Download presentation
Presentation is loading. Please wait.
Published byCatherine Floyd Modified over 8 years ago
1
ESA/ M. Wolff EADS-ST/A. Brinkmann Briefing to IDAGS TIM12: 1 st Columbus Laptop Eval Page 1 Briefing to Multilateral IDAGS TIM12 NASA/JSC, Aug. 2003 Mikael Wolff phone +31-71-565.3206 fax +31-71-565.5420 e-mail mikael.wolff@esa.int Columbus System Laptop – 1st Crew Evaluation Andrea Brinkmann phone +49-421-539.5344 fax +49-421-539.4661 e-mail Andrea.Brinkmann@astrium-space.com
2
ESA/ M. Wolff EADS-ST/A. Brinkmann Briefing to IDAGS TIM12: 1 st Columbus Laptop Eval Page 2 Introduction o Columbus Displays were assessed by 5 astronaut representatives from NASA and ESA crew offices late Sep. 2002. The evaluation was performed at ASTRIUM GmbH (Bremen - Germany) on the COL-TRU Simulator (Columbus Trainer for US). All astronaut representatives were experienced in display standards. o Assessment of displays was mainly driven by performing tasks (5 scenarios) in accordance with ODF formatted procedures o Some displays were evaluated solely as static screen dumps (e.g. DMS and COMMS) o Not the full functionality of the PWS (ESA Columbus portable workstation) was implemented. System message panel and Automatic Crew Procedure application was not available
3
ESA/ M. Wolff EADS-ST/A. Brinkmann Briefing to IDAGS TIM12: 1 st Columbus Laptop Eval Page 3 Crew Tasks Performed
4
ESA/ M. Wolff EADS-ST/A. Brinkmann Briefing to IDAGS TIM12: 1 st Columbus Laptop Eval Page 4 Software Structure
5
ESA/ M. Wolff EADS-ST/A. Brinkmann Briefing to IDAGS TIM12: 1 st Columbus Laptop Eval Page 5 Display Development Environment O Columbus mission preparation tool FWDU V3.2.9 (flight window definition utility) Software application encompassing the commercial display builder SAMMI (version 3.0.12) Columbus mission data base bindings.
6
ESA/ M. Wolff EADS-ST/A. Brinkmann Briefing to IDAGS TIM12: 1 st Columbus Laptop Eval Page 6 Rating Scale Applied
7
ESA/ M. Wolff EADS-ST/A. Brinkmann Briefing to IDAGS TIM12: 1 st Columbus Laptop Eval Page 7 Findings n Crew Review Results See the spreadsheet ‘Crew Report – Matrix’ for major evaluation results and associated crew recommendations
8
ESA/ M. Wolff EADS-ST/A. Brinkmann Briefing to IDAGS TIM12: 1 st Columbus Laptop Eval Page 8 What’s Next ? Second crew assessment event will take place last week of August, also in Bremen. Full PWS (portable workstation) functionality will then be available. n The event is part of ongoing Columbus QR1 activities
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.