1 T-76.115 Project Review BigBrother I1 Iteration 1.12.2004

2 T-76.115 Project Review 2 Agenda  Introduction (5 min)  Skipped if all review attendees are familiar with the project  Project status (15 min)  Achieving the goals of the iteration  Project metrics  Work results (10 min)  Presenting the iteration’s results  Demo  Used work practices (5 min)  Next iteration planning (5 min)  Discussion 5 min 15min 10min 5min 5min 1

3 T-76.115 Project Review 3 Introduction to the project  Customer: Beconnected Finland Ltd.  Produces IP-based video surveillance systems for international market  Main product: ASAN = Automatic Surveillance and Alarming Network  Customer representative: PhD Michael Samarin  Project team:  Aino Lahdenperä, Maija Kangas, Outi Syysjoki, Janne Ojala, Antti Alestalo, Juhani Nokela, Ville Vatén  GOAL: Produce tools, which help Beconnected in their customer support work and reduce costs through increased productivity  Three tools will be created:  Watchdog – Automatic monitoring of network cameras  HourLogger – Log support person’s work hours per customer/target  LogAnalyzer – Search for error patterns from ASAN logs  Beconnected’s goals:  Working software is the only thing that matters  KISS – Concentrate on simplicity, maintainability, quality. No fancy features  Very busy making business – we should bother them as little as possible  Minimize costs – all costs should be covered by the attendance fee to SoberIT 5 min 15min 10min 5min 5min 3

4 T-76.115 Project Review 4 Overview of the problem domain 5 min 15min 10min 5min 5min 5

5 T-76.115 Project Review 5 Status of the iteration’s goals  Goal 1: Set up development environment  OK, except servlet debugger still does not work  Goal 2: Watchdog core functionality  We had a slight misroute on the way but are now on the right track  Almost there but no QA performed.  Goal 3: Hourlogger core functionality  OK, except only minor QA performed yet  Goal 4: LogAnalyzer architecture  We have planned, but no official documents exist yet  LogAnalyzer UI has not been planned yet  Goal 5: Requirements maintained and detail level increased  OK  Goal 6: SEPA practices used and revised  Not OK, Usability Tests postponed, No time for Design Patterns, Pair Programming used slightly, Meeting practices used, but not revised.  Goal 7: Quality Assurance plan  OK, but actual QA hasn’t started yet due to resources problems 5 min 15min 10min 5min 5min 7

6 T-76.115 Project Review 6 Status of the iteration’s deliverables  Project Plan  Quality Assurance plan: problems due to Maija’s absense  OK  Requirements document  OK  Watchdog core functionality  Almost there, demonstrated to Beconnected this morning  Watchdog technical specification  Sent documentation to Beconnected, but is somewhat outdated  Hourlogger core functionality  OK  Hourlogger technical specification  OK, sent documentation to Beconnected  Test case document  POSTPONED: QA activities have not been started yet  Agreement on legal rights to project deliverables  NOT OK. We still don’t have a written contract about the legal rights to the project deliverables with the customer. 5 min 15min 10min 5min 5min 9

7 T-76.115 Project Review 7 Realization of the tasks  Major discrepancies  Architectural design of too complex system takes time…  Programming slower due to slow debugging cycle…  Development environment setup has really been pain in the ***.  A lot of miscellaneous project communication not budgeted  Not started:  Systematic QA postponed to I2 due to Maija’s absense and slower progress than expected  Still not much effort on SEPAs 5 min 15min 10min 5min 5min 11

8 T-76.115 Project Review 8 Realization of budget  Monthly allowance of € 100 for miscellaneous well justified project costs  October costs:  € 1 for mailing the NDAs  $ 43 for buying Core Servlets and JavaServer Pages, Vol. 1 from Amazon  November costs:  € 22 for pizza and coke for long weekend coding session  € 17.30 for pizza and coke for the final crunch coding session on Monday 5 min 15min 10min 5min 5min 12

9 T-76.115 Project Review 9 Working hours by person  Maija had to leave Finland and haven’t been able to work at all for the project  Ville had to write the QA plan and has also performed design, testing and development environment setup.  Aino’s figure is more than 38 hours…  Work distribution among members has equalized since PP Realized hours in this iteration 5 min 15min 10min 5min 5min 13

10 T-76.115 Project Review 10 Working hours by person  Shifted weight from the FD iteration to I2 iteration.  It’ll be interesting to see can Maija gain on us her lost hours in I1 Realized hours in this iterationPlan in the beginning of this iteration Latest plan (realized hours, updates up and down) 5 min 15min 10min 5min 5min 14

11 T-76.115 Project Review 11 Quality metrics  Full controlled QA has not started yet  Concentration on the architecture and core functionality  Only minimal error handling implemented currently I1I2FDTotal Reported 11 Closed 44 Open 7 Bug metrics BlockersCriticalMajorNormalMinorTrivialEnhancementTotal Total open 00012137 This iteration reported 00012137 5 min 15min 10min 5min 5min 15

