Presentation is loading. Please wait.

Presentation is loading. Please wait.

Strong as a Buck. Meet The Team Warn Wilson John Clark Dre Crumbly Electrical Engineering Computer Engineering.

Similar presentations


Presentation on theme: "Strong as a Buck. Meet The Team Warn Wilson John Clark Dre Crumbly Electrical Engineering Computer Engineering."— Presentation transcript:

1 Strong as a Buck

2 Meet The Team Warn Wilson John Clark Dre Crumbly Electrical Engineering Computer Engineering

3 Meet The Team Microelectronics & Optoelectronics Wildlife Nutrition & Physiology Wildlife Fisheries & Aquaculture

4 Overview Problem Our Solution Constraints Approach Progress To Date Timeline

5 Problem What determines the reproductive success of white-tailed deer? Age? Antler Size? Nutritional Status? Strength?

6 Our Solution Strong as a Buck  Measures force  User friendly  Easy to read display  Store measurements into memory

7 Technical Constraints NameDescription Force CapacityThe device must be able to withstand 683 pounds (lbs) of force. Battery LifeThe battery life of the device must be 1-1.5 hours. Conversion RateThe analog-to-digital converter (ADC) must have a conversion rate of 9.6 kilohertz (kHz). AccuracyThe device must account for ± 5% of combined error of output of the load cell. MemoryThe device must have 1 gigabyte (GB) of flash memory in order to provide ample memory space for the saved data.

8 Practical Constraints Environmental Must not damage the facility Must not harm the deer Must be mobile enough to move in and out of the pens

9 Practical Constraints Sustainability Must maintain sufficient structural integrity Must be durable enough to be used for repeated application.

10 Approach 3 Sensors For Each Antler Amplifier Microcontroller Display Memory

11 Approach Arduino Mega 2560Raspberry PiBeagleBone Price$45$35$89 Clock Speed16MHz700MHz Min. Power.3 Watts3.5 Watts.85 Watts Digital Pins54866

12 Approach Beam Load CellPlatform Load CellCompression Load Cell Price$300$740$60 Weight Range10-5,000 lbs.7,500-500,000 lbs.2-1000 lbs.

13 Progress to Date

14 Software Testing Hardware Components Rig Design Current Stage

15 Timeline AugustSeptemberOctoberNovemberDecember Research Hardware Software Testing & Debugging Working Prototype

16 Questions?


Download ppt "Strong as a Buck. Meet The Team Warn Wilson John Clark Dre Crumbly Electrical Engineering Computer Engineering."

Similar presentations


Ads by Google