P15462 – TETHERED WIND ENERGY PLANE. Project Background The goal of this project is to design, build, and reliably test an unpowered, human-controlled.

Similar presentations


Presentation on theme: "P15462 – TETHERED WIND ENERGY PLANE. Project Background The goal of this project is to design, build, and reliably test an unpowered, human-controlled."— Presentation transcript:

1 P15462 – TETHERED WIND ENERGY PLANE

2 Project Background The goal of this project is to design, build, and reliably test an unpowered, human-controlled tethered glider specifically for use as an Airborne Wind Turbine system (AWT).

3 Customer Requirements Taken from MSD1 Customer Need #ImportanceDescription CN19Tethered glider system (with electric prop assist for launching) that demonstrates at least 3 minutes of continuous circular flight path with taunt tether. CN21Clean appearance CN39Human controlled plane CN43No special flight skill required CN59Use existing base station design CN69Tether tension is measured and recorded during flights CN79Tether direction is measured and recorded during flights CN89Videos with accompanying data files of all flight tests (even ones that don’t work) CN99Able to survive crashes with minor repairs (short downtime) CN109Replaceable Parts CN113Maintenance Guide CN129Design a robust glider which meets the above repair requirements and can be piloted in the cyclical path.

4 Engineering Requirements Taken from MSD1 Rqmt. #ImportanceTypeSource Engr. Requirement (metric)Unit of MeasureMarginal ValueIdeal ValueComments/StatusTest (Verification) S19AeroCN1Drag Coefficient--0.20.05 Calculation & XLFR5 S29AeroCN1Lift Coefficient--0.71 Calculation & XLFR5 S33AeroCN1Wingspanft3.33Customer ConstraintTape Measure S43AeroCN4Cooper-Harper Rating--31 Subjective S53AeroCN3Flight StabilityBinaryMarginalCompleteStatic Stability Criteria Calulation & Flight Testing S63AeroCN11Profile of Surface for Airfoil Manufacturingin0.10.05GD&TASTM Standard S79AeroCN1Efficiency of Wing-0.820.9 Calculation S81AeroCN1Fixed Angle of Attackdeg03 Protractor S99ElectricalCN7Horizontal Potentiometer RecordingBinaryMarginalCompleteCapability Exists (P14462)LabVIEW S109ElectricalCN7Vertical Potentiometer RecordingBinaryMarginalCompleteCapability Exists (P14462)LabVIEW S119ElectricalCN1Electronics Weightlbs0.4840.4Motor not includedScale S129FinancialCN1Initial Cost$250200 BOM S133FinancialCN10Repair Cost$10050 BOM S149MechanicalCN6Tether Tensionlbs523Capability Exists (P14462)LabVIEW S159MechanicalCN1Mechanical Weightlbs43 Scale S169MechanicalCN1Service Ceilingft75100FAA RegulationLabVIEW S173MechanicalCN1Flight Path Diameterft2550 LabVIEW S189MechanicalCN1Maximum Glider Speedmph3045 LabVIEW S193MechanicalCN1Fuselage Cross Sectional Areain 2 2016 Caliper S209MechanicalCN9Fuselage Material Tensile Strengthpsi CF is ideal materialMatWeb Lookup S219MechanicalCN9Wing Material Tensile Strengthpsi Foam Mat'l ComparisonMatWeb Lookup S223TimeCN9Repair Downtimehour241 Stopwatch S233TimeCN8Time Between Flightsmin305 Stopwatch S243TimeCN4Training Flight Hourshour121Training DocumetationStopwatch

5 Areas of Design Design Intent mapped to Physical Parameters Partially from MSD1 Area of Design Fuselage Design Wing Design Horizontal Tail Design Fuselage Material Wing/Tail Material On-Board Electronics Plane Take-Off Method Plane-to- Tether Connection Prop Location Non- Destruc tively Achieve Tether Tension Flight Path Non- Destructive Landing

6 Proposed System Design Taken from MSD1 Areas of DesignFinal System Fuselage DesignAerodynamically Optimized Rectangular Volume Wing DesignLinear Taper, Fixed Angle of Attack, Dihedral, Flaps Horizontal Tail DesignH-Shaped Tail Fuselage MaterialFoam with 3-D Printed Protective Electronic Housing Wing/Tail MaterialCarbon Fiber Strip Leading Edge, Foam with Coating On-Board Electronics (Control Feedback)In-Flight Data Recorder with Software Plane Take-Off MethodPropeller hand launch Plane-to-Tether ConnectionOne Point/Ball and Socket Joint Prop LocationPush Prop on back of fuselage Non-Destructively Achieve Tether TensionHand Spool Flight PathOffset Vertical Circle Non-Destructive LandingLand on Airframe "Smooth"

7 MFG - Foam Parts Foam Cutter Learning Curve Limitations Wing and Tail Airfoils Image(s) Here

8 MFG - Foam Parts Manual Foam Cutter Spar Holes Fuselage Image(s) Here

9 MFG - 3D Printed Fuselage How Design changed to reduce cost Key Parameters for ordering Post-Processing Image(s) Here

10 MDG - 3D Printed Motor Mount

11 MFG - Spar Connections Wing Spar/Tail Spar/Boom Anti-rotation spars CF wrap after break Tail spar reinforcement

12 MFG - Electronics Bay Electronics Bay Cut Out Cut-outs for batteries

13 Assembly - Tail

14 Assembly - Wing

15 Assembly - Fuselage

16 Weather DATA - Carl

17 MSD II – Pre-Flight Opportunities Foam Cutter - MK Motor Mount/ propeller - MK Control Surfaces – MK/CS CG location/ counterweights – MK Budget Constraints/ Problems - MZ

