1
Northgate 75KWh Solar Delivery Day: 12/18/2008
2
Boom Lift Materials to Roof
3
Material Layout
4
Roll of Solar Cell Material
5
Tools of the Trade
6
Material Layout
8
Material Adhesion
9
Solar Electric Junction Boxes
10
Northgate 75KWh Solar December 29, 2008
11
Preparing the Inverter Foundation
12
Inverter Foundation
13
Available Hook Up
14
Junction Boxes Mounted
15
Junction Box Up Close
16
Placing the Inverter
17
Inside the Inverter
19
Northgate 75KWh Solar January 9, 2009
20
Inverter Complete
21
Northgate 75KWh Solar January 22, 2009
22
Most of the Cells are Wired
23
One of Several Fuse Boxes
24
Looking across the Cells
25
Northgate 75KWh Solar February 1, 2009
26
Aerial View
28
Power Production Cycle Solar Cells PG&E InverterInverter Northgate
29
Quick Defenitions Inverter – Converts DC current into 110v AC KWh – Killowatt hour = 1000 watts for 1 hour Thin Film Solar – new flexible technology Grid – common term for the electric company Base Load – Minimum idle power (power used when no one is home) At 11:00am on April 2, the meter was activated and energy credits begin. The switch is on!