Download presentation
Presentation is loading. Please wait.
Published byToby Tate Modified over 9 years ago
1
Rain Garden 2013 Accept the Greener Challenge
2
Falls Lake Watershed NCSSM Falls Lake Watershed
3
Falls Lake Clean Water Requirement EPA requirements for the Falls Lake Watershed: 20% reduction in total nitrogen by 2016 If the lake quality fails to improve by 2016, a $115 million upgrade of Raleigh’s E.M. Johnson Treatment Plant will be needed. Other improvements may cost an additional $200 million.
5
Significance of our site: Royall Parking Lot
6
Process Measurements and assessments Proposal to NCSSM School Administration and Plant Facilities Rain Garden Design Contest Excavation Planting
7
Our impact Pollution reduction: - ~0.1 lb phosphorous/yr - ~1 lb nitrogen/yr - ~ 60 lb suspended solid/yr Engage and instruct local community to construct backyard and neighborhood rain gardens - held rain garden workshop as part of NC Science Festival
8
Future Works Adjust rain garden to maximize runoff capture Assist local homeowners with rain garden construction to expand the impact of the best management practice. Engage local elementary school students in sustainability through partnership with NCSSM ScienceDays club
9
Excavation
10
Mulch pile Hard at work
11
Digging barefoot. Muddy!
12
Bye
13
Credits: Photos by the Greener Challenge Club team – NCSSM 2013 Graphics on Slide 4 by KD Graphics
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.