18 Final System Design - MK

19 Flight Testing - Maginn Hand Launches Car Testing Longboard (proxy winch system) Tether to board Tether to plane

20 MSD II – Post-Flight Opportunities Nose shearing off - MZ Wing Spar and Tail Spar Failure - MZ ESC Failure/ Motor Intermittency - MK Tail Drag – Wheel –MZ Budget Constraints/ Problems - MZ

21 Engineering Requirements - Maginn

22 Customer Requirements – Devin Customer Rqmt. # ImportanceDescriptionDid We Meet?Why Not? CN19 Tethered glider system (with electric prop assist for launching) that demonstrates at least 3 minutes of continuous circular flight path with taunt tether. No We were unable to get into the flight path. CN21Clean appearanceMarginal Due to electronics issue, electronics bay is cramped and compact. CN39Human controlled planeYes NA CN43No special flight skill requiredYes NA CN59Use existing base station designYes NA CN69Tether tension is measured and recorded during flightsNo We were unable to get into the flight path. CN79Tether direction is measured and recorded during flightsNo We were unable to get into the flight path. CN89 Videos with accompanying data files of all flight tests (even ones that don’t work) Yes NA CN99Able to survive crashes with minor repairs (short downtime)Yes NA CN109Replaceable PartsYes NA CN113Maintenance GuideYes NA CN129Full Systems Drawing PackageYes NA CN133All parts ordered by the end of MSD1Marginal Snuggie parts and pieces like glue were delayed. CN141Team trained for use of foam cutterYes NA

23 Risk Assessment – Hindsight RiskDid We Experience it? Explain.Were We Prepared? Poor Weather No. Our plane was delayed and prevented bad weather from inhibiting our performance. For more details please see Carl's wetather report. Our action to minimize risk was sufficient for the problem at hand. Structural repairs put project over budget No. We had sufficient supplimental material for all our necessary repairs.Yes our action to minimize risk was sufficient. Inability to maintain required flight path Yes. Due to motor and servo twitch we struggled significantly to control to plane and take off.Our action to minimize risk was not sufficient. Base Station Break No. We did not get to collecting data from the base station.NA Electronics failure/malfunction Yes. Our speed controller took damage upon impact.Our action to minimize risk was not sufficient. Poor material choice discovered late in design Yes, our wing and tail spars were not sufficient for impacts and loading. While our action to minimize risk was not sufficient we were able to repair with lab components and extra parts. Inability to properly identify/understand causes of flight failure Yes. We believe we have a sufficient cause of problems but we cannot adequately test. Our action to minimze risk was not sufficient. Lengthy repairs No. Our repair downtime did not extend longer than one day after initial impact fractures.Our action to minimize risk is sufficient. Insufficient thrust for Take-Off Yes. Our speed controller has caused inconsistency in producing thrust.Our action to minimize risk was not sufficient. Failure to Land Softly Yes. Our glider has needed repairs due to hard crashes.Our action to minimize risk was not sufficient. Wings Dislocate Mid-Flight No. Our wing support was sufficient to prevent dislocation mid flight.Our action to minimize risk was not needed.

24 Risk Assessment (cont.) RiskDid We Experience it? Explain.Were We Prepared? Servomotor lever arm breaks No. Our servo arms were not overstressed.Our action to minimze risk was not needed. Practice flight is delayed further No. Plane assembled easily and was not destroyed on first flight.Our action to minimize risk was sufficient. Do not provide enough power No. Our batteries can provide sufficient thrust for approximately 4 to 5 minutes.Our action to minimize risk was sufficient. Plane does not fly Yes. We think aerodynamic analysis may have been incomplete. Our action to minimize risk was not sufficient. It would have been better if all of us had taken flight dynamics before MSD. Lose connection with RC Transmitter No we did not lose connection with transmitter.Our actions to minimize risk was sufficient. Joint fatigue failure on spars We did experience failures but the cause was not through fatigue. Our actions to minimize risk was not sufficient. Structure sees significant failure on impact Yes we experienced failure on impact. Our action to minimize risk was not sufficient. Weight shifts inside of plane during flight No we did not experience this risk. Our action to minimize risk was not necessary. Inability to manufacture selected airfoil No we did not experience this risk.Our action to minimize risk was sufficient. Servo hardware loss in flight No we did not experience this risk. Our action to minimize this risk was sufficient. Failure of 3D Printed Fuselage Glued Assembly No we did not experience this risk. Our action to minimize risk was not necessary. Pilot Fatigue No we did not experience this risk.Our action to minimize risk was sufficient.

25 Accomplishments- MZ

26 Lessons Learned - MZ Plane Design is vHARD Planes are expensive Hand prop launch may not be best launch method Hollow CF tubes are not as durable as expected H-Tail is not a survivable/durable design Design of model aircraft vs. full scale

27 Moving Forward - MZ Purchase new speed controller 3D print control surfaces (lightweight/rigid) Remove material from motor mount plates to allow for more airflow Winch/launch system design 2 nd wheel for tail stability Snuggy design changes