Download presentation
Presentation is loading. Please wait.
Published byMadison Walters Modified over 9 years ago
1
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y P-8-1 207 PINE STREET WINDOW REPLACEMENT PROJECT SECTION 00020 - EXISTING CONDITION PHOTOS MAJOR MAINTENANCE FY 16 UNIT B: Brownstone sill repairs to both common room windows; east and north elevations.
2
PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y P-8-2 207 PINE STREET WINDOW REPLACEMENT PROJECT SECTION 00020 - EXISTING CONDITION PHOTOS
3
PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y P-8-3 207 PINE STREET WINDOW REPLACEMENT PROJECT SECTION 00020 - EXISTING CONDITION PHOTOS UNIT B: Infill opening, caulk and paint. Grout perimeter of vent. UNIT A: Install new bathroom ceiling fan and vent to exterior through masonry.
4
PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y P-8-4 207 PINE STREET WINDOW REPLACEMENT PROJECT SECTION 00020 - EXISTING CONDITION PHOTOS
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.