Sun, Galactic Centre c c WIMP loses energy by elastic interaction if v< vescape =>capture capture + annihilation balance => constant density in core Annihilation: Wm m c c+ c bcm m - ~ b c bcm m + hard spectrum ( if Mc<MW) soft spectrum
11
Dark Matter Sensitivity
search cone around source (depends on Neutralino mass) number of atmos- pheric background events 90 % upper limit on signal events mSUGRA parameter scan comparison muon/neutrino flux prediction muon /neutrino flux limit
12
WIMP Annihilation in Sun
13
WIMP Annihilation at Centre of the Earth
- mass of Earth << mass of Sun possibly dramatic reduction of capture rate in Earth due to depletion of neutralino density by solar capture Large uncertainties (J.Lundberg and J.Edsjö, astro-ph/ ) only small capture rate in the Earth annihilation rate and neutrino flux from Earth smaller than from Sun for ANTARES: search from Earth not competitive with search from Sun
14
WIMP Annihilation at Galactic Centre (GC)
possibility to probe DM profile in Galactic Centre (contrary to direct searches) - uncertainties about DM profile: standard parametrisations give low neutrino fluxes from GC (e.g. Navarro, Frenk and White, Astrophys. J. 462(1996) 563 ) from G. Bertone et al. astro-ph/
15
WIMP Annihilation at Galactic Centre (GC)
but: possible enhancement of annihilation flux by orders of magnitude in the presence of a black hole (spike) (e.g. P. Gondolo and J. Silk, Phys. Rev. Lett. 83(1999)1719 ) EGRET g signal neutrino flux: from G. Bertone et al. astro-ph/ orders of magnitude flux uncertainties!
16
Mini Instrumentation Line Feb 2003
Prototype Sector Line Dec 2002 12m 100m 100m LASER Beacon LED beacon Mini Instrumentation Line Feb 2003 Status ANTARES to shore Oct 2001 Dec 2002
17
Prototype Sector Line: Nov 2002
18
PSL & MIL Operation in 2003 Lot of data during 3 months of operation
Sea operations: - deployment/connections/recovery without problems Line operations: - power distribution - data transfer to shore (130 GByte) - remote control minor problems: - distribution of the onshore synchronised clock signal failed due to broken fibre: manufacturer used inappropriate cable water leakage in Mini Instrumentation Line after 2 months under high pressure: mismatch of o-ring/hole size Lot of data during 3 months of operation
19
Optical Background Less than 1% burst fraction 10% burst fraction
bursts baseline 10min 10min K + bioluminescence 40
20
Long Term Background
21
ANTARES Summary and Future
_________________ Operation of Sector Line Deployment of lines 1 to 12 and operation Mini Instrumentation Line with Optical Modules: deployment and operation Sector Line connection in 2007 12 string detector complete Mini Instrumentation Line deployment Sector Line deployment Junction box deployment
22
The End
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.