Download presentation
Presentation is loading. Please wait.
Published byCaitlin Warner Modified over 9 years ago
1
www.developpement-durable.gouv.fr Ministère de l'Écologie, du Développement durable et de l’Énergie The French National Projet : Using WIM for direct enforcement of overloading Victor Dolcemascolo – DGITM* Bernard Jacob - IFSTTAR** * General Directorate for Infrastructure, Transport and the Sea ** French Institute for Sciences and Technology for Transports, Development and Networks
2
2 Presentation plan Introduction : Static enforcement of overloading Description of the WIM project Organization – Technicals means Budget Participation of the vendors
3
3 Static enforcement of overloading : Situation in France Yearly static controls
4
4 Static enforcement of overloading : Drawbacks and advantages Need human resources (weighing officers, policemen...) Need a static weighing area Need static scales (risk of vandalism...) Capacity to control only a small percentage of the truck traffic flow Increase of the truck traffic flow and the average level of truck overloading → not efficient → but static weighing or low speed WIM are the ONLY devices legally approved for weight enforcement (by OIML recommandation)
5
5 Description of the WIM Project 4 years project : 2013-16 IFSTTAR/ CETE Est and Ouest Objective: Implementation of HS-WIM for direct enforcement of overloading 2 phases : Phase 1 (2013-14): feasibility study for OIML type approval of an HS-WIM system Phase 2 (2015-16): construction and test of a prototype
6
6 Organization WP1: Feasibility of OIML type approval WP4: Bridge WIM WP3 : MS-WIM Transv WP : On site test WP2 : Interaction sensor/pavement WP5 : Expert study
7
7 Technical mean: Accelerated Pavement Testing Facility
8
8 Budget First phase (2013-14): 777 k€ Consumables, etc.: 177 k€ Staff: 600 k€ (50 MM) Second phase (2015-16): 728 k€ Consumables, etc.: 150 k€ Staff: 578 k€ (48 MM)
9
9 Participation of Vendors Welcome in this project to take part in the experimentations to contribute to and benefit of the R&D effort to develop market solutions and products IFSTTAR will issue a document describing the conditions of participation to this project (participation contract) + organise meetings Contact persons: louis-marie.cottineau@ifsttar.fr bernard.jacob @ifsttar.fr
10
www.developpement-durable.gouv.fr Ministère de l'Écologie, du Développement durable et de l’Énergie Thank you
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.