12 T-76.115 Project Review 12 Quality assessment Functional areaCoverageQualityComments Requirements Document 2 Improving all the time Project Plan2 Has been reviewed Development Environment 2 Works and has been used Watchdog0  Core functionality almost ready, not tested HourLogger1 Core functionality ready and tested quickly SEPA documents1  Only the minimal stuff exists yet Legend Coverage: 0 = nothing 1 = we looked at it 2 = we checked all functions 3 = it’s tested Quality:  = quality is good  = not sure  = quality is bad 5 min 15min 10min 5min 5min 16

13 T-76.115 Project Review 13 Software size in Lines of Code (LOC)  Concentrated on architecture and core functionality  Not all the lines here are actual live code  Code refactoring needed PPI1I2FD Watchdog java classes 02910 Watchdog JSPs 0970 HourLogger JSPs 0851 LogAnalyzer JSPs 00 Testing and example JSPs 0201 Utils 01882 Other 0134 Total (NCLOC + COM) 06948 5 min 15min 10min 5min 5min 17

14 T-76.115 Project Review 14 Risks  Risks  Maija’s absense affects our QA activities => forced to postpone most of it to I2  Development environment  An old computer running in Ville’s wardrobe  Work is highly dependent on working Trinet and Aalto  Also needed for the demo in the project review  NDA is very strict  We can not publish something critical to the course  We may publish something that breaches the NDA  Busy schedules among group members  Potential communication problems  Quality problems among team member deliverables 5 min 15min 10min 5min 5min 19

15 T-76.115 Project Review 15 Changes to the project  Iteration 1 was turned into prototyping and architecture implementation  QA was postponed to I2-FD due to Maija’s absence  More critical to get the functionality working than QA at this point  Small changes to requirements  Natural process of refining customer needs and finding out new requirements 5 min 15min 10min 5min 5min 20

16 T-76.115 Project Review 16 Results of the iteration  Watchdog demonstration  HourLogger demonstration 5 min 15min 10min 5min 5min 20

17 T-76.115 Project Review 17 Watchdog  Watchdog  Monitors status of network camera on predefined intervals  Alarms when malfunction occurs  Records historical data of network camera statuses and erases old data  Architecture  We were building too complex system and wasted time  Now everything seems to be on the right track…  Implemented functionality  Background process: Fetches images from cameras and analyzes them  Camera list: Lists cameras and their current and past status  Camera info: Basic functionality is there, easy to expand  Configuration  User is able to change some parameters  Not all parameters implemented yet  Not implemented  Alarms and their configuration  QA has not started yet due to Maija’s absense 5 min 15min 10min 5min 5min 22

18 T-76.115 Project Review 18 Demonstration  Watchdog  We’ll show you how background process works (by breaking up cameras!)  You’ll see the main view of the system and camera info view  Camera IPs have been censored to protect customer IP 5 min 15min 10min 5min 5min 27

19 T-76.115 Project Review 19 HourLogger  HourLogger  Logs technician's work hours per customer, per target and per work type  Produces reports of the recorded work tasks  Architecture  This is not rocket science  More focus will be paid on the usability  Implemented functionality  Input work tasks and types  Overview of worktypes  Usability tuning still needed. This will be continued in I2  Not implemented  Reports, Exporting, Customer/target management  Only minimal QA performed  All problems found have been easily fixed 5 min 15min 10min 5min 5min 28

20 T-76.115 Project Review 20 Demonstration  HourLogger  Inserting a new performed check  Showing the overview of performed checks per customer and target 5 min 15min 10min 5min 5min 30

21 T-76.115 Project Review 21 Used work practices  Time reporting in Trapoli  Still difficulties in time logging: dividing working hours and usability  Development server in Ville’s clothes closet  Problems with Trinet…  Long development cycle  Difficult debugging  Meetings  Worked well, but still scheduling problems among group members  Risk management  Risks have been managed, but not documented very well…  Requirements elicitation and analysis  Continued with the same style than in PP phase  Group working sessions  Group architectural design sessions  Group user interface design sessions  Group coding sessions with a couple of pair programmin sessions  Coding convention  Not complete  Nobody has completely followed the guidelines 5 min 15min 10min 5min 5min 35

22 T-76.115 Project Review 22 Iteration I2 Goals  Generic goals:  Quality Assurance really started now  Code refactoring needed  Coding convention, commenting, documenting improved  Watchdog & HourLogger & LogAnalyzer goals  Minimum requirements functionality ready and fully tested  Test installation in customer’s test environment  Usability tests performed with customer representative with actual work tasks  SEPA goals:  Pair programming sessions on most critical use cases  Usability tests performed for all deliverables  Design patterns used in refactoring  Meeting practices are reviewed and improved  Iteration I2 divided to two sub-iterations  Three weeks development, then installation to customers environment  One week for customers internal testing and commenting  One week for applying customer’s feedback back into the products 5 min 15min 10min 5min 5min 39

23 T-76.115 Project Review 23 Questions? 5 min 15min 10min 5min 5min 40