Presentation is loading. Please wait.

Presentation is loading. Please wait.

FACET Exp Area Christine Clarke 3 rd October 2013.

Similar presentations


Presentation on theme: "FACET Exp Area Christine Clarke 3 rd October 2013."— Presentation transcript:

1 FACET Exp Area Christine Clarke 3 rd October 2013

2 https://portal.slac.stanford.edu/sites/ard_public/facet/Documents/FACETExperimentalAreaDevicesLocation.xlsx Notable changes: Ion pump now in IP1 area to maintain vacuum when valve 3160 is closed E-202 chamber removed – space now exists for EOS chamber for laser-e-beam timing Space/support made for long oven design due to be installed this run Lost wirescanner 4  2 BPMs installed in the IP Area (controls information to follow) No Stainless Steel 50um window – only windows in beamline are 75um and 50um beryllium

3

4 7:30am 30 th September… what lies at the end of the rainbow?

5 IP1 table upstream end. No changes until after wirescanner. Be window moved upstream. E202 chamber removed. Space created for EOS chamber. BPM installed.

6 Downstream end of IP1 table. Oven table mover is now extended by 1 m…

7 … creating space for the new 140 cm lithium oven currently being built in UCLA. There is also a BPM installed in the bypass line.

8 Elements after the oven moved slightly downstream and some nipples/spool pieces were removed.

9 Unfortunately particularly cramped downstream and it was necessary to remove the fourth wirescanner from the IP Area. The stainless steel vacuum tight window was also removed and a valve installed to enable us to continue to vent this area and pump down again quickly.


Download ppt "FACET Exp Area Christine Clarke 3 rd October 2013."

Similar presentations


Ads by Google