Presentation is loading. Please wait.

Presentation is loading. Please wait.

CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD 1858301CHATSWORTH HSChatsworth.

Similar presentations


Presentation on theme: "CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD 1858301CHATSWORTH HSChatsworth."— Presentation transcript:

1 CHATSWORTH HIGH SCHOOL

2 LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD 1858301CHATSWORTH HSChatsworth HS - Baseball Netting 8583 CHATSWORTH SH (B LETTER)SHADE FAB/PADDING/BLEACHERS (B LTR) 8583CHATSWORTH SH (JOC)BASEBALL NETTING (JOC) 8583 CHATSWORTH SH (M&O WORK)RPR/REN ADMIN/PE BLDGS RR-POT (M&O) NO DETAILED DESCRIPTION NO SPACE IDENTIFICATION NEED FIELD CLARIFICATION NEED PROJECT COST

3 LOCNSNAMTASK_NAME 8583CHATSWORTH HS PURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD NO NEW BUILDINGS AT SOFTBALL FIELD SINCE INITIAL SURVEY

4 LOCNSNAMTASK_NAME 1858301CHATSWORTH HSChatsworth HS - Baseball Netting 8583CHATSWORTH SH (JOC)BASEBALL NETTING (JOC) NETTING IS NOT CAPTURED, WHAT ABOUT STEEL POSTS?

5 LOCNSNAMTASK_NAME 8583CHATSWORTH SH (B LETTER)SHADE FAB/PADDING/BLEACHERS (B LTR) SHOULD THESE COMPONENTS BE SURVEYED?

6  WE’RE ASSUMING THIS IS A RESTROOM RENOVATION WITHIN THE ADMINISTRATION AND PE BUILDING.  ASSUMING “POT” MEANS PATH OF TRAVEL, WHAT ADDITIONAL INFORMATION WILL BE NEEDED TO BE VALIDATED?  ADA FIXTURE VALIDATION. LOCNSNAMTASK_NAME 8583CHATSWORTH SH (M&O WORK)RPR/REN ADMIN/PE BLDGS RR-POT (M&O)

7 THERE ARE 12 RESTROOMS IN BOTH THE ADMINISTRATION AND PE BUILDING 24016ADMINISTRATION1116203TOILET 24016ADMINISTRATION1115221TOILET 24016ADMINISTRATION1115137TOILET 24016ADMINISTRATION1116653TOILET 24016ADMINISTRATION1116650TOILET 23677PHYSICAL EDUCATION1116043TOILET 23677PHYSICAL EDUCATION1115883TOILET 23677PHYSICAL EDUCATION1113930TOILET 23677PHYSICAL EDUCATION1114037TOILET 23677PHYSICAL EDUCATION1113541TOILET 23677PHYSICAL EDUCATION1113540TOILET 23677PHYSICAL EDUCATION1112524TOILET

8 LIGHT FIXTURE COMPONENT HAS BEEN MODIFED FROM ORIGINAL SURVEY. FREQUENCY FOR GLUE UP CEILING TILE IS NOW 6. SHOULD THE RSL BE UPDATED GLOBALLY?

9 SAME AS 1 OF 12

10

11 NEW SINK - RSL NEEDS TO BE UPDATED FROM 10 TO 30. NEW TOILET - COMPONENT NEEDS TO BE CHANGED FROM 22369 TO 22895, WITH AN RSL OF 30.

12 NEW SINK, TOILET, FLOOR COVERING, AND PAINT. UPDATE RSL FOR THE GLUE UP CEILING TILE TO 0.

13 NEW CERAMIC WALL TILE, CERAMIC FLOOR TILE, TOILETS, URINALS, SINKS, PARTITIONS, AND HAND DRYER. TWO T-12 FIXTURES HAVE BEEN REPLACED WITH THREE T-8 FIXTURES.

14 NEW PAINT ON THE WALLS. NO URINAL COMPONET IN CURRENT DATA.

15 UPDATE CERAMIC WALL TILE RSL FROM 5 TO 35. UPDATE CERAMIC FLOOR TILE RSL FROM 10 TO 30. 2 MISSING 3.5 WATER CLOSET COMPONENTS IN CURRENT DATA.

16 UPDATE CERAMIC WALL TILE RSL FROM 5 TO 25. UPDATE CERAMIC FLOOR TILE RSL FROM 20 TO 35. UPDATE URINAL RSL FROM 2 TO 8. UPDATE INTERIOR DOORS FROM 5 TO 20.

17 DRY TOILET TRAPS TYPICAL WITHIN CLOSED BATHROOM NO SIGNIFICANT CHANGES

18

19 NEW CERAMIC WALL TILE, CERAMIC FLOOR TILE, TOILETS, SINKS, PARTITIONS, LIGHTING FIXTURES, AND HAND DRYER.

20 NEW LOCKER ROOM COMPONENTS

21 NEW SOLAR PANELS

22 NEW DRINKING FOUNTAINS

23 NEW ROOF COVERING OVER ADMINISTRATION BUILDING

24 NEW COACH’S OFFICE

25  WHY AREN’T OTHER PROJECTS ON THE LIST?  SHOULD THESES OTHER PROJECTS BE VALIDATED?  WHAT ARE OUR TIME CONSTRAINTS?  WHAT PROCESS IS REQUIRED TO ADD NEW BUILDINGS?  REDLINE  SURVEYS FOR ALL CRAFTS

26  SERVICE CALLS  A SINGLE BARD UNIT CAN BE REPLACED WITH A SERVICE CALL. UNITS COST BETWEEN $9,500 TO $13,000.  INSTALLED COSTS CAN BE $28,000 OR MORE. SERVICE CALLS ARE UP TO 100 HOURS.  UNIT CHANGE- OUTS REQUIRE HVAC, CARPENTRY, ELECTRIC, WELDING, ETC.

27  TO DATE 24 HOURS OF TIME HAS BEEN SPENT VALIDATING THESE 5 PROJECTS.  UPDATES HAVE YET TO BE MADE TO THE DATA WITH WHAT HAS BEEN FOUND.  IN ADDITION TO THE GIVEN PROJECTS LIST, WE NEED A COMPONENT REPORT OF THE ORIGINAL SURVEY SORTED BY BUILDING AND SPACE.


Download ppt "CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD 1858301CHATSWORTH HSChatsworth."

Similar presentations


Ads by Google