Download presentation
Presentation is loading. Please wait.
Published bySherman McKenzie Modified over 9 years ago
1
Pg 1 of 15 AGI www.agi.com Joint Navigation Warfare Center’s Common Operating Environment AGI UC – Oct 11 th, 2005
2
Pg 2 of 15 AGI www.agi.com Describe and Demonstrate the JNWC’s Common Operating Environment Purpose Measures of Performance S/N, Availability, Coverage Measures of Effectiveness CEP, TLE, Range Errors HDOP good bad Prediction analysis & Performance assessment NCOE
3
Pg 3 of 15 AGI www.agi.com Outline Problem Description of Needs –Pre-flight –Real-time –Post-test Demonstration
4
Pg 4 of 15 AGI www.agi.com Problem JNWC needs a tool that is… –Easy to use (Reading in data, processing results) –High Fidelity (Yields accurate predictions) –Eye Pleasing (You can “see” what is happening) –Common among all users (Repeatable results) –Built to support all phases (Preflight, Real-time, Post) –Built to support all missions (EA, ES, and EP)
5
Pg 5 of 15 AGI www.agi.com Needs – Pre-flight Perform Preflight prediction analysis –Mission Planning (Jammers / Routes placement) Power Levels Assets in view J/S contour Predicted Nav solution
6
Pg 6 of 15 AGI www.agi.com Needs – Real-time Provide Real-time Situational Awareness –Data streaming from TSPI, TIBS, FAA, Comm links Positions, Collected data, performance data –Projected data calculated via models Power levels, In-view analysis, theoretical performance Data – Strip Charts 3-D Situational Awareness Bird’s Eye view of the test Data Feeds Models Quick Look Analysis
7
Pg 7 of 15 AGI www.agi.com Needs – Post-test Perform Post Test analysis –Comparison results / analysis Truth (TSPI) versus Measured (calculated) Predicted (models) versus Measured (calculated) –Points of Interest Drill Down Vulnerability Assessments / TTP development / Reports
8
Pg 8 of 15 AGI www.agi.com Started from… Total RF (dBW) -133.2 R/S (dB) 34 J/S (dB 67 Nav Error (m)34.52 Azimuth (deg)98.28 Elevation (deg)11.34 FOM data Nav Error Instant Total RF power Nav Error over time Each Jammer power Color coded (FOM) Position (actual) Jammer Gains and Coverage Tracking Vectors (Colored C/N)
9
Pg 9 of 15 AGI www.agi.com Description of NCOE - AOI 4DX Application User Friendly Built to task Start with AOI
10
Pg 10 of 15 AGI www.agi.com Description of NCOE - Time Time dependant 1 sec time step GMT standard Next enter Time
11
Pg 11 of 15 AGI www.agi.com Description of NCOE - Tasks Tasks chosen by JNWC for JNWC Task to Results Input data Tasks
12
Pg 12 of 15 AGI www.agi.com Description of NCOE - Data External data wizard Import data smoothly No specific input format needed Collected data
13
Pg 13 of 15 AGI www.agi.com Description of NCOE - Jammers Jammer data entry Types and locations Database included Jammer data
14
Pg 14 of 15 AGI www.agi.com Description of NCOE - Platforms Platform data entry Types and equipment Database included Platform data
15
Pg 15 of 15 AGI www.agi.com Description of NCOE - Finished Collected Data –Truth –Measured Predicted Data Analysis Tool 4D Interactive Display
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.