Levy Nuclear Plant Overview of Water Issues Presented by Jamie Hunter to the FDEP – Central District’s 13 th Annual Power Generation Conference Lake Buena Vista, FL July 2009
2
Progress Energy Florida Service Area Counties shown in green are wholly or partially served by PEF
3
Levy Nuclear Plant Site Location
5
Levy Aerial
6
Levy Site Layout (Expanded View)
7
Levy Aerial View (Looking West)
8
Artist Conceptual View
9
AP1000 Standard Plant Configuration
10
Major State/Local Permits & Approvals Levy Co. Land Use/ Zoning/ Comp. Plan Obtained Required Approvals in Sept. 2008 Florida PSC Need Determination Affirmative Determination issued August 2008 Florida Power Plant Site Certification Expect Siting Board Approval in August 2009
11
Major Federal Permits & Approvals FDEP PSD Air Construction Permit Obtained Final Permit in February 2008 FDEP NPDES Water Permit Expect Final Permit in Late 2009 Army Corps of Engineers 404/10 Permit Expect Final Permit in Late 2010 NRC Combined Operating License Expect Final License in Late 2011
12
Levy Nuclear Plant – Air Emissions l Particulate Drift from Cooling Towers l Emergency Diesel Generators/Pumps l Avoided CO2 Emissions – w Over 14 Million Tons per Year vs. Coal w Over 6 Million Tons per Year vs. Natural Gas
13
CO2 Emission Factors – Various Fuels
14
Nuclear Life-Cycle CO2 Emissions
15
Annual Air Emissions Comparison
16
Cooling Water Needs/Supply Low Profile Closed-Cycle Cooling Towers will be Used – Reduces Cooling Water needs by ~95% Over 99% of the Project’s Water Needs are for Steam Condenser Cooling Requirements Cooling Tower Makeup Water Needs are ~122 MGD Source: Cross Florida Barge Canal CT Blowdown of ~82 MGD Discharge Location: Crystal River Energy Complex
18
CFBC at Inglis Lock – Looking West
19
CFBC at Inglis Lock – Looking East
20
Cross Florida Barge Canal ( Looking West ) Intake
21
Levy Cooling Water Intake at CFBC
22
Levy Make-Up Pipeline Route
23
Levy Blowdown Pipeline Route
24
Crystal River Site Discharge Canal
25
Freshwater Needs/Source Project Requires Freshwater for: Process Boiler Water/Steam Makeup Process Equipment Cooling System Potable Water for Drinking/Sanitary Fire Suppression Systems Freshwater Quantity Needed is 1.58 MGD Freshwater Source is Groundwater from Floridan Aquifer via Onsite Wells
26
Groundwater Well Locations/Drawdown
27
Groundwater Wells/ Wetland Overlay
28
Wetland Impacts/Mitigation Project Property Contains a Significant Amount of Wetlands Project Site Design/Layout Planned to Avoid/Minimize Wetland Impacts Total Project Impacts (Plant/Transmission) Currently >400 UMAM Credits Much of the Mitigation Proposed to occur Onsite, with additional Offsite as Needed
29
Wetlands Total/ Wetlands Impacted
30
Water Summary >95% Reduction in Overall Water Needs with the Use of Cooling Towers >99% of Project Water Needs Met by Use of Salt Water for Steam Condenser Cooling Minimal Aquifer and Wetland Impacts from Groundwater Withdrawals Wetland Impacts Minimized and Unavoidable Impacts Fully Mitigated
31